1 / 24

Сессия Ученого Совета ОФВЭ 2 7 декабря 200 6

Сессия Ученого Совета ОФВЭ 2 7 декабря 200 6. Проект CMS в 200 6 Ю.М.Иванов В.В.Сулимов. ПИЯФ в CMS. В проект вовлечены Лаборатория физики элементарных частиц ОФВЭ Лаборатория мезоатомов ОФВЭ Группа экзотических ядер ОФВЭ Отдел мюонных камер ОФВЭ Отдел радиоэлектроники ОФВЭ

landon
Download Presentation

Сессия Ученого Совета ОФВЭ 2 7 декабря 200 6

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Сессия Ученого Совета ОФВЭ27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов

  2. ПИЯФ в CMS В проект вовлечены • Лаборатория физики элементарных частиц ОФВЭ • Лаборатория мезоатомов ОФВЭ • Группа экзотических ядер ОФВЭ • Отдел мюонных камер ОФВЭ • Отдел радиоэлектроники ОФВЭ • Отдел вычислительных систем ОФВЭ

  3. CMS

  4. End-Cap Muon System • 468 CSCs, not counting ME4/2 • 144 Large CSCs (3.4x1.5 m2): • 72 ME2/2 chambers • 72 ME3/2 chambers • Small CSCs (1.8x1.1 m2): • 72 ME1/2 chambers • 72 ME1/3 chambers • 72 ME1/1 chambers • 20o CSCs (1.9x1.5 m2): • 36 ME2/1 chambers • 36 ME3/1 chambers • 36 ME4/1 chambers • Frontend Electronics: • 170K Cathode channels • 140K Anode channels • Trigger&DAQ • (on-chamber part) • Alignment&Services

  5. CMS

  6. PC commissioning on + Side MTCC

  7. Statistics of electronics boards on installed chambers Board type/on_US_CSCs/total/replaced CFEB/1764/2124/22 LVDB/360/432/6 LVMB/360/432/7 CSC/360/432/4 AFEB/10152/11448/2 ALCT /360/432/5

  8. Summary of replacements • 5 boards had mechanical damages: • LVDB – broken input connector • LVMB – broken switch • ALCT – broken input connector • CFEB – broken latch, input connectors • 20 CFEBs were replaced: • 14 CFEBs – dead channels, low response to the test pulse, no comparators, no data, … • 6 CFEBs - by mistakes • 5 LVMB – read wrong currents • 5 ALCT: • four boards had 1.8 V fuse burnt out • one board couldn’t been readout • 9 cables: • one DMB-LVDB was damaged • eight skew clear cables • 4 CSCs: • two chambers couldn’t hold HV > 2.7 kV • two chambers had unacceptable level of noise

  9. HV long term test stand at ISR

  10. CSC: MTCC  START-UP

  11. ME+4 ME+3 ME+2 ME+1 CSC Scope at MTCC

  12. Online Event Display CSC/DT–GMT–GT trigger integration, with Global DAQ readout CSC–CSC/TF–GMT–GT triggered event Run 4593#52618 Ilaria Segoni, Dan Holmes, et al. CSC+DT triggered event (using GMT+GT)

  13. More Event Displays … • 3 CSCs: strip digis (yellow), wire digis (magenta), Segments point correctly but are a bit small to actually see • Barrel DT segment (red) and digis (green) • Barrel RPC digis (cyan)

  14. MTCC  START-UP: Event Display

  15. Missing dowel pins on YE+3 (back, blue arrows) and YE+2 (front, yellow arrows)

  16. Missing dowel pins on YE+3 Damaged CFEB cover on ME+3/2/27 due to falling pin

  17. Missing dowel pins on YE+2 Damaged CSC ME+2/1/13 (top) and ME+2/2/27 (bottom) due to falling pin

  18. MTCC  START-UP: Mechanical installation and cabling Need UXC55 schedule!

  19. YE+3 prep

  20. YE+3 lowering 30th November Tower to shaft distance ~7cm Overall lowering time ~10h

  21. YE+3 landing in UXC55

  22. YE+2 lowering12th December

  23. YE+2 landing in UXC55

More Related