slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN PowerPoint Presentation
Download Presentation
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN

Loading in 2 Seconds...

play fullscreen
1 / 22

OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN - PowerPoint PPT Presentation


  • 65 Views
  • Uploaded on

OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN. Installed Capacity (as on 30.09.2010). Total Capacity as on 30.09.2010= 1,64,835 MW. Installed Capacity (MW) as on 30-09-2010 (Type-wise). Total Installed Capacity = 1,64, 835 MW.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

OVERVIEW OF

INDIAN

POWER SECTOR AND

PLAN FOR

12th / 13th PLAN

installed capacity as on 30 09 2010
Installed Capacity (as on 30.09.2010)

Total Capacity as on 30.09.2010= 1,64,835 MW

slide3

Installed Capacity (MW) as on 30-09-2010

(Type-wise)

Total Installed Capacity = 1,64, 835 MW

capacity addition during 11 th plan
Capacity addition during 11th Plan
  • Capacity addition target during 11th Plan: 78,700 MW
  • Capacity addition likely during 11th Plan as per MTA: 62,374 MW
  • Capacity commissioned during 11th Plan till 31.10.2010: 29,322 MW
  • Capacity under execution for likely benefits during 11th Plan: 33,436 MW
  • Capacity being attempted under Best Efforts: 12,590 MW
slide11

CAPACITY ADDITION

REQUIREMENT

DURING 12th PLAN

(2012-17)

slide13

Generation Capacity Addition 12th Plan: Basis

  • Demand - 17th EPS forecasts
  • Seasonal studies carried out to ensure optimum capacity addition would separately meet demand in each season also.
  • 11th Plan Capacity addition considered – 62,374 MW
  • Capacity retired - about 4,000 MW
  • Norms adopted – LOLP-0.2% and ENS- 0.05%
  • Spinning Reserve – about 11,000 MW (capacity corresponding to 5% Spinning Reserve)
  • Import – 1200 MW hydro from neighboring countries
slide14

Generation Capacity Addition 12th Plan: Basis

  • Shelf of projects drawn up based on the status of projects (approx 1,30,000 MW).
  • Hydro and Nuclear projects accorded priority.
  • Generation Expansion Planning Models used to work out the capacity addition requirement to meet the projected demand.
slide18

CAPACITY ADDITION

REQUIREMENT

DURING 13thPLAN

(2017-22)

slide20

Low Carbon Growth Strategy

  • Capacity Addition from Conventional fuel based plants complemented by Renewable Energy based plants to the maximum extent possible.
  • Highest priority to setting up of Hydro and Nuclear power plants.
  • Gas based plants to be accorded higher priority as compared to coal /lignite plants, to the extent feasible.
  • Efficiency improvement of existing stations, R&M of Old thermal power projects, and retirement of less efficient plants/old and small size generating units.
slide21

Low Carbon Growth Strategy

  • Energy Conservation in generation and at consumer end.
  • Other measures to reduce pollution i.e. Reduction in T&D losses, Coal quality improvement.
  • Introduction of Clean Coal Technologies (Supercritical Technology, Ultra supercritical technology, IGCC etc).
  • Formation of Strong National Grid