SNuMI: getting ready for the Director’s review. July 10, 2006. Final report from AAC review P5 Report to HEPAP July 6, 2006 Request from Steve Holmes for SNuMI Director’s Review CD-1 style Conceptual design report. From AAC Review in May. P5 Report to HEPAP, July 6, 2006.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

SNuMI: getting ready for the Director’s review


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
snumi getting ready for the director s review
SNuMI: getting ready for the Director’s review

July 10, 2006

  • Final report from AAC review
  • P5 Report to HEPAP July 6, 2006
  • Request from Steve Holmes for SNuMI Director’s Review CD-1 style
  • Conceptual design report
director s review
Director’s review

Ed,

I would like to ask you to organize a Director's Review of the SuperNuMI

project. The current thinking is that given the scope of this effort

(several x $10M, including a major MIRF upgrade) it will be best handled by

executing as a Major Item of Equipment (MIE) Project. The scope of the

review should encompass the complete set of upgrades required to move the

intensity on target to 1 MW or greater. This should include both the

accelerator and target station modifications required, and all project

documentation required to establish a CD-1 style baseline range.

In order to initiate funding in FY2009 we need to be conducting this

review in the October-November timeframe. My assumption is that AD can be

ready for such a review by October, so Roger or Alberto should let us know

asap if this is not the case.

At this time I would like to try to identify tentative dates for the

review. Could you please let us know what dates are consistent with your

calendar in October and November. Once we have established dates we will

start assembling a committee, writing the charge, agenda, etc.

Thanks,

Steve

cd 1 review
CD-1 review
  • CD-1 review (DoE order 413.3)
    • Critical decision prerequisites
      • Conceptual Design Report
      • Project Data Sheet for design
      • Acquisition plan
      • Preliminary Project Execution Plan and baseline range
      • Verification of mission need
      • Preliminary Hazard Analysis Report
super beam upgrades to the numi facility conceptual design report
Super-beam upgrades to the NuMI facility – Conceptual Design Report
  • Executive Summary (A. Marchionni)
  • 1. Introduction
    • Present operating conditions (A. Marchionni)
    • Planned proton Plan upgrades (E. Prebys)
    • SNuMI upgrade plan (A. Marchionni)
    • Beam Physics issues (B. Zwaska)
  • 2. Elements of the Plan
    • WBS 1.1 Recycler upgrades (P. Derwent)
    • WBS 1.2 NuMI upgrades (M. Martens)
    • WBS 1.3 Booster upgrades (E. Prebys)
    • WBS 1.4 Main Injector upgrades (I. Kourbanis)
    • WBS 1.5 Accumulator upgrades (???)
  • 3. Cost and schedule (J. Sims, K. Domann)
  • 4. Proton projections (A. Marchionni)