william mccormack place designing for sustainability l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
William McCormack Place Designing for Sustainability PowerPoint Presentation
Download Presentation
William McCormack Place Designing for Sustainability

Loading in 2 Seconds...

play fullscreen
1 / 10

William McCormack Place Designing for Sustainability - PowerPoint PPT Presentation


  • 111 Views
  • Uploaded on

William McCormack Place Designing for Sustainability. Department of Public Works. Manages portfolio of approximately 820,000m 2 Both owned and leased from private sector Approximately 56% owned. William McCormack Place. William McCormack Place. Sheridan Street Cairns

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'William McCormack Place Designing for Sustainability' - lilly


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
department of public works
Department of Public Works
  • Manages portfolio of approximately 820,000m2
  • Both owned and leased from private sector
  • Approximately 56% owned
william mccormack place4
William McCormack Place
  • Sheridan Street Cairns
  • 4 storey commercial office building
  • 4568m2 NLA
  • Developed, owned and managed by DPW
  • $17.6M including fitout and public art
william mccormack place5
William McCormack Place
  • Project approval in 2000
  • Appointment of managing contractor in 2001
  • Completion of the design development stage in May 2001
  • Commencement of site works in May 2001
  • Practical completion in July 2002
  • Fully occupied July 2002
william mccormack place6
William McCormack Place

Requirements

  • Commercial viability
  • Ecologically Sustainable Design
  • Tenant requirements
  • Simplicity of design
william mccormack place7
William McCormack Place

Requirements

  • Flexibility
  • Whole-of-life cost benefits
  • Redundancy of plant and equipment
  • Providing jobs and improving skills in regional areas
william mccormack place8
William McCormack Place

Constraints

  • Climate
  • Location
  • Budget
william mccormack place9
William McCormack Place

Results

  • Achieved 5 Energy Stars
  • First commercial office building in Australia to achieve 5 stars
  • Continuing Performance
william mccormack place10
William McCormack Place

Awards

  • FMA SEDA - FM Environmental Achievement Award (2004)
  • Australian Property Institute (Qld) – Environmental Development Award (2004)
  • Property Council of Australia (Qld) - High Commendation, Rider Hunt Award (2004)
  • Department of Public Works – Innovation and Creativity Award (2004)