Budouc í projekty

Loading in 2 Seconds...

play fullscreen
1 / 38

Budouc í projekty - PowerPoint PPT Presentation


  • 105 Views
  • Uploaded on

Budouc í projekty. Modernizace SLHC SuperKEKB Nové urychlovače ILC CLIC Mionový urychlovač SuperB LHeC. Budouc í projekty. Nuclear physics. 1 CERN 1 ITALY 2 SIBERIA 1 CINA 1 JAPAN 2 USA. Isotopes for Medicine. Colliders. Synchrotron light. Non nuclear Investigation.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Budouc í projekty' - marilu


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
budouc projekty
Budoucí projekty
  • Modernizace
    • SLHC
    • SuperKEKB
  • Nové urychlovače
    • ILC
    • CLIC
    • Mionový urychlovač
    • SuperB
    • LHeC
slide3
Nuclear

physics

1 CERN

1 ITALY

2 SIBERIA

1 CINA

1 JAPAN

2 USA

Isotopes for

Medicine

Colliders

Synchrotron light

Non nuclear

Investigation

Radiotherapy

Industria

Ion implatantion

Hadrontherapy

Accelerators in the world > 15000

slide4
Leptons

Hadrons

COLLIDERS - 2009

VEPP-2000

VEPP-4M

(e+e- 1-4 GeV)

LHC

(p-p 14 TeV)

RHIC

(ions)

KEK-B

(e+e- 10 GeV)

DAFNE

(e+e- 1 GeV)

TEVATRON

(p-ap 2 TeV)

BEPCII

(e+e- 4 GeV)

Future:ILC, CLIC, SuperB,eRHIC, ELIC

21/07/09 Krakow - HEP 2009 C.Biscari - "Accelerators R&D"

slide5
Collider energies

e+ e-

Hadrons

e - protons

slide6
Collider luminosities

e+ e-

Hadrons

e - protons

slide8
SLHC
  • Uvažovaná modernizace LHC pro vyšší luminositu a energii
lhc lhc l upgrade schedule
LHC/LHC L-Upgrade Schedule

Stronger IR quads

PS2-SPL

New low b quads

LINAC 4

sLHC

full

upgrade

to (3-10)e34

“mini”

upgrade

to (1-3)e34

Preliminary planning studies,J-PKoutchouk

mo n sc n e
Možné scénáře
  • Maximální luminosita bez HW změn (fáze 0)
    • Jen 2 IP
    • Zvýšení Nb
    • Max. pole dipólu 9 T
  • Pouze změny interakční oblasti (fáze 1)
  • Podstatné HW změny (fáze 2)
slide15
The KEKB Performance

70 x TeVatron

1,7 x PEPII

210 x LEP

2 x LHC

1 x ILC

Luminosity Records:

  • Peak L = 2.1x1034 cm-2 s-1(2x the design value)
  • Daily ∫Ldt = 1.5 fb-1(2.5 x the design value)
  • Total ∫Ldt ~ 950 fb-1(as of July 2009)

1x1034 cm-2 s-1

slide16
Luminosity Prospects

50ab-1 by ~2020

Results from Belle II @ ~10ab-1

LHC(b)

Prospects of ILC…

L~8x1035 cm-2s-1

10ab-1 (initial target ) ~ 2016

3year shutdown

for upgrade

L~2x1035 cm-2s-1

slide17
Strategies for Increasing Luminosity

Accelerator Physics: Basic terms:

Betatron functions:

Luminosity:

Luminosity:

slide18
Strategies for Increasing Luminosity
  • Smaller by*
  • (2) Increase beam currents
  • (3) Increase xy

Nano-Beam

Option

High-Current

Option

slide19
Design Options

Comparison of Parameters

slide20
Head-on (crab)

22 mrad.

crossing

Crossing angle 22 mrad

crab crossing

(Simulation:K. Ohmi)

Crab Cavities

Installed in KEKB (Feb. 2007)

slide21
Colliding bunches

Belle II

New Superconducting / permanent final focusing quads near the IP

e- 2.1 A

Nano-Beam

SuperKEKB

e+ 3.7 A

Replace long TRISTAN dipoles with shorter ones (HER).

Add / modify rf systems.

Redesign the HER arcs to squeeze the emitance.

Low emittance positrons to inject

Low emittance gun

Low emittance electrons to inject

New positron target / capture section

TiN coated beam pipe with antechambers

slide22
Project Status

SuperKEKB is a lab priority, part of the KEK Roadmap.

The Japanese government has partially approved the project

Funding in other countries on the way (D,SLO, CZ)

We are proceeding with R&D while awaiting full approval of the construction budget request.

line rn urychlova e e
Lineární urychlovač e+e-

Motivace

  • Další fundamentální výsledky lze dosáhnout při ECM~ stovky GeV
  • LHC: 7 TeV
  • Podle shodného mínění nestačí jen jeden urychlovač
  • Ke komplementárním měřením (EW) je třeba e+e-
  • LEP: poslední kruhový urychlovač, po něm musí být elektrony urychlovány lineárně
slide26
Future : e+ e- Linear colliders

High gradient cavities

clic ilc
CLIC ILC
  • Dual beam acceleration technology
  • R&D at CERN ~ 20 y
  • Normal conducting cavities
  • 12 GHz, 100 MV/m
  • Maximum energy 3 TeV cm – Phase I at 0.5 TeV
  • International collaboration around CTF3
  • Well extablished SC rf technology (TESLA, FLASH, XFEL…)
  • Decision in 2004
  • Rf cavities ~ TESLA like
  • 1.3 GHz, 31.5 MV/m
  • Maximum energy 1 TeV cm - Phase I at 0.5 TeV
  • GDE (Global Design Effort) - International collaboration
  • Site independent
slide28
latest news:

28

B.Barish

EPS 2009 G.Geschonke, CERN

line rn urychlova e e1
Lineární urychlovač e+e-

Historie: 3 podobné projekty 0,5-1 TeV

  • TESLA (Hamburg)
  • NLC (USA, patrně SLAC)
  • JLC (Japonsko)
  • CLIC (CERN) 3 TeV, výhled

Mezinárodní dohoda o přípravě 1 urychlovače ILC

  • 2004 výběr technologie (supravodivá)
  • 2005 vytvořena rada Global Design Enterprise (GDE)
  • 2006 cenový strop (7 M$)
  • 2007: šok ve financování v USA a UK
  • 200? výběr místa (DESY, USA, Japonsko, Čína,???)
  • 200?-?? stavba, ...
slide30
Positron source

Three options :

1) Ondulator based

2) Compton backscattering

3) SLC source eW

slide36
Electron Cooling

p

p

Figure-8 collider ring

Snake

e-ion detector

e

e

e

Possible locations

for additional e-ion

detectors

p

SRF Linac

Electron injector

12 GeV CEBAF

eRHIC

PHENIX

Main ERL

(1.9 GeV)

STAR

Beam

dump

Low energy

recirculation pass

Electron

source

USA Initiatives

ELIC at CEBAF

5 GeV e- 5/10/30 GeV p

L 0.4/2.1/4.4 1033

eRHIC at BNL

3/10 GeV e- 50/250 GeV p

L 0.5/2.6 1033

european initiatives
European initiatives

ENC at FAIR

Ecm ~ 13 GeV

L ~1033

LHeC at CERN (RING-RING or LINAC-RING)

60/140 GeV e- 7000 GeV p

L ~1033

slide38
Approximate dates

RDR (CDR) TDRR&DOperation Construction

Proposed

approved