SESAME PSS

SESAME PSS. Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC 2012. Contents:. 1.Radiation Monitors (?) 2. Plan and time schedule for PSS 3. Equipment of the PSS (inside the tunnel) 4. Equipment of the PSS (outside the tunnel)

lok
Download Presentation

SESAME PSS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC 2012

  2. Contents: 1.Radiation Monitors (?) 2. Plan and time schedule for PSS 3. Equipment of the PSS (inside the tunnel) 4. Equipment of the PSS (outside the tunnel) 5. Procedures defined for the PSS 6. Acknowledgment

  3. Radiation Monitors (?) Rules: Keep radiation level < 1mSv over one year (2000 h), 0.5 µSv/h Purchasing of Radiation Monitors in progress (expected June 2013): - 5 movable combined stations connected to PSS through interlock signals. - 2 portable Gamma. 2 portable Neutrons. 2 Gamma spectrometers and calibrations kits outside tender/later. Passive: - Gamma dosimeters/ SESAME. - Neutron TLD’s outsourcing (JAEC).

  4. Plan and time schedule for PSS • - The Personal Safety System of SESAME must comply with norm IEC 61508 (SIL-3) • All SIL-3 equipments must be approved from Jordan Institution for Standards and Metrology (JISM) Organization??? • The contractor will be responsible for providing all the hardware and software of PSS. • Tasks will be Shared between contractor and SESAME as follows: • Contractor tasks: • 1. Programming the PSS PLCs by a certified PLC programmer. • 2. Assembling and installing the PSS cabinets (Booster tunnel & Control room PSS cabinets) • 3. Training SESAME staff for safety PLC programming. • 4. SAT in cooperation with SESAME staff. • 5. Providing the drivers needed to connect PSS PLCs to monitoring system of PSS. • 6. Providing the documentation.

  5. Plan and time schedule for PSS b) SESAME tasks: Installing the PSS field hardware and connecting the interlock signals to the cabinets terminals. (an electrical technician should be hired) All field cabling and installing cable trays. SAT in cooperation with contractor. Monitoring system for PSS by EPICS (control team + PSS engineer) Preparing the final documentation of PSS.

  6. Plan and time schedule for PSS

  7. Equipment next to Booster Tunnel Door (D1) Connected to PSS PSS cabinet with Restricted Access capability 1.1 4 Light panels 1.2 2 restricted access keys 1.3 Emergency Stop Push Button 1.4 Card reader 1.5 Contact Control room 2. Magnets light indicators 3. Evacuation Horn light Attached to the door 2 different lockers 5. Next to the door from inside Open door Push button (P) Next to the door from outside 6.1 Radiation Monitor 6.2 Camera 7. Fire detector (F.D) F.D

  8. Equipments inside the tunnel connected to PSS • 1. 4 Search Push Button (S) • 2. 7 Emergency Push Button (E) • 3. 2 speakers (sp) • 4. 2 (Horns, beacon) (H) • 5. Fence • 6. 4 light indicators • (ON and OFF) for: • Bending Magnets • Pulsed magnet • 7. Fire detector

  9. Procedures defined for PSS Search the tunnel Accessing the tunnel in restricted mode Emergency stop of the machine Intrusion to the tunnel Open the tunnel Safety fault Interlocks from radiation monitors Beam ON RF system, pulsed and bending magnets enabling(interlocks) An example (next page)

  10. Emergency Stop procedure

  11. Monitoring system forPSS

  12. Acknowledgments: 1- Adli Hamad (SESAME) 2- David Fernandez (Alba)

  13. THANK YOU FOR YOUR ATTENTION