An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WBS5 Central Instrumentation/Data Acquisition and Controls G. E. Oliaro for the Computer I&C, Network Engineering Groups and NSTX I&C Team Princeton Plasma Physics Laboratory NCSX CDR 5/22/02 Princeton NJ 08543 G. E. Oliaro Slide 1

  2. Primary Design Basis of WBS 5 • The NCSX Design Leverages the NSTX Technology and Experience Base and Provides a Low Risk - Cost Effective Implementation. • Commercial-Off-The-Shelf (COTS) • Maximize Use of Open Source (Free) Software • Just-In-Time Design & Purchase • Steer Current NSTX Upgrades to Benefit NCSX • Network • CAMAC Replacement to CPCI & PCI • Synchronization System • Plasma Control (FIMM) • CAMAC Instrumentation Will Not Be Used In Design • Maximize Use of Experience Base at PPPL G. E. Oliaro Slide 2

  3. W. Davis J. Dong T. Gibney R. Marsala D. Mastrovito P. Roney P. Sichta K. Tindall J. Wertenbaker G. Zimmer NSTX I&C and Data Acquisition Team G. E. Oliaro Slide 3

  4. WBS 5 Project Elements • WBS 51 TCP/IP network Infrastructure • WBS 52 Central Facilities I&C • WBS 53 Diagnostic Data Acquisition and Facility Computing • WBS 54 Facility Timing and Synchronization • WBS 55 Real Time Plasma and Power Supply Control System • WBS 56 Central Safety and Interlock System • WBS 57 Control Room Facility G. E. Oliaro Slide 4

  5. WBS 51TCP/IP Network Infrastructure • Requirements • Provide Common Backbone For All NCSX Data Communications • Support >1GB of Data Per Shot • Minimum 100Mbps and 1Gbps (10Gbps?) links • Cost Base is 10/100Mbps • Isolation of Physics, Engineering & Plant facilities • Firewall protection to Engineering & Plant networks from outside world • Fiber Optic network infrastructure for machine platform environment • Total of 150 Network Drops throughout NCSX Facility at D-Site and C-Site • Share Engineering and Physics Subnet with NSTX to Allow Seamless Sharing of Common Resources G. E. Oliaro Slide 5

  6. TCP/IP Network Infrastructure • Hub and Fiber Patch Points at 5 PPPL Locations • Use Existing C-Site to D-Site Fiber Optic Runs • Non-TCP/IP • 24 fibers C-Site/D-Site for Plasma Control/Utility I&C • Timing and Synchronization • 96 Diagnostic Fiber Optic Cables Between Test Cell and Control Room G. E. Oliaro Slide 6

  7. WBS 52Central Facilities I&C • Requirements • Supervisory Control and Monitoring to All Engineering Subsystems Using Standard Distributed Control System (DCS) Functions • Provide Machine Operations Control, Timing and Synchronization With Other Operating Machines at PPPL • Experimental Physics and Industrial Control System (EPICS) Distributed Control System (DCS) • Well Established World Wide User Community and Successful Use on NSTX • Multi-Platform & OS Base • Multiple I/O Capability: PLCs, PCI, CPCI, CAMAC, VME • Standard DCS Capabilities • Trending • Alarms & Alarm Logging • Graphical Mimics, Control & Monitoring G. E. Oliaro Slide 7

  8. Central Facilities I&C • Support 10-12 Day One Engineering Subsystems with Expansion Capabilities G. E. Oliaro Slide 8

  9. WBS 53Diagnostic Data Acquisition and Facility Computing • Design Requirements • All Data Available Online for Life of Machine • Access to All Engineering Process Control Data • Growth for >1GB of Data per Shot • Redundancy • All Data on RAID 5 • Battery Backup Cache • Dual Power Supply • Auto Configured Hot Spare RAID 5 Disk • Archive 3 Copies of Raw & Process Data • Nightly Backup of Local Data Acquisition Computer & Central Data Server • Data continuously Maintained on Central RAID 5 Storage Array G. E. Oliaro Slide 9

