Spectrometer Solenoid Fabrication Update

Spectrometer Solenoid Fabrication Update. Vendor still expects to complete fabrication of first magnet before Christmas Unit #1 cold mass assembly is ready to install in vacuum vessel, cold mass supp’ts load tested

manning
Download Presentation

Spectrometer Solenoid Fabrication Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spectrometer Solenoid Fabrication Update • Vendor still expects to complete fabrication of first magnet before Christmas • Unit #1 cold mass assembly is ready to install in vacuum vessel, cold mass supp’ts load tested • Other Unit #1 progress: vacuum vessel, thermal shield and support stands fabrication complete • Winding of 2nd magnet including banding complete • Installation of quench protection system and instrumentation in 2nd magnet is under way • Cryocooler testing conducted by Bert Wang and Mike Green is to be complete this week

  2. Magnet warm bores and inner thermal shields

  3. Outer thermal shield

  4. Vacuum vessel outer shell

  5. End walls and flanges

  6. Support structure assembly

  7. Cold mass support load testing

  8. Completed cold mass assembly