Status of GBRA Water Supply Projects Region L Meeting March 19, 2009. Projects. Projects under Study Lower Basin Project Storage above Canyon Mid Basin Project Gonzales County Project Brazos Valley Project Alternate Supply to Coleto Creek. Lower Basin Project.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Status of GBRA Water Supply Projects Region L Meeting March 19, 2009' - lynch


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
projects
Projects
  • Projects under Study
    • Lower Basin Project
    • Storage above Canyon
  • Mid Basin Project
  • Gonzales County Project
  • Brazos Valley Project
  • Alternate Supply to Coleto Creek
mid basin gonzales diversion 25 000 af
Mid-Basin –Gonzales Diversion – 25,000 af

Maximum Diversion – 75,000af

77777

guadalupe river diversions @ gonzales
Guadalupe River Diversions @ Gonzales*

*Subject to Hydrologic Assumptions and Environmental Flows

project status
Project Status
  • GBRA has submitted an application to TECQ for Water Rights
  • GBRA is requesting the project be evaluated for incorporation into the 2011 Regional Water Plan
  • GBRA will hire a consultant to prepare the plan in accordance with Region L planning criteria
  • GBRA plans to submit plan to Region L in August for review
gonzales county project11
Gonzales County Project
  • Conjunctive use project:
    • Provides firm water supply of 25,000 acre-ft/yr, maximizing use of renewable surface water supplies and using groundwater when surface water supplies are unavailable
    • Provides opportunity for aquifer recovery during wet and normal hydrologic conditions when more surface water is available
gonzales county project12
Gonzales County Project

San Marcos

Lockhart

1-30

Luling

coverage of regional groundwater models
Coverage of Regional Groundwater Models
  • Texas Water Development Board’s Groundwater Availability Models (2004)
    • Southern Carrizo-Wilcox, Queen City and Sparta (SCWQCS GAM)
    • Central Carrizo-Wilcox, Queen City and Sparta (CCWQCS GAM)
  • San Antonio System-HDR Model
    • South Central Carrizo System (SCCS)
project status14
Project Status
  • GBRA is requesting the project be evaluated for incorporation into the 2011 Regional Water Plan
  • GBRA will hire a consultant to prepare the plan in accordance with Region L planning criteria
  • GBRA plans to submit plan to Region L in August for review
project status19
Project Status
  • GBRA is requesting the project be evaluated for incorporation into the 2011 Regional Water Plan
  • GBRA will hire a consultant to prepare the plan in accordance with Region L planning criteria
  • GBRA plans to submit plan to Region L in August for review