The Role of Energy Efficiency in Utility Energy Planning: Challenges and Solutions

DESCRIPTION

Energy efficiency (EE) plays a critical role in utility energy planning, offering significant benefits that often surpass implementation costs. This guide explores the key challenges of integrating EE into resource plans, including valuing energy savings, estimating capacity benefits, and incorporating non-energy benefits like GHG reductions. It outlines effective budgeting strategies, the importance of evaluation, measurement, and verification (EM&V), and provides insights into utility costs and societal impacts. Implementing a stable funding mechanism is vital for effective EE program delivery.

1 / 13

Download Presentation

The Role of Energy Efficiency in Utility Energy Planning: Challenges and Solutions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy and Environmental Economics, Inc.

  2. Key Challenges/Steps in Integrating EE into Resource Plan • Determining the value of EE • Energy procurement (estimating and valuing savings) • Capacity benefits (estimating and valuing savings, factors in achieving benefits) • Incorporating non-energy benefits (such as reductions in GHG emissions) • Setting targets and allocating budgets • Quantity of EE to implement • Estimating program effectiveness • Institutional difficulty in reallocating budget • Cost expenditure timing vs. benefits • Ensuring program costs are recaptured • Measuring impacts and adjusting resource plans

  3. Efficiency Benefits Shown to Exceed Costs Primary driver for EE in planning is the low cost of energy savings. • Utility cost of EE = $0.01/kWh to $0.03/kWh • Utility program costs and customer costs = $0.03/kWh to $0.05/kWh • Benefits for electric EE = $0.06/kWh to $0.08/kWh Levelized Costs and Benefits from Four Regions

  4. Overall Organization of the Guide

  5. Definitions of Energy Efficiency Potential

  6. Typical Components of Avoided Costs Avoided Component • Electricity Energy (with losses) • Electricity Capacity (with losses) • Natural Gas Commodity (with losses) • Natural Gas Capacity (with storage, and compression) Other Components • Ancillary Services • Transmission and Distribution Capacity • Air Emissions (including greenhouse gas emissions) • Hedge of Fossil Fuel Prices • Price Effect of Demand Reduction • Savings in water, fuel oil, or other value streams

  7. Standard Practice Manual Cost Tests • Utility Cost Test (Program Administrator Cost) • Change in Revenue Requirement • Ratepayer Impact Measure • Impact on rates and non-participants • Total Resource Cost • Total monetized community costs • Societal Cost Test • Total monetized and non-monetized costs • Participant Cost Test • Participant finanical picture

  8. Allocating Budgets • Common barrier to EE is developing a budget to fund programs. • Action Plan Recommendation: • Provide sufficient, timely, and stable program funding to deliver EE where cost-effective. • Two common approaches for funding EE: • Resource planning processes • If EE is a resource, the EE funding will be allocated through planning process based on cost-effectiveness, portfolio risk, energy and capacity benefits, etc. • Cost recovery mechanism should be included to ensure recover EE spending. • Public goods-funded charges • Collected in rates. • Separates the EE budget from the planning process.

  9. Tracking Energy Efficiency Resources in Load Forecasts Note: Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resource Assessment and Support for WGA Policies can be downloaded at http:eetd.lbl.gov/ea/EMS/rplan-pubs.html

  10. Potential Roles of Third-Party Contractors in Providing Energy Efficiency Services and Savings

  11. Evaluation, Measurement and Verification (EM&V) • Evaluation, measurement, and verification (EM&V) is the process of determining and documenting the results, benefits, and lessons learned from an energy-efficiency program. • A rough rule of thumb is to spend 2-5% of the energy efficiency budget on EM&V activities. The specific funding level is a function of the scope and purpose of EM&V and the scale of the efficiency program. It also depends on whether EM&V is conducted at the level of the individual utility or statewide.

  12. Resources and Next Steps • National Action Plan for Energy Efficiency: The Report • Covers key barriers and policy options for EE in resource planning, utility revenue requirements, rate design and program implementation. • Chapter 3: Energy Resource Planning Processes. • Guidebook on Energy Resource Planning and Procurement Processes: Integrating Energy Efficiency(Forthcoming – Spring 07) • A ‘How-to-Guide’ that walks through important methodology and data input assumptions for incorporating EE in the resource planning process. • Will list important sources of data that are commonly used to develop the necessary data and information. • Clean Energy-Environment Guide to Action • A resource document for state air, energy and utility officials and other stakeholders that details 16 policies and strategies that are delivering economic and environmental results for states • Chapter 6.1: Portfolio Management Strategies. • www.epa.gov/cleanenergy/stateandlocal/guidetoaction.htm

  13. For More Information Katrina Pielli Pielli.Katrina@epa.gov (202) 343-9610 Larry Mansueti Lawrence.Mansueti@hq.doe.gov (202) 586-2588 www.epa.gov/eeactionplan Speaker’s contact information Snuller Price snuller@ethree.com (415)391-5100