Recycled Water Distribution System Challenges

Recycled Water Distribution System Challenges. Lee Cesario, P. E. Denver Water lee.cesario@denverwater.org. Challenges. Recycled water systems are in some ways different than potable systems. Demand Patterns/Scheduling Design Construction Operations Regulations Changes for the Utility.

Download Presentation

Recycled Water Distribution System Challenges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recycled Water Distribution System Challenges Lee Cesario, P. E. Denver Water lee.cesario@denverwater.org

  2. Challenges • Recycled water systems are in some ways different than potable systems. • Demand Patterns/Scheduling • Design • Construction • Operations • Regulations • Changes for the Utility

  3. Distribution System Components • Treatment • Storage • Reservoirs/tanks, ponds • Pumping • From storage and from pipe • Piping • Transmission, distribution, service lines • Dechlorination • Valves • Control, pressure regulating, line (isolation), • Air valves, blow-offs

  4. System and Potential Customers

  5. Customers • Potential Customers • Proximity • Combinations of customers along route • Changing circumstances • Working with the Customer • Regulations • Applicator Plan to Comply • Notice of Authorization • Inspections • Annual Training • Contract?

  6. Customer Demands • CustomerDemand Pattern • Golf course continual (with pond) • School 2-3 nights/week • Park continual, at night 2-3 nights/week • Industrial continual or irregular • Scheduling • Balance the demand over time • Less of an issue early on, critical near buildout

  7. Bruce Randolph Middle School

  8. Swansea Park

  9. City Park GC Pond

  10. Shafer Park Meter Vault

  11. Design • Treatment • Storage • Reservoirs/tanks/ponds • Location/elevation and capacity • Pump Stations • Phasing of pumps • Back-up pump • PRV connections between higher-lower pump lifts • Types of pumps • Horizontal split case, vertical turbine, booster • Pipe • Often larger since demand is concentrated in shorter duration (6 hours at night) • Tree system rather than looped • Long distances • Reliability

  12. Vertical Turbine Pumps

  13. Xcel’s Northwest Reservoir

  14. Design • Dechlorination Facility • Meters, Control Valves, Chemical Feed • Treatment Operators • Distribution Operators • Security

  15. Dechlorination Facility

  16. Dechlorination Facility

  17. Dechlorination Facility

  18. Design • Recycled Water System Standards • Purple pipe, triangular covers, signs, regulations • Reliability • Outages • Potable back-up? • Combining Meter/Valve Vaults • One or two vaults • Cost, purpose, ownership. maintenance • Access by different work groups • Meter readers, operations, customer • Security

  19. Bruce Randolph Middle SchoolMeter and Valve Vault

  20. Hydraulic Design Standards • Hydraulic Design Standards • Pressure-max, min, max fluctuation • Headloss • Velocity • Standard pipe diameters • Headloss • Long distances may mean higher pressure fluctuations or over sized pipe • Pressure Standards • 5 psi less than potable? • Higher pressure with individual pressure regulating valves? • Not Always Practical to Follow Potable Standards

  21. Design • Goal is to maximize use of the designed system thus using reduced pipe sizes. • Must manage demand to avoid peaks. • Excess capacity…until buildout. • Cannot allow on-call usage like potable. Peak demands would be concentrated in shorter time frames and result in higher headloss, fluctuations and lower pressure.

  22. Construction • Winter to meet load season • Existing development • Challenges • New development • Opportunities • Through golf courses • Restoration • Directional drilling • Avoid above ground issues, maybe…

  23. Operations • Year around or seasonal? • Start-up, Shut-down • Pumps, pipes, control valves, dechlorination • Customers with varying demands • Contract obligations (Xcel) • Flushing • Discharge • Maintaining Water Quality • Long distances

  24. Operations • Emergency Interconnects • Physical separation, insertable spool • Pond operations • Private ponds • Balance demand, additional storage • Maintain certain water levels • Inspections of Customer Systems • Periodic, Annual • Private Systems • Lack of control • Lack of urgency/sensitivity/awareness

  25. Regulations • Standards • Applicator Plan to Comply • Notice of Authorization • Approved uses • Ponding, run-off, flushing • Greater need to help the customer

  26. Changes for the Utility • Specialized design, construction, service • Integrate into existing organization? • Add specialized function/position(s)? • Marketing? • Feasibility for customer/utility • Coordination/Contact

  27. Conclusion • Recycled systems present challenges different than potable systems • Customers/Demand Patterns/Scheduling • Design • Construction • Operations • Regulations • Changes for the utility