Transit Sustainability Project. Commission Workshop April 28, 2011. Today’s Agenda – Transit Sustainability Project. Introduction Financial Data Summary Draft Financial Principles Look Ahead to Service Delivery and Institutional Issues. Introduction. Steve Heminger Executive Director.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Transit Sustainability Project' - marcin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
transit sustainability project

Transit Sustainability Project

Commission Workshop

April 28, 2011

today s agenda transit sustainability project
Today’s Agenda – Transit Sustainability Project
  • Introduction
  • Financial Data Summary
  • Draft Financial Principles
  • Look Ahead to Service Delivery and Institutional Issues
introduction
Introduction

Steve Heminger

Executive Director

3

financial short and long term problem
Financial: Short and Long Term Problem

Projected Deficits Transportation 2035

why now
Why now?

Severe budget shortfalls in the immediate term.

Service cuts are degrading the transit system.

Long term viability of the existing system is at risk, let alone the ability of the region to provide service expansion.

Need to provide a system that more people will use – customer-focused, not agency-centric.

A robust transit system is fundamental to the mode shift needed for the Sustainable Communities Strategy per SB 375.

The region has a significant opportunity to alter course as budget situation improves.

project approach
Project Approach

18-month project schedule

Commission established Select Committee to inform the project

Technical Analysis supported by advisory committees

Project Steering Committee – transit general managers, labor, advocacy community, business community

Staff Technical Advisory Committees – financial and service planning staff from transit agencies and CMA representatives

Public outreach as technical analysis advances

Technical Analysis

financial data summary
FinancialData Summary

Alix Bockelman, Director

Programming and Allocations

7

bay area large operators percent change in cost and performance indicators 1997 2008
Bay Area Large Operators: Percent Change in Cost and Performance Indicators (1997 – 2008)

Source: National Transit Database, “Big 7” only.

Excludes ferry, cable car and paratransit.

slide9
Major Modes: Aggregate Percent Change in Cost & Performance Indicators (1997-2008, adjusted for inflation)

SFMTA, AC Transit,

VTA, SamTrans,

GGBHTD

Caltrain

SFMTA, VTA

BART

Source: National Transit Database, “Big 7” only.

Excludes ferry, cable car and paratransit.

2008 operating costs big 7 operators nearly 2 billion
2008 Operating Costs – “Big 7” Operators Nearly $2 billion

Wages and fringe benefits account for over 75% of O&M costs.

Source: National Transit Database, “Big 7” only.

Includes ferry, cable car and paratransit.

operator base wage consistent with peer agencies
Operator Base Wage Consistent with Peer Agencies

Top Hourly Wage Rates Adjusted to Bay Area Cost of Living

Hourly Wage

Source: "ACCRA Cost of Living Index, 2009 Annual Average Data," prepared by the Council for Community and Economic Research, as cited by Dash & Associates. Dash & Associates, Agency data

* As of July 1, 2010

** As of June 2009

operator wages summary findings
Operator Wages – Summary Findings
  • Region’s base operator wage rates are higher than many peers, but when adjusted for the cost of living, appear reasonable
  • Increases in the base wage rates were higher than inflation, but lower than the overall regional wage index
  • Total wage costs grew faster than inflation:
    • Also affected by work rules, which are distinct from base wage rate
    • Staffing levels, which affect total wage costs
  • Recommendation: no further analysis of operator base wage rate, and more analysis of work rules and staffing levels
review of fringe benefit cost trends
Review of Fringe Benefit Cost Trends
  • The “Big 7’s” total fringe costs have increased from $355 million in 1997 to $601 million from 1997 to 2008.
  • Increase of 69% after adjusting for inflation.

“Big 7” operators;

Source: National Transit Database

13

peer analysis of funded pension liability as of june 2008
Peer Analysis of Funded Pension Liability (as of June 2008)

The region’s pension plans are mostly

funded; however, unfunded costs in the

region total $482 million.

Sources: Agency CAFRs

[1, 2] Data as of June 30, 2008, from Pew Center on the States report entitled “Trillion Dollar Gap,” dated February 2010.

