The HVAC upgrade project for Roosevelt Elementary in the Council Bluffs Community School District involves the replacement of ventilation units, heat pumps, and water heaters for improved energy efficiency and indoor air quality. Additionally, bipolar ionizers and filters will be installed as an add alternate. The project timeline includes bids opening in March 2022 and an anticipated completion date of August 2022 with an estimated cost of $933,800.

maali
Download Presentation

HVAC Upgrades for Roosevelt and Edison Elementary Schools

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HVAC Upgrades Roosevelt Elementary COUNCIL BLUFFS COMMUNITY SCHOOL DISTRICT

  2. Project Scope • Replace existing ventilation units with new units equipped with energy recovery, cooling, and heating. Units shall be designed for low dewpoint discharge. • Replace old heat pumps (approx. 20) and right-size with new ventilation units. • Replace four existing water heaters in poor condition with two new ones. • As an add alternate, provide bipolar ionizers and additional filter for all heat pumps serving classroom and assembly spaces through the facility. EDISON ELEMENTARY SCHOOL

  3. Project Overview: Scheduling • Plans available for Contractors: February 2, 2022 • Pre-Bid Walk-thru: February 16, 2022 • Bid Date: March 2, 2021 • Board Approval March 8, 2022 • Anticipated Notice to Proceed Date: March 15, 2022 • Anticipated Completion Date: August 1, 2022 PROJECT OVERVIEW

  4. Construction Opinion of Cost Estimated Construction Cost: Add Alternate: Bipolar ionizer/filtration: Contingency (10%): Total: $759,000 $98,900 $70,200 $933,800 PROJECT OVERVIEW