1 / 12

CEMSIS FIKS-CT-2000-00109

CEMSIS FIKS-CT-2000-00109. C ost- E ffective M odernisation of S ystems I mportant to S afety Deryk Pavey,. CEMSIS Objectives. Programmable Instrumentation and Control (I&C) safety systems (e.g. protection) safety-related systems (e.g. control, data presentation)

liam
Download Presentation

CEMSIS FIKS-CT-2000-00109

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CEMSISFIKS-CT-2000-00109 Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, wp6_beg010_v0_1_fisa slides.ppt

  2. CEMSIS Objectives • Programmable Instrumentation and Control (I&C) • safety systems (e.g. protection) • safety-related systems (e.g. control, data presentation) • Common approach to development and safety justification • maximise safety • minimise cost • Modernisation/Refurbishment • analogue/discrete logic replacement with computer-based systems wp6_beg010_v0_1_fisa slides.ppt

  3. ‘Stakeholders’ in CEMSIS • Nuclear Plant Operator • British Energy (co-ord.) UK electricity generation • Electricite de France F electricity generation • British Nuclear Fuels UK nuclear fuel processing • Suppliers & System Integrators • Framatome ANP DE C&I supplier • Sycon International SE system developer • Safety Authorities & Assessors • AV Nuclear B inspection and licensing • Adelard UK safety consultancy • Software Reliability Specialist • TU Lund SE research & education wp6_beg010_v0_1_fisa slides.ppt

  4. Key Issues • Harmonisation & Structuring of Safety Justification approaches • Definition of Requirements for Systems Important to Safety • Use of Pre-Existing Software in Systems Important to Safety • potentially including class A systems • Use of Graphical Languages in Systems Important to Safety wp6_beg010_v0_1_fisa slides.ppt

  5. Safety Justification Survey and Framework Safety Justification Framework WP1 Requirements Capture Survey and Lifecycle Requirements Capture Guidelines WP2 Case Studies: UK: fuel reprocessing F: PWR I&C replacement SE: safety monitoring WP5 Pre-Existing S/W Strategy & Techniques Pre-Existing S/W Guidelines WP3 Graphical Languages Review and Evaluate Graphical Languages Report WP4 WP0,6 Management and Dissemination Work Package Tasks wp6_beg010_v0_1_fisa slides.ppt

  6. Safety Justification Framework • Take account of current EU experience • EC NRWG Task Force on Safety Critical Software (ARMONIA) • Survey of practices in CEMSIS Member States • Synthesis of survey responses • Main trends and consensus • Problem areas to address in CEMSIS work packages • methods for structuring software safety cases • clarification of concepts such as ‘COTS’ • safety justification should take account of plant level risk analysis • how to make best use of diversity • how to evaluate software reliability (CMF the major factor) wp6_beg010_v0_1_fisa slides.ppt

  7. (existing system, new needs, regulations, standards) (stakeholders: sponsors, users, designers, regulators etc.) (specification + rationale) • Taxonomy criticality, complexity, reuse, novelty, cost, timescales etc. Refurbishment levels Requirements Capture • Requirements Lifecycle • Discovery • Analysis • Negotiation • Definition and Validation • Survey of requirements techniques, research and experience. wp6_beg010_v0_1_fisa slides.ppt

  8. Pre-existing Software • Including “COTS” (Commercial Off The Shelf) • Strategy: Two phases • “Pre-qualification” - reduce uncertainty and delay • provide evidence in advance for all applications • Application Qualification - some always needed • provide evidence specific to one application • Types of assessment • Functional - ensure features of product are adequate for safe use • Dependability - evidence that the product is sufficiently reliable • taking account of its safety class wp6_beg010_v0_1_fisa slides.ppt

  9. White box without Experience White box with Experience Grey box without Experience Grey box with Experience Black box with Experience Black box without Experience A - Complex AW A - Medium A - Simple AW / AB AB B - Complex BG B - Medium BG / BB BB B - Simple BB • AW: white-box assessment of class A products • AB: black-box assessment of class A products • BG: grey-box assessment of class B products • BB: black-box assessment of class B products Pre-existing Software (2) • Taxonomy & Strategies for Dependability Assessments wp6_beg010_v0_1_fisa slides.ppt

  10. Temp Press & Trip Graphical Specification Languages • Functional Requirements - safety risk of: • error in formulation • omission • misunderstanding etc. • Integrity - safety risk of: • underlying inconsistency or ambiguity • invalid verification results or reasoning • incorrect transformation into code • Reports: • evaluation of available languages • advice on safety justification wp6_beg010_v0_1_fisa slides.ppt

  11. Application and Evaluation • Three Case Studies: • UK Nuclear fuel reprocessing plant control BNFL • I&C replacement on a French PWR EDF • Safety monitoring system on a Swedish NPP Sycon • Identify safety and cost-relevant aspects • safety requirements • implementation options • example arguments for safety justification • Evaluate and refine guidance documents wp6_beg010_v0_1_fisa slides.ppt

  12. Conclusion • On target to provide practical guidance illustrated with realistic examples. • Key audience: • Senior I&C engineers and managers of refurbishment projects • Development engineers and managers in the supply industry • SMEs and service companies in the refurbishment market • Regulators and policy makers • Impact on strategy: • Accelerate inter working in member states • between utilities, suppliers and regulators • Help to focus national R&D efforts wp6_beg010_v0_1_fisa slides.ppt

More Related