An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Good RMP Program Mary Peyton Wall Bureau of Air Quality Air Toxics Section October 1, 2009

  2. Introduction • History and applicability • Short overview of RMP program • Compliance inspections • Expectations for a good RMP program • Incident investigations

  3. History & Applicability • Industrial disasters • Bhopal, India • Emergency Planning and Community Right-to-know Act (EPCRA) • Section 112(r) of the Clean Air Act (CAA) • Chlorine – RMP threshold is 2,500 lb • 2 or more one ton cylinders

  4. Program Levels • Level 1 • Specific eligibility requirements • Level 2 • Level 3 • NAICS codes • OSHA Process Safety Management program

  5. Risk Management Program • Three major elements: • Hazard Assessment • Prevention • Emergency Response • Key element is prevention of accidental air releases

  6. Risk Management Program • Risk Management Program refers to all of the requirements in the regulation that are to be implemented at the facility • Risk Management Plan (RMP) refers to the document that summarizes the program, which must be submitted to the EPA

  7. Hazard Assessment • Off-site consequence analysis • Worst-case release scenario • Alternative release scenario • Define off-site impacts • Population • Environment

  8. Hazard Assessment • Update at least once every five years • Release scenarios and off-site population impacts

  9. Prevention Program • Process safety information (PSI) • MSDS • Technology of process: block flow diagram, process chemistry, maximum intended inventory, safe upper/lower limits, consequences of deviations

  10. Prevention Program • Process safety information (PSI) • Equipment in process: materials of construction, piping and instrument diagrams (P&IDs), electrical classification, relief system design, ventilation system design, material and energy balances, safety systems

  11. Prevention Program • Process Hazard Analysis (PHA) • Determine and evaluate hazards of the process: what-if/checklist, HAZOP study • Hazards of process • ID any previous incident which had potential for catastrophic consequences • Engineering and administrative controls

  12. Prevention Program • PHA, continued • Determine and evaluate hazards of the process: • Consequences of failure of engineering and administrative controls • Stationary source siting • Human factors • Evaluation of possible safety and health effects of failure of controls

  13. Prevention Program • PHA, continued • Team with expertise in engineering and process operations • At least one person with experience and knowledge specific to process and one with experience in PHA methodology

  14. Prevention Program • PHA, continued • Address team’s findings and recommendations; resolve in timely manner • Update and revalidate at least once every five years • Maintain all PHAs for life of process

  15. Prevention Program • Operating procedures (OPs) • Develop and implement written OP • Identify safety and health considerations • Identify safety systems and functions • Review as often as necessary and certify annually that OPs are current and accurate

  16. Prevention Program • Training • Overview of process and OPs • Refresher training at least every 3 years • Documentation: name of employee, date of training, verification of understanding • Train new employees ASAP

  17. Emergency Response • Non-responders • Coordinate with local emergency responders • Responding Facilities • Written emergency response plan • Procedures for informing public and emergency response agencies

  18. Emergency Response • Responding Facilities • Written emergency response plan • Proper first aid and emergency medical treatment • Procedures for emergency response • Equipment maintenance • Training for relevant employees

  19. Points to Mention • RMPs must be resubmitted at least once every five years • 2009 resubmit • Electronic submittal (CDX) • No longer report quantities of chemicals in executive summary portion of submitted RMP • Executive summary is FOI-able

  20. Expectations of a Good Program • Chemical Safety Alerts and other hazard warnings • http://www.epa.gov/emergencies/publications.htm#alerts • Implementing an RMP at your facility • Not just what a consultant gives you

  21. Expectations of a Good Program • Effectiveness • Drills • Fire department • Community • Employee awareness • Switch PHA methods • What if/Checklist vs HAZOP

  22. Expectations of a Good Program • Compliance Audits • Regulation requires at least once every 3 years • Perform more often • Use the regulation as a guide • Our inspection does not count as a compliance audit

  23. Expectations of a Good Program • Facility siting • Account for other structures: offices, industries, schools, new construction (i.e., housing boom, shopping centers, etc.) • Consider additional receptors: roads/highways, school bus stops, community events

  24. Expectations of a Good Program • Address near misses • Reasons why they happen • Prevention • Install secondary and tertiary controls/valves • Do not rely on one backup

  25. Expectations of a Good Program • Operating procedures • Address all steps in the process • Write out “understood” processes • Who is responsible for each step, if necessary (i.e., contractor vs facility) • Avoid referencing other documents • Same formats for all procedures

  26. Expectations of a Good Program • Become involved with your Local Emergency Planning Committee (LEPC) • http://yosemite.epa.gov/oswer/lepcdb.nsf/HomePage?openForm

  27. Contacts • Angel Thompson – 803-898-4058 • Connie Turner – 803-898-0341 • Mary Peyton Wall – 803-898-4064 • Heinz Kaiser – 803-898-4089

  28. Questions?