1 / 72

NorthSTAR Webinar October 2019

NorthSTAR Webinar October 2019. Agenda. Introduction. Department of Mineral Resources. Introduction. Michael Ziesch – Project Sponsor, DMR Katie Haarsager – Organizational Change Management Lead, DMR Bryan Campbell – Lead Business Analyst, Solution Provider

lindsay
Download Presentation

NorthSTAR Webinar October 2019

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NorthSTAR Webinar October 2019

  2. Agenda

  3. Introduction Department of Mineral Resources

  4. Introduction Michael Ziesch – Project Sponsor, DMR Katie Haarsager – Organizational Change Management Lead, DMR Bryan Campbell – Lead Business Analyst, Solution Provider Correna Hula – Project Manager, Solution Provider Thom Kerr– Ground Water Protection Council Our mission is to encourage and promote the development, production, and utilization of oil and gas in the state in such a manner as will prevent waste, maximize economic recovery, and fully protect the correlative rights of all owners to the end that the landowners, the royalty owners, the producers, and the general public realize the greatest possible good from these vital natural resources.

  5. Northstar overview • NorthSTAR will used by North Dakota operators and regulators who submit any reporting into ND Oil and Gas Division. • It is a cloud based application designed to help manage information by streamlining operations, simplifying processes, providing a better way for Operators and Division to collaborate, collect and analyze data. NorthSTAR (North Dakota Statewide Tracking and Reporting System) is North Dakota’s version of the Ground Water Protection Council’s well management system: RBDMS (Risk Based Data Management System)

  6. Project update Department of Mineral Resources

  7. NorthSTAR Schedule R1.0 April 2019 R4.0 ~3 Months R2.0 January 2020 R3.0 ~9 Months • Bond Management • Entity Management • General • Permits • Completions • Tests • Transfers • Sundry • Inspections • Facility (Part 1) • Production • Hearing and Docket • Facility (Part 2) • Compliance • Incidents

  8. Release 1 – Now Live NorthSTAR is live and accessible for all external organizations. Features now live consist of the ability to view your organization details and verify entity name and other contact information which may be submitted through the Form 2 – Organizational Report. Release 1 allows you to add additional personnel to your organization who may need access to submitting reports. Bond details are available to view in NorthSTAR. R1.0 April 2019 • Bond Management • Entity Management • General

  9. Release 2 – January 2020 Permitting – Operators will have the ability to submit their Application for Permit to Drill and Application for Injection (formerly known and Form 1 and Form 14) through NorthSTAR. Completions – Operators will have the ability to submit Well Completion or Recompletion report and Plugging Reports (formerly known as Form 6 and Form 7) through NorthSTAR. Tests – Operators will have the ability to upload test results performed on Well or Facility Components Transfers – Operators in need of transferring ownership can utilize NorthSTAR to submit the proper documentation and paperwork to complete a transfer. This online form will allow for both organizations involved in the transfer as well as the surety company involved to interact on the same online form to successfully complete a transfer. Sundry – Operators will have the ability to submit sundry forms notifying the OGD of work completed, notifying the OGD of the intent to perform work, or requesting waivers to OGD policies or rules. R2.0 January 2020 • Permits • Completions • Tests • Transfers • Sundry

  10. Release 2 walk-through Department of Mineral Resources

  11. Application for permit • Form 1 Instructions for Permit to Drill (Vertical or Directional Well) • Form 1H Instructions for Permit to Drill (Horizontal Well • Form 14 Application for Injection

  12. Well Completion or Plugging Report • Form 6 Well Completion or Recompletion Report • Form 7 Plugging Report

  13. Upload Test Results • Bottom Hole Pressure Test • Drill Stem Test • Fluid Level Test • Gas Analysis • Gas-Oil Ratio • Oil Analysis • Production Test • Water Analysis

More Related