construction division plan of work 2012 13 including small sites strategy n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Construction Division Plan of work 2012 – 13 including small sites strategy . PowerPoint Presentation
Download Presentation
Construction Division Plan of work 2012 – 13 including small sites strategy .

Loading in 2 Seconds...

play fullscreen
1 / 12

Construction Division Plan of work 2012 – 13 including small sites strategy . - PowerPoint PPT Presentation


  • 85 Views
  • Uploaded on

Construction Division Plan of work 2012 – 13 including small sites strategy . Neil Stephens. Background. 2 nd year of 3 year plan Implements sector strategy 3 broad areas Asbestos Large sites Small sites Continuity with minor adjustments. Targeted areas. Small Sites (30%)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Construction Division Plan of work 2012 – 13 including small sites strategy .' - marguerite


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
background
Background
  • 2nd year of 3 year plan
  • Implements sector strategy
    • 3 broad areas
      • Asbestos
      • Large sites
      • Small sites
  • Continuity with minor adjustments
targeted areas
Targeted areas
  • Small Sites (30%)
  • Refurbishment (25%)
  • Asbestos (20%)
  • Major Projects/large contractors (10%)
  • Local Priorities (15%)
  • No planned change for 2012-13
achievements
Achievements
  • Over 70 WWT events
  • (Almost) two new WWT groups
  • UKTFA Guidance
  • Simplified website (added over 230 FAQs)
  • LWI Toolkit
  • 3 Busy Builder Sheets
  • Delivered Pye Tait research
  • Over 165 prosecutions (both large and small)
  • 2413 inspections so far in Refurb initiative (3100 contractors)
existing elements that continue
Existing elements that continue
  • WWT
  • Small Sites Strategy (slightly updated)
  • Refurbishment initiatives
  • Improving duty-holder compliance
  • Large contractors project
  • MEWPs (carried over)
  • Health in street-works supply chain initiative
  • Inspection of Temp’ Demountable Structures
  • Major projects
    • Commonwealth Games, HSR2, Second Forth Crossing, NNB, Crossrail
  • Visiting officer work on ELCI and solar panel installation
new work 2012 13
New Work – 2012-13
  • Supply chain initiative with lift installation and maintenance sector
  • Zero cost comms initiative on fragile roofs
  • Review of the agreement with BCA
  • Reviewing what we found in respect of EET
  • Revise HSG 150 & 47 (underground services)
  • JACE Working group
  • 40 Timber Frame Structure interventions
  • Completion of who’s-doing-what in H&S mapping exercise
small sites strategy revised
Small Sites Strategy (revised)
  • Target 15 or fewer (small contractor/business)
  • Concentrate of a few high risk issues
    • WAH, Good Order, Respiratory & Asbestos, Competence.
  • Clear simple advice & guidance (BB Sheets & HSG 150)
  • Support and facilitate WWT
    • Get better buy-in from industry
  • Use material supply route to spread messages & guidance
  • Refresh IND(G) 344 – Essential Toolkit