Sanjeev Aggarwal Amplus Infrastructure Developers Private Limited - PowerPoint PPT Presentation


  • 219 Views
  • Uploaded on

Way Forward to Meet Demand of Coal. Clearances and Land Acquisition for Coal Blocks . Sanjeev Aggarwal Amplus Infrastructure Developers Private Limited. India’s peak power demand in 2017 is expected to be ~199GW. Projected Power demand and Installed capacity requirement.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Sanjeev Aggarwal Amplus Infrastructure Developers Private Limited' - kordell


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Way Forward to Meet Demand of Coal

Clearances and Land Acquisition for Coal Blocks

Sanjeev Aggarwal

Amplus Infrastructure Developers Private Limited

india s peak power demand in 2017 is expected to be 199gw
India’s peak power demand in 2017 is expected to be ~199GW

Projected Power demand and Installed capacity requirement

…and Installed Capacity requirement to ~266 GW by 2017

Source: CEA, 17th EPS, IEP, Planning Commission, KPMG Analysis

slide3
Of this, ~83 GW is expected to come from Thermal power plants and Coal is likely to be the dominant fuel source

Capacity addition by fuel type

Capacity of Coal based power plants

  • Maximum addition is likely to be in Thermal power plants (~83 GW)
  • Coal is the dominant source of Fuel (~70 GW)
  • 70 GW capacity of Coal based power plants to be added by 2017

Coal power plants by source of Coal

  • Most of the planned coal plants use domestic source (Linkage or Captive); 22% of the capacity addition is based on Imported coal

Source: CEA, Infraline, MoP, KPMG Analysis

the significant linkage between power and coal
The significant linkage between power and coal
  • Coal to remain as the mainstay of Indian power capacity addition
  • Given the price difference between Indian and imported coal, huge demand for Indian coal
  • Coal India falling majorly short of meeting the demand and pressure mounting on the coal companies to increase supply (by reducing e-auction, pit-head stocks, etc.)
  • Why is that coal companies are unable to meet the demands of its customers?
the significant linkage between power and coal1
The significant linkage between power and coal
  • Development of the coal blocks has become a challenge both for the economy as well as for the industry.
  • Though available in plenty below the ground, is not available to meet the requirements of the growing economy leading to tremendous loss.
  • The issues that have really pushed back the efforts are land acquisition and various clearances. And the issue is common for Coal India and the captive mining companies.
land acquisition
Land Acquisition
  • Even after award of the mining license, the land acquisition process remains a big challenge
    • Revenue land (non-forest)
    • Private land
    • Forest land
  • Issues range from private land prices, rehabilitation, rights of forest dwellers and so on…
  • The government need to enforce its Eminent Domain right at least for the land that holds natural resource and complete the acquisition process in a timely manner
environment and forest clearance
Environment and Forest Clearance
  • Recent issue of forest clearances: Category A / B is the biggest bugbear for most of the coal mine owners:
    • Huge investments incurred / planned based on government allocation of coal mine.
    • Discussion at the top levels in the GoI over last 2 ½ Years; still uncertain on what can be cleared
    • Now, we believe that GoM has finally decided to do away with the Go/ No-Go policy
    • Any change of policy retrospectively or uncertainty in the same is the single largest measure that impacts investments in a growth economy.
  • Latest policy of MoEF to not grant environmental clearance till the forest clearance is obtained will further add on to the timelines
how can we do it better
How can we do it better?
  • Forest clearances: With the curtain drawing on the Go/ No-Go issue, we expect hat the forest clearance will be much more timely and systematic
  • Avoid linking of environmental clearance with forest clearance
  • The new land acquisition bills/ rules can provide for compulsory land acquisition for areas bearing natural resources
  • Provide PL immediately to all pending applicants along with the permission to prospect in forest areas – prospecting need not involve any forest loss.
increasing the production for the future
Increasing the production for the future..
  • Coal Block allocation through competitive bidding is the next step:
    • Avoid the issues of environment and forest clearance by pre-screening the blocks
    • Increase coal production through involvement of real mining companies and avoid squatters that may hold on the resource
    • Avoid speculation by providing as much data as possible
    • Up-front premium just increase the speculation premium rather than bringing in real efficiencies
  • The long expected coal regulatory system can take care of the concerns about excessive profiteering by the mining companies
  • Result: The coal will be available in plenty, to all the needy, and at the right cost.