1sr navigation systems what s new in 2010 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
1SR Navigation Systems What’s New in 2010? PowerPoint Presentation
Download Presentation
1SR Navigation Systems What’s New in 2010?

Loading in 2 Seconds...

play fullscreen
1 / 10

1SR Navigation Systems What’s New in 2010? - PowerPoint PPT Presentation


  • 87 Views
  • Updated on

1SR Navigation Systems What’s New in 2010?. Navigation Systems – What’s New in 2010. New partnership with ANTs & Sectors PATON program partnership between 1SR & 1NR Joint 1SR & 1NR PATON Inspection & AV Qualification policy.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

1SR Navigation Systems What’s New in 2010?


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
    Presentation Transcript
    1. 1SR Navigation SystemsWhat’s New in 2010?

    2. Navigation Systems – What’s New in 2010 • New partnership with ANTs & Sectors • PATON program partnership between 1SR & 1NR • Joint 1SR & 1NR PATON Inspection & AV Qualification policy. • D1 DCO RADM Nimmich wants all PATONS in District 1 verified this year – 100% coverage. 2

    3. Navigation Systems – What’s New in 2010 • On-line PATON Database System • New AV Qualification Program • AV Currency Maintenance • New 1SR Navigation Systems Web Site • www.USCGAux1SR-ATON.org

    4. AV Qualification Program • One day-long district led AV training course • Pre-course mandatory reading • Pre-course open-book test • Post course open book test • 3 Supervised PATON Verifications

    5. AV Qualification Program District AV training courses: 6 March Station Jones Beach 10 April Metuchen 17 April Poughkeepsie area 17 April North Jersey 24-25 Apr Station Burlington TBD Station New Haven

    6. AV Currency Maintenance • Two N.S. discrepancy/verification reports must be filed each year. Acceptable reports are: • ATON discrepancy report • PATON discrepancy or verification report • Bridge survey or discrepancy report

    7. AV Currency Maintenance • Failure to file 2 reports/year = REYR status • Five continuous years in REYR = loss of AV qualification

    8. PATON Database System • All PATON data in one on-line location • Owners file PATON applications on-line. • CGAux verification & discrepancy reports filed on-line. • Sector, ANT & DPW in Boston see the same current information. • CGAux gets PATON verification notice via system.

    9. PATON Database System • Only DSO approved & trained AVs get system logins • All other AVs send reports via their division’s database entry person • Non-AVs send reports via normal 1SR 7054 discrepancy form. • Add database ID requests to be sent via NS chain, not by clicking link on the database site.

    10. The End