Collecting Multiple Indirect Inspection Results with One Pass

Collecting Multiple Indirect Inspection Results with One Pass. Gord Parker, Spectrum External Line Inspection Technologies SIEO Winter 2008 – Sun Valley. PHMSA R&D Forum (Feb.06) Data Mining/Threat Assessment Topic.

mabyn
Download Presentation

Collecting Multiple Indirect Inspection Results with One Pass

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Collecting Multiple Indirect Inspection Results with One Pass Gord Parker, Spectrum External Line Inspection Technologies SIEO Winter 2008 – Sun Valley

  2. PHMSA R&D Forum (Feb.06)Data Mining/Threat Assessment Topic • “I would like a GPS meter that was designed to integrate with CIS, DCVG, Soil Resistivity, Depth of Cover and ACVG. All this equipment is separate and does not integrate. I have seen CIS meters collect GPS, but not post process sub-meter/sub-centimeter GPS. Since the actual location is in my opinion the most important feature, the GPS equipment should be the center piece to the data acquisition process.” • Hart Smalley, Mears

  3. Multiple Indirect Inspections • Field work is expensive & often frustrating. • Since you’re there walking down the ROW, since all the groundwork has been laid (land owners, access, crews, vehicles, miles of trailing wire, etc.) you may as well make the most of it.

  4. GPS • Now, one of the first bits of data people want to know about their pipelines. • Where is it, where are the things around it • You can now easily measure the distances between points of interest • The basis of a Geographical Information System (GIS)

  5. Scaleable GPS • There are 3 common levels of GPS accuracy • ‘Single-ended’ (5-8m) – consumer & non-corrected • ~$100-300 • Sub-meter (better than 1m) – WASS/Omnistar • ~2000-5000 • Centimeter (inch) – RTK correction • ~12,000+ • System should be able to use required accy.

  6. GIS • The data collected is some of the data that can be used to ‘fill’ the database behind a Geographic Information System. • Land use, features, water, etc. can all create or improve existing knowledge of the ROW • GIS functions may include integrity assm’t. • Reports aiding maintenance planning, digs, mitigation are printed based on this data.

  7. Digital Photos • A picture is worth 1,000 words. • Document activity by ROW users, facility condition, landscaping, ROW overgrowth

  8. Dig Pictures

  9. Pipe Locator • Locate Training is a must. • Locator keeps you on top of the pipe while the GPS is collecting data. • May also include other tests ACCA/ACVG. • Locate position data may show up on data collector screen, reducing the number of devices you need to look at.

  10. Pipeline DOC • Used correctly, a locator should be within 5% • Modern ones do not require calibration • Shallow pipe is a major threat to safety • Don’t forget to account for a radius • All locators report depth to centerline, ideally the software should do this calculation on the fly • A couple brands communicate with data collector thus reducing data entry.

  11. ACCA Introduction • AC Current Attenuation • A method of determining coating quality from above ground. • Simply: Current is generally lost where there are coating problems. • Apply a known current and measure at distance intervals to see where it is lost. • More loss/distance = worse coating. • Current loss can also indicate unknown connections, insulator and casing problems

  12. dB Current • Expressing current loss as a ratio to current before the loss is more accurate. • Losing 50 mA of current from 500 mA is worse than losing 50 mA @ 2000 MA. • deciBels are a ratio, so they more accurately show the percentage of signal loss.

  13. Current Attenuation Graph

  14. Typical ACCA Survey Results

  15. ACVG • AC Voltage Gradient • Like DCVG / Pin-to-pin / similar but uses a transmitter, not the CP DC • Sizing similar to DCVG

  16. Sonar / Water Depth • For water crossings, this is a very good way of finding both the depth of water and the depth of the pipe. • Subtract the depth of water from pipe DOC to find depth of cover under water

  17. Leak Surveys • Some methane detectors have serial data or analog level outputs. • Survey systems can also record this data, giving a documented position and concentration of the leak. • Can record concentration continually or just when instructed.

  18. CP Close Interval Surveys • Now have processing power to show full waveform, • You can see full curve of interruption, ensure that period is suitable. • Tag reading(s) as P/S, near ground, far ground, IR met. • Properly filtered voltmeter will not usually see effect of locate transmitter.

  19. Field Notes, pH, Resistivity • Defined fields for text to accompany survey and/or be printed on reports. • Fields for soil/electrolyte pH readings. • Fields for soil resistivity • Haven’t found a device that measures these and has a communication method, so entry is also done manually.

  20. Land Use, ROW Features • Also very important to GIS - Inventory of: • Facilities, valves • ROW markers, aerial markers • CP rectifiers, test posts, • Land use, (arable cropland, native grasses, etc.) • ROW access, slope, water bodies, roads, trails

  21. Raw data logs • Can provide additional data security and operator auditing • May record *all* inputs continually, showing where the operator was, when, speed, etc.

  22. Putting it all Together

  23. Bringing Data into PC

  24. Report Generation • This is what took a lot of time AND delayed both cash flow and acting on the data. • Every hour of field work may take ½ to 2 hours of office work to compile the data and create meaningful charts & graphs. • This is where programming has improved the process.

  25. Thank You • Questions? • Gord Parker, C.E.T. • Spectrum XLI (Calgary, Alberta) • 403-585-2397 • gord.@spectrumxli.com • www.spectrumxli.com

  26. Spectrum XLI System A comprehensive solution for ECDA Indirect Inspections and GIS data collection. Hardware and software designed for the collection, analysis and reporting of eXternal Line Inspection survey data.

  27. XLI Survey Data • Geodetic (Scalable GPS Receivers) • GIS data - Land Use, State and Status • - Right of Way Inventory • Digital Photography • Plus any 3 of the following • Pipeline Location, Depth of Cover, ACCA • 2nd Coating Condition Test (ACVG, DCVG) • or Cathodic Protection (Annual Adjustive & CIS) • Depth of Water • Leak Surveys