HT-7. ASIPP. Daily operation report May 18-19, 200 4. Operation team III 赵君煜 ,吴振伟,朱玉宝,凌必利,朗芳, 童兴德,高丽,丁永华,潘亚平,徐强. HT-7. ASIPP. Schedule. 上午, 控制机器( PC) 打补丁, 杀毒. 10:00~24:00开始放电, PSI 抽气速率与加料位置对壁滞留的影响。 shots# 68811~68863 ne(0)~1.0E19m-3, Ip~100KA, It~3800~3900A
E N D
HT-7 ASIPP Daily operation report May 18-19, 2004 Operation team III 赵君煜,吴振伟,朱玉宝,凌必利,朗芳, 童兴德,高丽,丁永华,潘亚平,徐强
HT-7 ASIPP Schedule 上午, 控制机器(PC)打补丁, 杀毒. 10:00~24:00开始放电, PSI抽气速率与加料位置对壁滞留的影响。 shots# 68811~68863 ne(0)~1.0E19m-3, Ip~100KA, It~3800~3900A 24:00~08:00, IBW(28.5MHz),和IBW+LHCD实验。 shots# 68880~68920 ne(0)~1. 25E19m-3, Ip:120~130KA, It~3200~4200A LHCD~200KW; IBW~250KW
ASIPP Fueling & Pumping effect on WR (May 19) Yang Yu Pumping effect: Fueling effect: Conclusion: Difference is not clear with the present measuring configuration.