configuration issues from the 23 october 2011 van ercis turkey m w 7 1 usgs eq n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Configuration Issues from the 23 October 2011, Van- Ercis , Turkey, M w =7.1 (USGS) eq PowerPoint Presentation
Download Presentation
Configuration Issues from the 23 October 2011, Van- Ercis , Turkey, M w =7.1 (USGS) eq

Loading in 2 Seconds...

play fullscreen
1 / 22

Configuration Issues from the 23 October 2011, Van- Ercis , Turkey, M w =7.1 (USGS) eq - PowerPoint PPT Presentation


  • 89 Views
  • Uploaded on

Configuration Issues from the 23 October 2011, Van- Ercis , Turkey, M w =7.1 (USGS) eq. Soft ground story Split-level ground story Floor torsion Strong-beam weak-column Very flexible floor system: block infilled joist floor with very weak/flexible beams Captive columns Pounding.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Configuration Issues from the 23 October 2011, Van- Ercis , Turkey, M w =7.1 (USGS) eq' - marie


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
configuration issues from the 23 october 2011 van ercis turkey m w 7 1 usgs eq
Configuration Issuesfrom the 23 October 2011, Van-Ercis, Turkey, Mw=7.1 (USGS) eq
  • Soft ground story
  • Split-level ground story
  • Floor torsion
  • Strong-beam weak-column
  • Very flexible floor system: block infilled joist floor with very weak/flexible beams
  • Captive columns
  • Pounding
split level ground story1
Split-level Ground Story

Elevator core RC wall seen from inside

floor torsion
Floor Torsion

Column built as a Structural Wall

Structural Wall

in the back

floor torsion1
Floor Torsion

All columns at ground level and along the front and side of the building (away from the center of resistance) developed hinges at their bases.

floor torsion3
Floor Torsion

Structural Wall in the back (no damage)

Column built as a Structural Wall

very flexible floor system
Very Flexible Floor System

Column hinging at the base

bayram hotel in van main city collapsed during the m5 6 eq on 11 9 2011
Bayram Hotel in Van (main city)(collapsed during the M5.6 eq on 11/9/2011)

Photo taken on Nov. 1, 2011

bayram hotel
Bayram Hotel

Photo taken on Nov. 10, 2011

source: milliyet.com.tr