[3] Based on S&P 500 Indices

14

fringe benefits summary findings
Fringe Benefits – Summary Findings

Fringe benefits are a major cost driver both over the short and long term

Both health care costs and pension obligations are areas of concern, requiring increasing percentages of agencies’ operating budgets over time

Pension funding appears to be in relatively good shape; however, unfunded liability of nearly $500 million remains (as of June 2008)

Lower projected investment returns would increase unfunded pension liabilities

Issue is not unique to transit agencies

15

work rules analysis
Work Rules Analysis
  • Current rules are the result of a long history of collective bargaining agreements and agency specific practices
  • Rules impact how transit service is delivered and the cost of delivering service
  • Scenarios tested provide possible areas of consideration and do not represent agency policy directive

16

annual work rule cost saving estimates
Annual Work Rule Cost Saving Estimates

Total Estimated Annual Savings: $38M – $46M

Figures in chart based on mid-range estimates

  • Savings result from:
  • Reduced overtime
  • Reduced time paid when
  • not working
  • No reductions in service or
  • base wage rate

17

work rule cost analysis summary findings
Work Rule Cost Analysis – Summary Findings

18

Areas of potential savings vary significantly among agencies

Key work rule changes can potentially save significant operating costs by removing unproductive time

Some improvements are possible under existing contracts

Actual implementation of specific work rule changes is under the purview of transit agencies and labor representatives during the collective bargaining process

business model contracting
Business Model – Contracting

19

  • Many examples of service contracting throughout California and the nation
        • Some are legacy (e.g. SamTrans)
        • Others are more recent transitions intended to lower overall operating costs
        • Mix of 100% or partial service contracting
      • Savings result from both:
        • More efficient work rules and practices
        • Lower hourly rates and benefits
      • Service quality considerations raised as a potential issue
slide20

-DirectlyOperated - Contracted

Fixed Route Bus Cost and Service Delivery Comparison

Cost per vehicle service hour FY09

Fixed route bus only

All agencies use union drivers.

Contracted portions of Golden Gate,

and VTA services not included.

Source: National Transit Database

20

slide21

Service Contracting Examples

Percent Contracted:

1OCTA moving to 30% outsourcing

Source: 2009 NTD

21

annual savings from partial service contracting
Annual Savings from Partial Service Contracting

Total Estimated Annual Savings: ~$30M – $40M

22

section 13 c considerations
Section 13(c) Considerations

Section 13(c) requirements may impact potential cost savings

Each transit agency has its own 13(c) agreements with different requirements and conditions

Section 13(c) provides certain protections to existing transit employees who are affected by federally-funded projects

A high-level review of 13(c) is being undertaken as part of the TSP to assess the potential impact of Section 13(c) requirements on any proposed recommendations

A review of each transit agency’s Section 13(c) provisions could be undertaken based on the results of the initial analysis and proposed recommendations coming out of the TSP

23

staffing levels administrative cost relative to peers
Staffing Levels: Administrative Cost Relative to Peers

Note: Data includes all modes except Vanpools, Paratransit, SFMTA Cable Car, and Ferry.

Bay Area Large Operators: BART, SFMTA, SCVTA, GGBHTD, AC Transit, and SamTrans

Source: National Transit Database 2008

24

staffing levels summary findings
Staffing Levels – Summary Findings

25

  • Findings
    • Bay Area operators dedicate a higher percentage of operating budgets to administrative costs than peers
    • Bay Area administrative cost per service unit is mixed compared to peers
    • Based on 2008 NTD data; many agencies have since experienced layoffs and hiring freezes, so a more careful look is needed
  • Recommended next steps for staffing levels
    • Analyze further as part of institutional analysis:
      • Collect more detailed and current data from all agencies
      • Refine peer analysis framework
cost containment strategies summary
Cost Containment Strategies Summary

Potential annual regional savings if cost containment strategies applied regionally: approximately $235 million

Represents approximately 10 to 12% of annual operating costs

*More detailed analysis currently underway; estimated savings will be updated

as information is available.

