Alliancing with Network Rail Patricroft Station

An Area West presentation. Peter Gerring. Alliancing with Network Rail Patricroft Station. 25/04/2012. Alliancing Day. Works underway Compound Subway Platform. Alliancing Day. Before and after Compound Graffiti. Alliancing Day. Before and after Graffiti Pathway litter.

liana
Download Presentation

Alliancing with Network Rail Patricroft Station

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An Area West presentation Peter Gerring Alliancing with Network RailPatricroft Station 25/04/2012

  2. Alliancing Day Works underway Compound Subway Platform

  3. Alliancing Day Before and after Compound Graffiti

  4. Alliancing Day Before and after Graffiti Pathway litter

  5. Alliancing Day Before, during and after The road bridge

  6. Alliancing Day Before and after Pathway vegetation

  7. Alliancing Day The team together – Northern and Network Rail alliancing

  8. An Area West presentation Peter Gerring The SQ AuditPatricroft Station 04/05/2012

  9. Subsequent Audit Failures Sign defaced Graffiti removal patch painting Hole in wall

  10. Subsequent Audit Failures No Smoking Sign torn away Graffiti on copping stones and platform surface

  11. Subsequent Audit Failures Shelter dirt in corners Shelter dust under seat Shelter dust on seat Shelter roof damaged

  12. Subsequent Audit Failures BT Phone missing Paint flaking on platform wall Wall surface crumbling with loose bricks Litter bag missing

  13. Subsequent Audit Failures Seat rusty Urine patch underneath seat in shelter Cobwebs evident in shelter Flaking paint on steps up to platform

  14. SQ Score SQ Score before Alliancing:72.5% SQ Score after Alliancing: XX.X%

  15. Long term gain!