Geothermal Energy System. Progress Update. Impact. Will cut annual energy use by 50% Will reduce carbon dioxide emissions by 25,000 tons per year Will cut water usage by 8,000,000 gallons per year. Click to add title. Current Construction.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Geothermal Energy System' - marek


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
impact
Impact
  • Will cut annual energy use by 50%
  • Will reduce carbon dioxide emissions by 25,000 tons per year
  • Will cut water usage by 8,000,000 gallons per year
current construction
Current Construction
  • 645 total geothermal wells to serve 15 campus facilities
    • 425’-450’ deep
    • 20’ on centers
  • 624 wells drilled to date
  • Ten percent of campus parking was impacted with 8 lots being out of service at different times
  • Two lots remain under construction with completion scheduled next month
schedule
Schedule
  • Project Design Complete – October 10, 2012
  • Project Advertisement – October 17, 2012
  • Project Pre-Bid – October 30, 2012
  • Bid Opening – November 15, 2012
  • Construction Activities Begin – January, 2012
upcoming construction
Upcoming Construction
  • Trenching for loop piping to begin early Spring 2012
  • Trenching will occur for the entire geothermal loop, but in isolated portions at different timeframes
  • Building mechanical system modifications will be addressed simultaneously