26

big 7 revenue composition in billions
"Big 7" Revenue Composition ($ in billions)
  • Revenue picture is different for
  • smaller operators

Source: MTC Statistical Summaries

28

bay area big 7 farebox and sales tax revenues figures in millions
Bay Area "Big 7": Farebox and Sales Tax Revenues(Figures in $ millions)

Observations:

Sales Tax Revenue unpredictable and lower in real terms than in 1997; decreasing trend likely.

Farebox revenue higher in real terms and more in agency control

Source: MTC Statistical Summaries

29

possible approach
Possible Approach
  • MTC could set performance targets for:
    • Improved efficiency
    • Controlled cost growth
    • Stable operating revenues
  • Each transit agency/board would decide what specific changes (e.g. work rules, pension programs, administrative costs, etc) to make in order to meet those targets
financial principles and targets framework
Financial Principles and Targets Framework

Principles

Targets

Example Strategies

32

draft financial principles1
Draft Financial Principles

Draft Principles

#1

Improve

Operating

Efficiency

#2

Control

Cost

Growth

#3

Stabilize

Operating

Revenues

Targets

Reduce cost per hour of service

by 10% (after adjusting

for service fluctuations)

Potential target of ~10% reduction in operating costs

appears reasonable

33

draft financial principles2
Draft Financial Principles

Draft Principles

#2

Control

Cost

Growth

#1

Improve

Operating

Efficiency

#3

Stabilize

Operating

Revenues

Targets

Keep any real increases in

operating cost per hour/mile

equal to or less than increases

in amount of service provided

34

draft financial principles3
Draft Financial Principles

Draft Principles

#1

Improve

Operating

Efficiency

#2

Control

Cost

Growth

#3

Stabilize

Operating

Revenues

Targets

a) Secure increased and more reliable funding equal to X% of

regional operating costs

b) Create regional operating reserve of X% annual operating

costs as hedge against revenue fluctuations

35

performance framework
Performance Framework
  • Incentive-based funding allocations
  • Reward operators that meet certain performance thresholds with regional discretionary funds:
    • TDA (~$270 million annually)
    • STA Population-based (~$30 million annually)
    • FTA funds (~$350 million annually)
  • Condition new funds on meeting certain performance standards
    • Regional gas tax (estimated to generate roughly $300 million annually)
    • County sales taxes
    • Other new dedicated fund sources

Figures based on FY2012 Fund Estimate and recent FTA appropriations.

discussion of draft principles
Discussion of Draft Principles
  • How do we make principles and targets meaningful?
    • Condition funding on meeting targets:
      • Option A: Any new regional funding source
      • Option B: Any increase in funding from today’s levels
      • Option C: Some portion of current funds
  • MTC role in achieving regional targets
look ahead to service delivery and institutional issues
Look Ahead to Service Deliveryand Institutional Issues

Carolyn Clevenger

TSP Project Manager

38

service analysis
Service Analysis

System-wide:

Evaluate existing performance

Regional Services:

Assessment of transit competitiveness

TransBay, Express, and Feeder Services

Analysis of ADA-paratransit

Sub-regional Service Analysis:

East Bay and Peninsula

service outcomes
Service Outcomes
  • System-wide:
    • Consistent performance metrics to evaluate service performance
  • Regional Services:
    • Strategic plans for TransBay, Express and Feeder services
    • Evaluate where transit is most competitive relative to market demand, land use, etc.
    • ADA-paratransit delivery options
  • Sub-regional Service Analysis:
    • Service plans for Inner East Bay and Peninsula
    • Strategies to improve service delivery and increase rider convenience of multi-operator services
performance metric framework
Performance Metric Framework
  • Evaluate the existing system performance using consistent metrics
  • Transit services will be differentiated by type of service (e.g. regional all-day services, urban trunk, local network, community bus, etc.)
  • Performance metrics related to service effectiveness (productivity) and service efficiency (cost effectiveness) will be used to evaluate current system performance by service type
  • Metrics can be used to evaluate system performance over time, and inform future MTC investment decisions and performance-based allocation policies
applications of transit competitiveness index tci
Applications of Transit Competitiveness Index (TCI)

