Ex ante-evaluation of Bulgaria-the former Yugoslav Republic of Macedonia IPA CBC Programme 2014-2020. Joint Working Group, Sofia 21/08/2014. Ex-ante evaluation’s main phases and deliverables. May 2014. May 2014. End of June 2014. Beginning of June 2014. End of July 2014.

marilu
Download Presentation

Joint Working Group, Sofia 21/08/2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ex ante-evaluation of Bulgaria-the former Yugoslav Republic of Macedonia IPA CBC Programme 2014-2020 Joint Working Group, Sofia 21/08/2014

  2. Ex-ante evaluation’s main phases and deliverables May 2014 May 2014 End of June 2014 Beginning of June 2014 End of July 2014

  3. Strategic Environmental Assessment (SEA)’s main phases and deliverables May 2014 May 2014 June 2014 Beginning of June 2014 July 2014

  4. Ex-ante evaluation as an iterative process Tight cooperation with programming authorities Timely feedbacks to fit cognitive needs Ex-ante Evaluator Judgments and recommendations

  5. Designing the Bulgaria-the former Yugoslav Republic of Macedonia IPA CBC Programme 2014-2020 Lessons learnt from 2007-2013 programming: • Strategy is backed by a sound and well-grounded socio-economic analysis • Clear demarcation between spheres of interventions and between Priority axes to be ensured • A border region tourism strategy which outlines destinations and services for tourism development • Soft measures and investments are well balanced • Horizontal principles duly considered programming and will be developed during OP’s life-cycle • More tailored and accountable indicators, including methods for baseline and target values, also broken down in categories where possible Involvement of stakeholders: • Develop strategies and propose actions adhering to cross-border needs and demands • Strengthening a sense of collective ownership of Community Policies • Participatory pathway enabling a wide participation of cross-border stakeholders (Main steps: on-line surveys, Regional Consultative Forum, on-line consultations on Draft OP (versions 1.0 and 2.0) • Stakeholders informed about outcomes and tackling methods • On-line instruments and periodic events during Programme implementation

  6. Ex-ante evaluation main findings: Programme strategy 1/2

  7. Ex-ante evaluation main findings: Programme strategy 2/2

  8. Ex-ante evaluation main findings: Horizontal principles Programming phase • Horizontal principles duly taken into consideration in preparatory works and • Participatory pathway • Dialogue with the Ex ante Evaluator Programme implementation • Horizontal principles will be taken into account in the quality assessment for project selection • Monitor horizontal principles at programme and project level • Breakdownindicators (where possible)

  9. Ex-ante evaluation main findings: Financial allocation Financial weighting took into account lessons learned and needs assessment Financial allocation seems to be coherent, balanced and appropriate Financial breakdown per Priority is consistent with identified challenges and needs

  10. Ex-ante evaluation main findings: Indicators, monitoring and evaluation 1/2 Indicators The choice of foreseeing one Result Indicator (RI) for each expected result is sharable, though they must prove not to be overambitious The S.M.A.R.T. analysis proved result and output indicators’ suitability to monitor and verify Programme’s achievements. Nonetheless, some rooms Baseline and target value • Programmespecific result indicators’ baseline valuesestablished where possible on past experience and budget, others to be established through ad hoc surveys • Output indicators’ target values have been established paying attention to envisaged activities, past experience and budget allocation • Need for further clarification on methods for calculating targets • Definition of Strategic Projects (and related requirements, scope and budget) essential for fine tuning the targets

  11. Ex-ante evaluation main findings: Indicators, monitoring and evaluation 2/2 Administrativecapacity The functions and responsibilities of the bodies in charge of the management system are in line with the regulatory framework and well described The indicative list of members of the JMC identify which are the institutions and organizations which will take part in the work of this body, though it must be completed These adjustments should lead to the simplification of the JMC The Programme may involve advisory bodies in the work of the JMC Collection of data and evaluation • The arrangements for the management and control system are explained in detail and are well structured, with a delimitation between institutional and procedural parts • More detailed/clearer criteriastill need to be identified for selecting Strategic Projects

  12. Ex-ante Evaluation’s main recommendations on Draft Final OP (version 3.2 – August 2014) Lessons learnt from 2007-2013 Procedural improvement Programme strategy Clarify synergies between SOs related to competitiveness during the implementation Indicators, monitoring and evaluation Using project forms to monitor implementation & cross cutting issues Administrative capacity Describefunctions of JTS so as to enableitssimplification

  13. Strategic Environmental Assessment (SEA) Objectives Assessing possible impacts on the environment of the Bulgaria-Turkey IPA CBC Programme 2014-2020 (Directive 2001/42/EC and national legislation),taking into account cross-border nature of proposed intervention Providing a qualitative description on the positive and possible negative effects on the environment at SO level Drawing recommendations to prevent and reduceand as fully as possible any significant adverse effectsduring the implementation the Programme Methodology • Iterative process with programming team and cooperation with Ex-ante Evaluator • Literary review of EC guidance documents and reports on the application of the SEA Directive as well as national specific legislation, manuals and guidelines developed by Bulgaria and Turkey • Analysis on Draft OP Main steps • Scoping Report • Consultations on Scoping Report (June 2014) • Draft Environmental Report • Consultations of the Draft of the Environmental Report (underway) • SEA (to be annexed to OP)