1 / 9

Subir Das sdas at appcomsci dot com

Joint Opening Plenary IEEE 802.21 Media Independent Handover Services Session #53, November 2012 San Antonio, Tx. Subir Das sdas at appcomsci dot com. Subir Das, Chair 802.21 WG. WG Officers. The WG has 22 voting members as of this meeting. Subir Das, Chair 802.21 WG.

kylee
Download Presentation

Subir Das sdas at appcomsci dot com

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint Opening PlenaryIEEE 802.21 Media Independent Handover ServicesSession #53, November 2012San Antonio, Tx Subir Das sdas at appcomsci dot com Subir Das, Chair 802.21 WG

  2. WG Officers • The WG has 22 voting members as of this meeting Subir Das, Chair 802.21 WG

  3. IEEE 802.21Meeting Server Details http://mentor.ieee.org/802.21/documents Slide 3 Subir Das, Chair 802.21 WG

  4. Session Time and Location Default Location: Travis C; Tutorial: Lonestar EF ; 802.16 HetNet: Bonham C; Subir Das, Chair 802.21 WG

  5. 802.21 WG Objective • IEEE 802.21 is developing standards to enable handover services and interoperability between heterogeneous networks including both 802 and non-802 networks Subir Das, Chair 802.21 WG

  6. Work Status • Task Group Status • 802.21c Single Radio Handovers • Completed WG letter Ballot on Nov 09, 2012 • 802.21d Multicast Group Management • Call For Proposal issued and proposal received Subir Das, Chair 802.21 WG

  7. Objectives for the November Meeting • Task Group Activities • 802.21c: Single Radio Handovers • Resolve Letter Ballot comments • 802.21d • Proposal discussion • PAR comment discussion Subir Das, Chair 802.21 WG

  8. Future Sessions – 2013 • Interim: 13-18 January, 2013, Hyatt Regency, Vancouver, BC, Canada • Plenary: 17-21 March, 2013, Caribe Royale, Orlando, FL, USA • Co-located with all 802 groups • Interim: 12-17 May 2013, Hilton Waikoloa Village, 2013 • Co-located with all 802 wireless groups • Plenary: 14-19, July 2013, Geneva, Switzerland • Co-located with all 802 groups • Interim: 15-20, September 2013, Nanjing , China • Co-located with all 802 wireless groups • Plenary: 10-15 Nov 2013, Hyatt Regency Reunion, Dallas, TX, USA • Co-located with all 802 groups Subir Das, Chair 802.21 WG

  9. Future Sessions – 2014 • Interim: 19-24 January, 2014, Century Plaza, Los Angeles, CA, USA • Co-located with all 802 groups • Plenary: 16-21 March, 2014, TBD (Non-American Venue) • Co-located with all 802 groups • Interim: 11-16 May 2014, Hilton Waikoloa Village, HI • Co-located with all wireless groups • Plenary: 13-18, July 2014, Manchester Grand Hyatt, San Diego, CA, USA • Co-located with all 802 groups • Interim: 14-19, September 2014, TBD (Europe or Asia venue) • Co-located with all 802 wireless groups • Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA • Co-located with all 802 groups Subir Das, Chair 802.21 WG November 2012

More Related