An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nanticoke TAT Progress 2004 Statewide Tributary Action Team Conference March 13, 2004 Presented by: Alan Girard

  2. Overview • Nanticoke Watershed Status • Progress to Date • Next Steps

  3. PCS Status • TMDL Promulgated in December 1998 • Nanticoke TAT formed in 2000 • January 2003: Final Team PCS Recommendations submitted to DNREC • DNREC convened PCS Workgroup to identify agriculture reduction efficiencies • Determine Future Implementation goals • 2004?: Promulgation of Recommendations

  4. TMDL - Total Maximum Daily Load • Point sources • Biological Nutrient Removal or equivalent from Bridgeville, Laurel, & Seaford WWTP • Remaining point sources capped • Nonpoint sources • 30% reduction of TN • 50% reduction of TP • Implementation through a Pollution Control Strategy

  5. Baseline Nutrient Loadings and Required Reductions • Baseline loads based on 1992 land use • Nitrogen: 10,357 lbs/day • Phosphorus: 347 lbs/day • Loading reductions • Nitrogen: 3,107 lbs/day • Phosphorus: 173 lbs/day • We may need to increase our goals to be in compliance with the CBP

  6. Wastewater • PCSs currently in place • Holding tank compliance program (18 tanks) • PCS recommendations • On-Site Wastewater Disposal System (OSWDS) compliance program • Retrofit existing OSWDS with nutrient reducing technologies (14,778 tanks) • The On-Site Wastewater Corporation developed performance standards for use in Delaware

  7. Storm water • BMPs currently in place • Of the 24,624 acres of developed area, approximately 1,074 acres are being treated by storm water structures and filtration devices • Several combined sewer overflows in Seaford were eliminated

  8. Reductions to Date

  9. Stormwater Septic Achieved Progress so far 64% 84%

  10. Next Steps • Making final revisions to draft PCS for submission to DNREC • Evaluating feasibility of establishing a standing TAT committee