An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. San Carlos Apache Water Delivery Project David Neumann June 18, 2003

  2. Tribe’s Existing Black River pump station Outline • Company background • Project background • Problem definition • Proposed approach • Optimization • Operations model • Summary

  3. Wrong Stetson! Who are the Stetson Engineers? • We design, test, and manufacture fine hats

  4. Established in 1958 Offices in California and Arizona 60 employees Clients include: Indian tribes, water districts, state, federal, local governments Engineering services include: Surface water Agricultural Water rights Groundwater Environmental Municipal Stetson Engineers

  5. What is the San Carlos Apache Water Delivery project • Develop up to 77,000AF/year of CAP and other waters for agriculture and other uses • We have been tasked to: • Develop and evaluate alternative delivery plans

  6. Project Location

  7. Water Delivery Project Goals • Develop an irrigation project that has the lowest cost and highest benefit • Fully use water rights and funding provided by the government • Develop various parts of the reservation

  8. Work Timeline • Completed: • Reconnaissance analysis • Appraisal analysis • Determined three concept alternatives • Next Step: • Feasibility study • Detailed environmental impacts analysis (EIS/EIR)

  9. Project Alternatives • Three alternatives consist of: • Pumping stations • Distribution pipelines and canals • On and off stream reservoirs • Groundwater recharge and pumping • Pass-through reservoirs

  10. Project DescriptionAlternative 1

  11. Problem definition • We need tools to: • Further investigate project sizing and operating policy • Analyze the impacts of the projects on • Hydrology • Water quality

  12. Two models • Optimization – Prescriptive: Calculate best project sizes and operations to meet a flow criteria • Operations – Descriptive: Calculate storage and flows given project size and operations

  13. Optimization Model • Use an efficient algorithm to get the most cost-effective project sizes and number of acres to irrigate • Start with a loosely constrained model • Add constraints to see their effect

  14. Optimization layout

  15. Problems with the optimization Model • Time step • Perfect foresight • Simplified operating rules • Linearization errors

  16. RiverWare Operations Model • Operations model will take the project sizes from the optimization model • Verify that sizing criteria has been met • Determine impacts

  17. RiverWare Model development • Model and rules are under development • Difficult to write rules when project operations are unclear • First, develop operating goals • Resulting rules are not very complicated except: • Exchange mechanism • Pumping priority and water rights • Multiple diversions from same object

  18. RiverWare workspace

  19. Operations Model • Analyze impacts on: • Flow timing and magnitude • Reservoir storage • Minimum flows • Water quality

  20. Water Quality • Total dissolved solids • Temperature • Dissolved oxygen • RiverWare?

  21. Proposed approach • Determine project operations • Optimize project sizes and irrigated acreage • Run operations model • Verify project sizes and operations • Repeat steps 1 – 4 until project sizes and operations are finalized • Investigate hydrologic impacts • Investigate water quality impacts

  22. Additional technical issues • Ungaged flow development • 50 years of daily data • Organizing model inputs, runs, and results • 4 Alternatives including No Action • 4 RiverWare models • 4 RiverWare rulesets • 3 Optimization models

  23. Summary • Develop a water delivery system for the San Carlos Apache Tribe • Will use the following modeling tools: • An optimization model to size projects and determine number of acres to irrigate • A RiverWare operations model to verify optimization and analyze impacts for an EIS/EIR

  24. Questions? Coolidge Dam and San Carlos Reservoir