1sr navigation systems what s new in 2010 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
1SR Navigation Systems What’s New in 2010? PowerPoint Presentation
Download Presentation
1SR Navigation Systems What’s New in 2010?

Loading in 2 Seconds...

play fullscreen
1 / 10

1SR Navigation Systems What’s New in 2010? - PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on

1SR Navigation Systems What’s New in 2010?. Navigation Systems – What’s New in 2010. New partnership with ANTs & Sectors PATON program partnership between 1SR & 1NR Joint 1SR & 1NR PATON Inspection & AV Qualification policy.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

1SR Navigation Systems What’s New in 2010?


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

Navigation Systems – What’s New in 2010

  • New partnership with ANTs & Sectors
  • PATON program partnership between 1SR & 1NR
  • Joint 1SR & 1NR PATON Inspection & AV Qualification policy.
  • D1 DCO RADM Nimmich wants all PATONS in District 1 verified this year – 100% coverage.

2

slide3

Navigation Systems – What’s New in 2010

  • On-line PATON Database System
  • New AV Qualification Program
  • AV Currency Maintenance
  • New 1SR Navigation Systems Web Site
        • www.USCGAux1SR-ATON.org
av qualification program
AV Qualification Program
  • One day-long district led AV training course
    • Pre-course mandatory reading
    • Pre-course open-book test
    • Post course open book test
    • 3 Supervised PATON Verifications
av qualification program1
AV Qualification Program

District AV training courses:

6 March Station Jones Beach

10 April Metuchen

17 April Poughkeepsie area

17 April North Jersey

24-25 Apr Station Burlington

TBD Station New Haven

av currency maintenance
AV Currency Maintenance
  • Two N.S. discrepancy/verification reports must be filed each year. Acceptable reports are:
    • ATON discrepancy report
    • PATON discrepancy or verification report
    • Bridge survey or discrepancy report
av currency maintenance1
AV Currency Maintenance
  • Failure to file 2 reports/year = REYR status
  • Five continuous years in REYR = loss of AV qualification
slide8

PATON Database System

  • All PATON data in one on-line location
  • Owners file PATON applications on-line.
  • CGAux verification & discrepancy reports filed on-line.
  • Sector, ANT & DPW in Boston see the same current information.
  • CGAux gets PATON verification notice via system.
slide9

PATON Database System

  • Only DSO approved & trained AVs get system logins
  • All other AVs send reports via their division’s database entry person
  • Non-AVs send reports via normal 1SR 7054 discrepancy form.
  • Add database ID requests to be sent via NS chain, not by clicking link on the database site.