  10. Diagnostic Data Acquisition and Facility Computing • MDSplus (MIT) Set of Tools • Setup, Data Acquisition, Post-Processing Analysis, and Display • Pulsed Mode Experiments • Access to Data With Unified Methods • MDSplus Ported to UNIX • MDSplus Clients Run on VMS/Unix/Windows. • Interfaces to FORTRAN, C, Java, IDL, Visual Basic, and LabView. • Deploy 7 Remote Data Acquisition I/O Processors • VME, CPI, CPCI (Compact PCI) • Deploy Primary UNIX Based MDSplus Data Acquisition Server • Augment PPPL Facility Tape Backup System to 0.5 to 1.0 PB • Augment PPPL Facility Compute Cluster G. E. Oliaro Slide 10

  11. WBS 54Facility Timing and Synchronization • Single Clock Generator with Multiple Receiver System • Two Approaches Using Existing Designs • Use the BNL/ORNL-Spallation_Neutron_Source (10 MHz) timing system • Upgrade NSTX (TFTR) Design to Current Technology Base G. E. Oliaro Slide 11

  12. WBS 55Real Time Plasma and Power Supply Control System • Use Existing Hardware and Software System In Use For NSTX • Two Merlin 4 333MHz PPC Boards (20+ GFLOPS Total) • Clone Software With Parameter Changes for NCSX • Power Supply RTC (PSRTC) Software • GA Plasma Control System (PCS) Software • Add 64 Digitizer Channels in NCSX Test Cell in Two Crates • Systran FiberExtreme Fiber Channel (1 Gbps) to Power Supply Building • DMA (160MBps) Into Array Processor Using PPPL Developed FPDP Input Multiplexing Module (FIMM) G. E. Oliaro Slide 12

  13. WBS 56Central Safety and Interlock System • Multi Site • Access Control at Doors • Door Interlocks • E-Stop • Input from 10 subsystems • Fail Safe Design • Redundant PLC • Outboard Electro-Mechanical Watch Dog Timers • Hard Wire Backup – Planned At This Time… • Uninterruptible Power Source • EPICS Monitoring G. E. Oliaro Slide 13

  14. WBS 57Control Room Facility • Requirements • Minimum of 3200 sq.ft. Main Control Room (Same As NSTX) to Support Collaborative Research • 600 sq.ft. Diagnostic Rack Space Against Test Cell • Raised flooring. • 25 dual workstation tables wired for network and power. • 12-15 equipment racks wired for network and power. • Expandable closed circuit TV system with 3 PTZ cameras • Test Cell PA system • Diagnostic machine microphones data included in MDSplus tree • Dual screen, multi window “comfort” display system • Wireless Ethernet for the Physics network to support visitors and laptop computers G. E. Oliaro Slide 14

  15. WBS 5 Cost & Schedule Breakdown • 5 Central I&C $4,115K 9.8%Cont. $403K • 51 TCP/IP Network Infrastructure $716K 5.0% $36K • 52 Central Facilities I&C $978K 10.0% $98K • 53 Data Acquisition & Facility Computing $641K 16.0% $103K • 54 Facility Timing & Synchronization $676K 14.0% $95K • 55 Real Time Power Supply Control $374K 8.0% $30K • 56 Central Safety Interlock System $409K 8.0% $33K • 57 Control Room Design $320K 3.0% $10K G. E. Oliaro Slide 16

  16. Conclusions • The NCSX Design Leverages the NSTX Technology and Experience Base and Provides a Low Risk - Cost Effective Implementation. • Low Schedule Risk - Mirrors Actual NSTX Experience • Backend Loading Saves Cost and Optimizes Technology Choices • PPPL IT Infrastructure Upgrades Today Will Benefit NCSX • Technology Chosen Empowers Small (<10) Experienced NSTX Team G. E. Oliaro Slide 17