1sr navigation systems what s new in 2010 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
1SR Navigation Systems What’s New in 2010? PowerPoint Presentation
Download Presentation
1SR Navigation Systems What’s New in 2010?

Loading in 2 Seconds...

play fullscreen
1 / 10

1SR Navigation Systems What’s New in 2010? - PowerPoint PPT Presentation


  • 80 Views
  • Uploaded on

1SR Navigation Systems What’s New in 2010?. Navigation Systems – What’s New in 2010. New partnership with ANTs & Sectors PATON program partnership between 1SR & 1NR Joint 1SR & 1NR PATON Inspection & AV Qualification policy.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '1SR Navigation Systems What’s New in 2010?' - kory


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

Navigation Systems – What’s New in 2010

  • New partnership with ANTs & Sectors
  • PATON program partnership between 1SR & 1NR
  • Joint 1SR & 1NR PATON Inspection & AV Qualification policy.
  • D1 DCO RADM Nimmich wants all PATONS in District 1 verified this year – 100% coverage.

2

slide3

Navigation Systems – What’s New in 2010

  • On-line PATON Database System
  • New AV Qualification Program
  • AV Currency Maintenance
  • New 1SR Navigation Systems Web Site
        • www.USCGAux1SR-ATON.org
av qualification program
AV Qualification Program
  • One day-long district led AV training course
    • Pre-course mandatory reading
    • Pre-course open-book test
    • Post course open book test
    • 3 Supervised PATON Verifications
av qualification program1
AV Qualification Program

District AV training courses:

6 March Station Jones Beach

10 April Metuchen

17 April Poughkeepsie area

17 April North Jersey

24-25 Apr Station Burlington

TBD Station New Haven

av currency maintenance
AV Currency Maintenance
  • Two N.S. discrepancy/verification reports must be filed each year. Acceptable reports are:
    • ATON discrepancy report
    • PATON discrepancy or verification report
    • Bridge survey or discrepancy report
av currency maintenance1
AV Currency Maintenance
  • Failure to file 2 reports/year = REYR status
  • Five continuous years in REYR = loss of AV qualification
slide8

PATON Database System

  • All PATON data in one on-line location
  • Owners file PATON applications on-line.
  • CGAux verification & discrepancy reports filed on-line.
  • Sector, ANT & DPW in Boston see the same current information.
  • CGAux gets PATON verification notice via system.
slide9

PATON Database System

  • Only DSO approved & trained AVs get system logins
  • All other AVs send reports via their division’s database entry person
  • Non-AVs send reports via normal 1SR 7054 discrepancy form.
  • Add database ID requests to be sent via NS chain, not by clicking link on the database site.