Join Cooperative Sun's project managed by Doug Carter with a total cost of $625,000, funded by DOE with $500,000. The project involves tax equity, net metering, coop members' loans from RUS, FFB, CFC, etc., and different ownership models like SPE, lease, or inverted lease. Duration: 6-9 months.
E N D
Control Number: 0923-1636 Cooperative Sun Doug Carter, Project Manager Total Project Cost $625,00 DOE Funding $500,000 Cost Share $125,000 Duration Months: 6-9 months Tax Equity Cooperative Sun Coop Net Metered Coop Members Loan: RUS, FFB, CFC, etc. Project SPE (Flip, Lease or Inverted Lease) Ownership Rights