An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005

  2. MUNICIPAL STORMWATER PERMITS • What are they? • History • Permitting Requirements • Phase II Grant Program

  3. MUNICIPAL STORMWATER PERMITS Four Permits • Western Washington Phase I • Western Washington Phase II • Eastern Washington Phase II • Statewide combined permit for WSDOT

  4. Phase I Municipal Stormwater Seven Phase I jurisdictions – • King, Pierce, Snohomish, and Clark Counties, • The Cities of Seattle and Tacoma, and • WSDOT facilities within those jurisdictions

  5. Phase II Cities and Counties Automatically in: • 92 Cities • 13 Counties Must be evaluated and designated: • 10 Cities See handout for complete list

  6. Ports Universities (public only) School districts Drainage districts Irrigation districts Secondary Permittees - Phase I and Phase II

  7. What is being Permitted? – Municipal Separate Storm Sewer Systems (MS4s) located within census defined urbanized areas*andwhich discharge to surface waters * Phase II only

  8. What is an MS4? Municipal Separate Storm Sewer System or MS4: A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains) which is: • Owned by a State, City, County, or other public entity; and • Designed or used for collecting or conveying stormwater.

  9. Census Defined Urbanized Area A central place (or places) and the adjacent densely settled surrounding territory that together have a minimum residential population of 50,000 people and a minimum average density of 1,000 people per square mile.

  10. Area Covered - • For regulated cities - entire incorporated city • For regulated counties - • Phase I – All unincorporated areas of the county • Phase II – census defined urban areas and associated urban growth areas

  11. What is NOT covered – • Direct discharges to surface or ground water from non-municipal separate storm sewers • Sediment and erosion control from sites less than 1 acre (phase II only) • Post construction stormwater from new development and re-development from sites less than 1 acre (phase II only)

  12. MUNICIPAL STORMWATER PERMITS • What are they? • History • Permitting Requirements • Phase II Grant Program

  13. History/Context • Puget Sound Water Quality Management Plan • Phase I Municipal Stormwater Permits • EPA Phase II Rules • Tri-County ESA response • 2004 Report to the Legislature

  14. MUNICIPAL STORMWATER PERMITS • What are they? • History • Permitting Requirements • Phase II Grant Program

  15. Permit Requirements Required to develop, implement, and enforce a storm water management program to: • Reduce the discharge of pollutants to the maximum extent practicable (MEP), • Protect water quality, and • Satisfy the appropriate water quality requirements of the Clean Water Act.

  16. Permit Requirements Illicit discharge detection and elimination

  17. Permit Requirements Develop and enforce a program to reduce pollutants in stormwater runoff from construction sites

  18. Permit Requirements Post construction stormwater management in new development and redevelopment

  19. Permit Requirements Proper operation and maintenance of stormwater facilities

  20. Permit Requirements Phase I only: • Source control • Stormwater retrofit program

  21. Current Permit Process and Schedule Schedule – Western Washington • Preliminary comment drafts: May 16 – Aug 2005 • Formal comment drafts: Oct – Dec, 2005 • Permits issued: March 2006 Schedule – Eastern Washington • Preliminary comment draft: July 15 – Oct 15 2005 • Formal comment draft: Jan – Mar 2006 • Permit issued: June 2006

  22. Western Washington - Scheduled Workshops Tacoma- June 23rd, 9 a.m. to 4 p.m., King Oskars Hotel and Conference Center, 8820 South Hosmer Everett- July 12th, 9 a.m. to 4 p.m., Everett Events Center, Ballroom 3 South, 2000 Hewitt Avenue, Suite 200 Bothell- July 14th, 9 a.m. to 4 p.m., Country Village Courtyard Hall, 720 238th St. SE, Suite H Vancouver- July 18th, 9 a.m. to 4 p.m., Water Resources Education Center, 4600 SE Columbia Way

  23. MUNICIPAL STORMWATER PERMITS • What are they? • History • Permitting Requirements • Phase II Grant Program

  24. Phase II Grant Program $2.7 Million provided for grants to local governments for phase II storm water permit requirements. $300 K provided to Mason county to develop stormwater management plans for Belfair and Hoodsport.

  25. Phase II Grant Program Ranked based on need • Median household income • Sales tax revenue • Property tax revenue • Population • Unemployment

  26. MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005