Outline • Problem Statement • System Constraints and Criteria • Schematic of System • Physical System • Virtual System • Interfacing • Planned Approach • Preliminary Design and Analysis • Summary
Problem Statement • The 2006-2007 Sim-Pooch Team plans to create a canine head prototype which will be used as a medical tool to educate veterinarians and students in canine acupuncture. Problem Statement System C&C Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
System Constraints and Criteria • User must be able to feel the anatomical features of a canine head • User’s movements must be able to be recorded • User must be able to be tested • Location of each cranial acupuncture point must be identified in the model accurately Problem Statement System C&C Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Simple Diagram Physical System Virtual System ? User Problem Statement System C&C Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
System Schematic Physical Model User MRI & CT Data AMIRA Solid Model Audio/Visual Feedback Computer Processor Haptics Device Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Criteria & Constraints • The proper location of each cranial acupuncture point must be identified and implemented in the model. • The simulator must accurately represent the contours of the canine. • Each anatomical layer must simulate the tactile response from a human perspective. • The simulator must represent the contours of the canine. Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Linking the Physical & Virtual SystemsCT vs. MRI • CT Scan (left): • Shows bone clearly • DIACOM format • Mr. Womack very familiar with data • MRI Scan (Right): • Shows muscle/tissue very clearly • DIACOM format • Hard to see bone Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Converting MRI/CT Data • AMIRA- advanced visualization, data analysis, & geometry reconstruction • Converts DIACOM data to raw data • Capable of STL data (used for prototyping) Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Potential Problems • Flesh does not show up on scan • Data format very complex • Some areas of bone/tissue too thin for accurate data results Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Physical System – Advanced Materials [ref,1Ad] • We want the prototype structure that is robust & will hold up to constant handling for acupuncturist training • A MRI and CT scan will be sent to a rapid • prototyping company to create a laser sintered dog skull model using nylon 12 resin • Strength and Rigidity a necessity • Hydrated cortical bone Young’s modulus • ranges from 6.9±4.3 GPa to 25±4.3 GPa • [ref,1Ad] • Nylon 12 modulus 1693 MPa ~to SLA’s • but have higher notched impact test and • heat deflection temperature numbers [ref,2Ad] [ref, 8Ad] Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Physical System – Advanced Materials • Laser Sintered (LS) parts are considerably more durable than the Stereolithography (SLA) created parts • SLA’s resins tend to absorb moister over time which will cause them to expand and become more brittle over time [ref,2Ad] • SLA’s are however more detailed than LS’s but in • our case the level of detail will not be needed • Reasons for choosing Nylon 12 SLA showing its detail [ref,4Ad] [ref, 2Ad] Tested at over 100 mph Nylon 12 sintered VW grill is quick to make Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Physical System – Advanced Materials • This company only works in stereolithography and was near $1000 to • make and ship from Round Lake, Illinois • This company was also expensive and was above $1795 to make and ship from • Maple Plain, MN • This was by far the best Company with BBB recognition, the locality and their previous donations to CU Boulder shows us their interest on helping local colleges. • And currently we are working on getting a donation from them Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Physical Model – Advanced Materials • Biomaterials • Options are: latex, stiff foam, or ballistic gelatin • Need of realistic feel for trainee to palpate the dog head Look & feel of human tissue [ref,6Ad] • High Flow is formulated for added stability and a lower viscosity High flow foam [ref,7Ad] Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Physical System - Manufacturing • Connecting the physical systems • 3 Physical Systems: • Haptic • Canine Manikin • Computer • Goals of Physical Stand: • Integrate all components into one unit • Integrate all components into one unit • Make system easy to use • Ability to move entire system easily • Lightweight • Durable Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Physical System - Manufacturing • Possible pitfalls • Problems • Haptic System has limited reach • Linkage to stylus may cause difficulty reaching certain points • System may be too bulky • Solutions • Allow manikin to rotate into set positions • Several orientations integrated into software • Make manikin head and Haptic system removable Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Real Time Systems • Desirable characteristics of a haptics interface device • Proper ergonomics • Proper force feedback • Multiple program modes • Suitable range of motion Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Real Time Systems System Downfalls ForceDimension 3DOF Omega SensAble Omni Immersion Cybergrasp Relatively Small Range of Motion Expensive and cumbersome Poor Ease of use and Expensive Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Real Time Systems Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Real Time Systems • Possible problems • Limited range of motion • Multiple programs or modes • Extensive programming • Dampened punctual response Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Physical System Interfacing MRI data AMIRA Virtual Dog Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Physical System Interfacing • AMIRA • Supports over 20 standard file formats • Raw data interface – Developer Pack • Open Inventor – standard file format for 3D models Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Physical System Interfacing • Open Inventor • Built on top of OpenGL • C++ object oriented 3D graphics API • API between AMIRA data and C++ program Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Virtual System – Physical System Interfacing • Possible Problems • AMIRA added nodes to Open Inventor • Some geometries cannot be saved in Open Inventor file format. Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Budget • Sim-Pooch is sponsored by Dr. Narda Robinson and Dr. Regina Schoenfeld • Wants a working device to teach students with • Available funds may change Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Budget • We have the $2,000 Omni System • May be inadequate • Budget Based on Purchasing $20,000 Haptic System Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Summary • In conclusion, it is the goal of this project to design an operating, yet preliminary system, to educate students on the techniques of acupuncture. The system will have separate modes to both instruct and test the students. It will also be design such that it can be expanded to other medical fields or disciplines Problem Statement Schematic of System Physical System Virtual System Interfacing Planned Approach Preliminary Design and Analysis Summary
Reference • Advanced Materials • 1Ad.) Elastic Modulus and Hardness of BoneJ Biomech.1999 Oct 18; 32-10,1005-1012 • 2Ad.) www.protogenic.com • 3Ad.) www.protomold.com • 4Ad.) www.3dproto.com • 5Ad.) www.firearmstatistical.com • 6Ad.) http://en.wikipedia.org/wiki/Ballistic_gelatin • 7Ad.) http://www.monstermakers.com/foam.html • 8Ad.) http://www.turbosquid.com/FullPreview/Index.cfm/ID/238272 • Real Time Systems • Salisbury, K., Conti,F., Barbagli, F. (2004). Haptic Rendering. IEEE journal, March April
References • Biomedical • Images courtesy of: http://www.accg.com/s-neuro/procedures4.html • Images courtesy of Mr. Womack (from CT scan in AMIRA)
Questions? Physical Model User MRI & CT Data AMIRA Solid Model Computer Processor Haptics Device Audio/Visual Feedback
MRI • Magnetic Resonance Imaging • Lay in the isocenter of magnetic field • Goes through subject, creating a map of tissue types—puts images together to create 2-D or 3-D model • DIACOM format
CT Scan • Computerized Tomography • Several x-rays sent through body simultaneously at different angles • Strength of x-ray measured—detects relative density of the tissues—create map • DIACOM format