1 / 19

Corporate HSE MS Audit Q4 2003 Briefing Package

HSE Audit / HSE Case Roll Out Presentation. Slide 2. PDO HSE MS Audit Overview. ScopeCovers entire PDO operationsCombines 3 scheduled SIEP Audits -(PDO HSE MS, Occupation Health and Drilling Audits) to liberate time and optimise PDO Resources. Areas Marmul (Harweel), Qarn Alam, and a

lotte
Download Presentation

Corporate HSE MS Audit Q4 2003 Briefing Package

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. HSE Audit / HSE Case Roll Out Presentation Slide 1 Corporate HSE MS Audit (Q4 ‘2003) Briefing Package

    2. HSE Audit / HSE Case Roll Out Presentation Slide 2

    3. HSE Audit / HSE Case Roll Out Presentation Slide 3 Preparatory Activities Complete Identification of High Risk Issues Execution of Directorate Preparatory Audits Weekly session with OND/OSD nominated representatives Timely close- out of Action Items from pre-audits SIEP Engagement Coaching PDO Audit Team Members Engage MDC Members on HSE-MS Requirements

    4. HSE Audit / HSE Case Roll Out Presentation Slide 4

    5. HSE Audit / HSE Case Roll Out Presentation Slide 5 2000 audit main concerns Complex HSE-MS structure Asset integrity & safety management Competency gaps Lack of accountability Contract management gaps

    6. HSE Audit / HSE Case Roll Out Presentation Slide 6 Concerns Tolerance of non-conformances Significant asset integrity issues Competence assurance Contract management gaps Main risks not assessed Lack of accountability

    7. HSE Audit / HSE Case Roll Out Presentation Slide 7 Non-conformances Multiple A.I. issues in RED (some for years) Mandatory training overdue HSE Cases outdated for years and RAP close out overdue SLAs outdated for years (N.B. organisation changed) 2003 T/T’s yet to be agreed Competence HSE critical positions not all assured Unauthorized overrides

    8. HSE Audit / HSE Case Roll Out Presentation Slide 8 Asset integrity issues Birba flare problems unresolved since 1996* Also in HSE Case Remedial Action Plan ! SR Oil Station: flare pilot & ignition system inoperable; no flame out detection W.I. Pumps problems for years*, requiring overrides 13 overrides, 4 approved, 2 overrides for no reason Many REDs: OND`: 263 REDs Few mitigating measures found on site OND has commenced base survey * since commissioning

    9. HSE Audit / HSE Case Roll Out Presentation Slide 9 Competence assurance gaps Low pace of CA&A implementation HSE critical positions not all with CA&A Assessor problems: Not enough Competence issues Overdue mandatory training Contract & assistant operators not in CA&A Overdue mandatory training HSE advisor without valid driving permit PTW refresher Gas tester Al Katheery staff in QA no fire & chem. training Some PDO & Contractor HSE advisors not competent

    10. HSE Audit / HSE Case Roll Out Presentation Slide 10 Contract management Good system Contractor access to PDO web LCC is an admirable initiative Implementation gaps with monitoring Disjoint between CH & CSRs CH & CSR overloads LCCs classified on “paper” PDO exposure LCC poor on corrective action LCCs with many expats Cheap contracts lead to HSE exposure Poor contractor HSE plans

    11. HSE Audit / HSE Case Roll Out Presentation Slide 11 HEMP in PDO PROCESSES: Simple fit for purpose PTW manual covering standard work hazards, but …. Q-pulse is powerfulPROCESSES: Simple fit for purpose PTW manual covering standard work hazards, but …. Q-pulse is powerful

    12. HSE Audit / HSE Case Roll Out Presentation Slide 12 Positive findings Infrastructure: QA PAC & OBM yard, MRL Camp, Web access for all Focus: Propulsion project, OSD HSE Plan, STOP Processes: OSD good monitoring of technical integrity Performance: QA CPP gas supply 100% up for 4 years MRL: (days without LTI) QA: (days without LTI) 652 570 &……….Staff

    13. HSE Audit / HSE Case Roll Out Presentation Slide 13

    14. HSE Audit / HSE Case Roll Out Presentation Slide 14 HSE Risk Management Demonstration (regulator, shareholder Major hazards of installation Quantitative risk assessment Safety-critical activities Latent failures Execution (Minor) hazards at the workplace Qualitative risk assessment Hazardous activities Active failures

    15. HSE Audit / HSE Case Roll Out Presentation Slide 15

    16. HSE Audit / HSE Case Roll Out Presentation Slide 16 An Introduction to PDO’s HSE Cases &

    17. HSE Audit / HSE Case Roll Out Presentation Slide 17

    18. HSE Audit / HSE Case Roll Out Presentation Slide 18

    19. HSE Audit / HSE Case Roll Out Presentation Slide 19 HSE Case Is A ‘Live’ Document - What Does This Mean?

    20. HSE Audit / HSE Case Roll Out Presentation Slide 20 KOD A – Utilisation & Application of an HSE Case