An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 現代專案管理教材 第二十七章 專案費用控制 博碩文化出版發行

  2. 27.1 專案費用控制概述 • 27.1.1 專案費用控制的定義 • 27.1.2 專案成本控制的內容 • 27.1.3 專案成本控制的依據

  3. 27.2 專案成本控制原理 • 27.2.1 專案成本控制原理 • 1. 專案成本控制基於專案成本管理中心活動 • 2. 專案成本控制能確保專案的實際成本和成本計畫保持一致 • 27.2.2 專案成本控制原理圖

  4. 27.3 專案成本控制流程

  5. 27.4 專案成本控制方法與技術 • 27.4.1 成本變更控制系統 • 27.4.2 績效度量— 實獲值和偏差分析 • 27.4.2.1 偏差和實獲值 • 1. 偏差 • 2. 實獲值 • 27.4.2.2 偏差分析 • 27.4.2.3 偏差定量分析技術 • 27.4.3 補充計畫編制 • 27.4.4 價值工程

  6. 27.5 專案成本控制的輸出 • 27.5.1 修訂的成本估算 • 27.5.2 預算更新 • 27.5.3 糾正措施 • 27.5.4 完工估算 • 27.5.5 教訓

  7. 27.6 專案成本控制狀態報告的編寫 • 偏差分析報告程式要盡可能的簡短,其中的原因很簡單:報告越短、越精確,就越能迅速產生反饋並使反應快捷。如果重新規劃必須用有限的資源完成,則時間參數就變的非常關鍵。 • 重新規劃資源的兩個條件是: • a. 固定的結束日期 • b. 可利用資源是不變的或者有限的。