Expand competitive

markets

Transit Agency Resource Allocation

Reduce service in uncompetitive markets

  • Land use density

Identify Partnerships with Local Jurisdictions

  • Transit priority on local streets
  • Parking Price & Supply
  • Pedestrian environment

Support Public Outreach & Funding Proposals

  • Transit supporters/advocates
  • Voters
  • Neighborhoods
slide43

TCI Example: VTA Comprehensive Operations Analysis

Origin

Destination

Both

< 25

25 - 50

50 - 100

100 - 200

> 200

43

slide44

TCI Example: VTA Comprehensive Operations Analysis

Core Network Routes

Core Network

BRT Corridors

44

Comprehensive Operations Analysis

44

44

sub regional service analysis inner east bay
Sub-Regional Service Analysis – Inner East Bay
  • Focus on BART and AC Transit
  • Collaborative effort with transit agency staff actively engaged to analyze transit service in the Inner East Bay
  • Outcomes:
    • Comprehensive service and market review of AC Transit and associated BART service
    • Service planning concepts that:
      • examine coordination opportunities between AC and BART services
      • identify gaps and/or duplication in terms of service coverage (by location and/or time of day)
      • identify resource requirements for service improvements
sub regional service analysis peninsula caltrain corridor
Sub-Regional Service Analysis – Peninsula Caltrain Corridor
  • VTA and SFMTA recently completed comprehensive evaluations of their respective service areas; SamTrans is currently undertaking a similar effort
  • TSP effort will focus on:
    • Trips between service areas
    • Connections with Caltrain
    • Implementation of recommendations from previous efforts
  • Will work with transit agency staff to identify priority areas for analysis
service analysis discussion
Service Analysis Discussion
  • Performance metrics:
    • Performance-based allocation policies?
    • What options would you like us to consider?
  • Regional Analysis:
    • Should MTC play a more active role in defining and funding regional services (TransBay, Express and Feeder services)?
    • In addition to the TCI tool, what additional tools/information would be useful to evaluate services?
  • Sub-regional Analysis:
    • Are there specific issues in the Inner East Bay or Peninsula you would like us to consider?
regional transit network
Regional Transit Network

Multiple Services/Shared Service Areas

Examples:

  • Transbay
    • AC, BART, ferries
  • Peninsula
    • BART, Caltrain, SamTrans, VTA
  • East Bay Suburban
  • Marin/Sonoma
slide50

Complex Decision-making Structure

  • Bay Area has 28 transit agencies and 228 transit decision makers
    • 11 Service providers governed by local City Councils or County Board of Supervisors
    • 15 Districts/Authorities/Agencies with Appointed Members
    • 2 Districts with elected board of directors
  • Service and fare policy decisions are understandably agency-centric
  • Challenge at regional level is to knit together a network that works for passengers
examples of recent institutional challenges
Examples of Recent Institutional Challenges
  • Caltrain financial plan
    • Financial reliance on three distinct boards
    • Competing needs and priorities
  • SMART implementation
    • Multiple jurisdictions
    • System overlays existing inter-county and local bus services
    • Competing needs and priorities
  • Clipper implementation
    • Multiple and complex fare structures
    • Inconsistent policies and practices for customers
institutional analysis approach
Institutional Analysis Approach

Analyze opportunities and challenges of different institutional models

  • Functional consolidation or coordination
    • East Bay Paratransit Consortium
    • LAMTA model
  • Agency consolidation
    • Geographic: ACTC and SolTrans examples
    • Modal consolidation: Regional Rail Plan concepts
    • Multi-modal: WMATA model
    • Multi-functional: VTA – combined CMA, sales tax, and transit agency
institutional discussion
Institutional Discussion
  • What information would be helpful for you in evaluating institutional structures?
  • Are there specific models or questions you would like us to focus on?
  • How should we effectively engage local transit agency boards and local stakeholders?