network pilot studies summary report acwi february 21 2008 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Network Pilot Studies Summary Report ACWI February 21, 2008 PowerPoint Presentation
Download Presentation
Network Pilot Studies Summary Report ACWI February 21, 2008

Loading in 2 Seconds...

  share
play fullscreen
1 / 19
lilly

Network Pilot Studies Summary Report ACWI February 21, 2008 - PowerPoint PPT Presentation

90 Views
Download Presentation
Network Pilot Studies Summary Report ACWI February 21, 2008
An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Network Pilot StudiesSummary ReportACWIFebruary 21, 2008

  2. National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributaries • Charge to ACWI from Council on Environmental Quality (CEQ) and National Science and Technology Council (NSTC) accepted in February, 2005 • ACWI accepts report in January, 2006

  3. Nineresource compartments Fixed station and probabilistic designs Core variables and sampling frequencies specified Provisions for data comparability, management & access A continuum of Observations Estuaries Nearshore Offshore and EEZ Great Lakes Coastal Beaches (BEACH Act) Wetlands With Flow and Flux from Rivers Atmosphere Groundwater Structure of the Design

  4. Pilot Studies • January, 2007 Cabinet Committee on Ocean Policy asks ACWI to design and conduct Pilot Studies, target date January 2008 • Pilot Study request for statements of interest widely distributed with due date of February 23, 2007 • Responses: --Albemarle-Pamlico -- Ashepoo-Combahee- Edisto --Delaware Bay --Gulf of Maine --Gulf of Mexico --Lake Michigan --Pascagoula River --Potomac --Puget Sound --San Francisco Bay

  5. Pilot Study Selection Criteria • Identify and commit resources, including in-kind contributions • Agree to complete Pilot Study and prepare draft report by January, 2008 • Ability to leverage on-going Federal efforts and cooperative efforts in study area

  6. Pilot Study Tasks • Identify Management Issues • Inventory Current Monitoring • Identify Gaps • Investigate Data Comparability and Data Sharing Issues • Estimate Costs of Current and Needed Monitoring • Prepare Report

  7. Pilot Study Characteristics

  8. Habitat Degradation Contaminants Sediment Management Nutrient Enrichment Non-indigeneous Species Oxygen Depletion Harmful Algal Blooms Pathogens Habitat Restoration Loss of Native Species Wetland loss, alteration, status Management Issues

  9. Data Management, Access, and Delivery

  10. Gap Analysis • Detailed comparison of on-going monitoring and Network design • Monitoring in Pilot Studies does not fully meet the Network design • Gaps in number of sites, sampling frequency, and need for additional analytes

  11. Gap Analysis • Need for local flexibility in adding tributary rivers (Delaware and Lake Michigan) • Flexibility in decisions about biological measurements incorporated into refinement of Network design (San Francisco)

  12. Cost Estimates (in $1000s)

  13. Multi-year Effort • Phase I - Network Design(FY 05 & 06) • Phase II - Develop and carry out Pilot Studies(FY 07 & 08) • Phase III - Demonstration Projects(FY 08 & 09) • Phase IV – Implementation; fill gaps and provide necessary enhancements to existing monitoring programs (FY 10 and beyond)

  14. FY 08 Plans • Improve data sharing capability • Add gaging stations and/or data collection at important tributaries for Network estuaries • Begin to fill gaps identified by Pilot Studies

  15. FY 08 Plans • Lower Mississippi River above the Old River Diversion • Hudson River • Delaware River • Brazos River • Apalachicola River • Connecticut River

  16. FY 08 PlansLake Michigan Pilot • Add nutrient monitoring as necessary at 20 river sites to bring monitoring up to tier 1 suite of measurements • Possibly add measures of contaminants in fish tissue

  17. FY 08 PlansSan Francisco Bay • Physical measures of flow between and among different parts of the Bay • Investigate controls on nutrient levels--phytoplankton density and nutrient measurements

  18. FY 08 PlansDelaware Bay • Add nutrient monitoring in river, estuary, and Bay • Improve the watershed-to-ocean observing system web site to facilitate data sharing