1 / 12

GFP Module Functional Requirements A subset of the IUID Registry

GFP Module Functional Requirements A subset of the IUID Registry. 2 February 2011. Purpose. Ensure traceability and transparency of GFP process in DoD Ensure accountability requirements are met for property in contractor stewardship

madison
Download Presentation

GFP Module Functional Requirements A subset of the IUID Registry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GFP Module Functional RequirementsA subset of the IUID Registry 2 February 2011

  2. Purpose • Ensure traceability and transparency of GFP process in DoD • Ensure accountability requirements are met for property in contractor stewardship • Ensure single face to industry, program managers, contracting community (including DCMA property community) and property managers • Replace 1662 capability

  3. GFP Tracking - Long term vision Focus here first 1. Authorization 2. Provision and Receive 3. Update/Use Contract GFP Attachment IUID Registry GFP Module UII’d Non-UII’d 4. Return Business Intelligence

  4. Authorization: GFP data defined in Solicitations and Contracts(per PGI245.2) For: GFP Attachment Data: Type Designation - R Part Number -O Manufacturer -O Quantity/Unit of Measure - R Nomenclature - R NSN -O Part/Model number - O UII – for serialized items only - O As Is - R Cost - O Marking Instruction (New clause) Serialized items Non-serialized items Items requisitioned through Supply System (non-reimbursable)

  5. Provision and Receive GFP Property Transfer Govt Property Transfer Contractor Property Receipt WAWF Property Transfer Doc (856) IUID Registry IUID May occur Regulations already Require contractor receipt GFP Module UII’d Will occur Non-UII’d Material Receipt Acknowledgement (527R) Supply Req’n Contractor Supply Receipt DAASC Supply System

  6. Return GFP Embedded in deliverable Returned reparable Returned as-is IUID Registry IUID GFP Module WAWF UII’d Non-UII’d Nondiscrete Consumption End of Contract Disposition=return PCARSS

  7. The GFP Module Today • Automated custody updates via WAWF Property Transfer for IUID’d items • Electronic and manual custody updates of IUID’d items • Automated interaction with LTDD and PCARSS for GFP dispositioning of IUID’d items mid- and end of contract • Automated capture of 527R and identification of GFP transactions for supply system transfers

  8. The GFP Module Today • 527R Processing • DAAS feed to Registry with All 527R transactions • Edits sort Non-GFP transactions • Key on Transaction DOAACs and Signal Code • Resulting transactions stored in tables in the Registry • What we have learned • 527R MRAs alone will not insure capture of all GFP transactions • Lack of Contract numbers make it difficult to audit / reconcile transactions • Enhanced DLMS capability not being leveraged

  9. The GFP Module Today • 527R Processing

  10. GFP Module Next Steps • Consume WAWF non-UII’d property transfer messages (after July 11) • Provide user interface for manual updates of non-UII’d GFP information • Implementation of visibility of the full GFP lifecycle • Enhanced Reporting

  11. Schedule • UII GFP receipt and transfer – available • 527R fulfillment – available • Addition of contract and order number pending • Reparable Receiving Report (WAWF) – available • LTDD/PCARSS updates of UII items – available • UDF Block Upload Data Submit to GFP Module – Jun 11 • Non-UII GFP receipt and transfer via WAWF (5.1) – Jul 2011 • Initial GFP Reconciliation Report – Jun 11 • Manual update of condition/state in Registry – Dec 2011 • Store contract list of GFP – Dec 2011 • LTDD/PCARSS update of non-UII items – Jun 2012

  12. Challenging situations • An item comes to the contractor with a UII, but it is not registered • The contractor receives multiple repair items with NSN only and needs to indicate condition code – how to differentiate (all are required to have existing serialization) • Warranty returns – custody/ownership • Discrepancies and unexpected events • A non-UII’d item becomes UII’d • Mid-contract disposition (e.g., BER)

More Related