Constellation Space Transportation Planning Office July 30, 2009 - PowerPoint PPT Presentation


  • 128 Views
  • Uploaded on

Constellation Space Transportation Planning Office July 30, 2009 . Charter Evolution CSTP Implementation Plan Program and Technical Authority Relationships. Agenda. Constellation Space Transportation Planning Office Charter. SOMD Established with concurrence of ESMD in December 2008

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Constellation Space Transportation Planning Office July 30, 2009' - lucille


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Constellation space transportation planning office july 30 2009 l.jpg

Constellation Space Transportation Planning OfficeJuly 30, 2009


Agenda l.jpg

Charter

Evolution

CSTP Implementation Plan

Program and Technical Authority Relationships

Agenda


Constellation space transportation planning office charter l.jpg
Constellation Space Transportation Planning Office Charter

  • SOMD Established with concurrence of ESMD in December 2008

  • Develop methodology and corporate processes to manage NASA Human System Operations activities while continuing to develop further NASA Human Systems capabilities

  • Constellation Space Transportation Program

    • Manage the production, sustaining engineering, launch preparations, and recovery of the Ares I/Orion vehicle configuration that will transport crew safely to/from the ISS

    • ESMD/CxP will manage DDTE test flights through Certification completion

    • SOMD/CSTP will manage post-DDTE operations flights


Status of cstp implementation plan l.jpg
Status of CSTP Implementation Plan

Effective November 23, 2008

FY11

FY12…

FY09

FY10

  • Establish Project Offices/Managers

  • Partner Sub-System Managers assignments

  • Establish Sharing for DDTE Production Engineering with MSFC and JSC

  • Facility and System O&M

  • Support T&E Flight Tests

  • Initiate definition of Program Processes

  • Continue Program Planning, Prepare Program Plan

  • Develop System Integration Plan

  • Define Production Structure and WBS Structure

  • Establish Planning Office

  • Prepare draft Formulation Authorization Document

  • Initiate Multi-Center agreements for Program support

  • Initiate CSTP WBS Structure with CxP

  • Prepare initial CSTP level II FY10-15 resource requirements


Slide5 l.jpg

Constellation Space Transportation

Planning Office - Evolution

12/04/2008

SOMD/ESMD letter establishing CSTPO

  • 12/10/2007

  • Out-brief to Administrator

  • Bill Hill team kicked off

06/11/2008

KSC Implementation Plan submitted to Bill Hill team.

2009

2007

2008

May

Nov

Mar

Jul

Jul

May

Sep

Jan

Jul

Mar

Sep

Jan

Nov

Mar

May

Hawes-Geyer Team

Methodology for Development & Operations

Bill Hill Team

Implementation of Hawes-Geyer Recommendations

CSTPO

Feb

Dec

Apr

Oct

Jun

Feb

Apr

Jun

Aug

Dec

Aug

Apr

Oct

Feb

Jun

  • 09/24/2008

  • Out-brief to SMC

  • Agency approved

  • CSTPO Kickoff

07/2009

CxP CSTP Strategic Alliance Agreement Signed

10/18/2007

Out-brief to SOMD/ESMD

02/2007

Hawes-Geyer Team Kickoff

05/20/2008

Status to SMC


Constellation space transportation program l.jpg

Established a partnership between ESMD and SOMD

Post-DDTE Programmatic Structure with authority and responsibility for:

Program control, including budget, schedule, and program content

Maintaining requirements baseline

Maintaining technical capability to perform systems engineering within established performance criteria

Maintaining configuration control system and Certification of Flight Readiness process

Manufacturing and Production of the flight and ground hardware to support the manifest.

Directing pre-launch processing, launch execution, mission operations, recovery operations, and turnaround operations

Partnering with ISS Program Customer and Mission Operations Directorate at the JSC

Constellation Space Transportation Program

End State


Constellation evolution l.jpg
Constellation Evolution

CxP

DDT&E

CSTP

Production and Operations


Slide8 l.jpg

Operations Program Imbedding

into Development Program


Summary l.jpg

Operations Program Planning established early enough to

Gain Sub-System Sustaining Design Experience

Participate in Flight Hardware Evolution

Create Solid Engineering Relationships

Operations Program Elements imbedded at all critical levels

Sub-system engineering

SE&I Development and Products

Mission Planning and Operations Elements

Program and Program Elements

SMA and Engineering Technical Authority

NASA recognizes the unique demands of pursuing development and operations within Human Space Systems. We have a solid programmatic plan to provide space system operations while developing the next series of exploration Human Space Systems