html5-img
1 / 3

Interior and Exterior Demo Continue

4/16/12 – 4/20/12. Dust Control Measures for Air Quality Management Per LEED Construction Plan. Interior and Exterior Demo Continue. Iconic Birdcage Removed from Structure. New Gas and Water Service Underground Started. Exterior Continue Demo of Atrium Begin Removal of Stairwells

madra
Download Presentation

Interior and Exterior Demo Continue

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4/16/12 – 4/20/12 Dust Control Measures for Air Quality Management Per LEED Construction Plan Interior and Exterior Demo Continue Iconic Birdcage Removed from Structure

  2. New Gas and Water Service Underground Started

  3. Exterior • Continue Demo of Atrium • Begin Removal of Stairwells • Finish Gas and Water Line Utility Services • Interior • Complete all temporary walls for Phase 1 • Saw Cut of Dining Level Slab for Removal • Complete temporary office space in 1927 Wing • Remove remaining ceilings and MEP Overhead • Health Inspector Page Turn of CD Documents NEXT WEEK LOOK AHEAD PROJECT MEETINGS HELD BIM Coordination Meeting

More Related