1 / 35

Report on the meeting of ITPA TG Steady-State Operations and ITPA TG Transport proposal

Report on the meeting of ITPA TG Steady-State Operations and ITPA TG Transport proposal. Francesco Paolo Orsitto ENEA C R Frascati. contributions. G Sips, T Luce N Hawkes, C Maggi E Doyle. Outline. ITPA SSO : i) Summary of arguments discussed ii)Messages to TG Diagnostics

knox
Download Presentation

Report on the meeting of ITPA TG Steady-State Operations and ITPA TG Transport proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on the meeting of ITPA TG Steady-State Operations and ITPA TG Transport proposal Francesco Paolo Orsitto ENEA C R Frascati 12th ITPA Princeton march 07

  2. contributions • G Sips, T Luce • N Hawkes, C Maggi • E Doyle 12th ITPA Princeton march 07

  3. Outline • ITPA SSO : • i) Summary of arguments discussed • ii)Messages to TG Diagnostics • ITPA TG Transport : proposal for detailed design of turbulence measurement set for ITER ( possibly to be discussed in detail in the session on measurement requirements,Thursday morning ) 12th ITPA Princeton march 07

  4. Summary of ITPA SSO Meeting 12th ITPA Princeton march 07

  5. Arguments discussed • ITER Design Review : Issue cards( including issue cards presented by A Costley and R Boivin) • High Priority tasks • Modelling:simulation of core-pedesal-divertor plasmas • MHD in Hybrid scenarios (Joint Meeting w ITPA MHD) • Pedestal physics (Joint Meeting with ITPA Pedestal) • Actuators and modelling • Real Time plasma control • ITPA Joint experiments 12th ITPA Princeton march 07

  6. SSO TG: High priority tasks for 2006/2007 (Not in order of priority) • Continue the focussed modelling activity on ITER Hybrid and Steady state scenarios, using standard (and common) sets of input data. • Assess requirements for real-time control in ITER and increase collaboration in joint experiments on real time control. • Pedestal studies: Experiments to document pedestal in advanced scenarios, modelling of pedestal, pedestal conditions in ITER (maximum Tped). • Code benchmarking of LHCD and NBCD and implications for ITER. • The current rise of advanced scenarios, in particular requirements for the ITER start up phase. Questions to TG Diagnostics 12th ITPA Princeton march 07

  7. edge studies Steady State Scenario studies should have a stronger overlap with edge studies, as the edge plays an important role in advanced scenarios Publication at the IAEA by C. Maggi (AUG): “Characteristics of the H-mode Pedestal in Improved Confinement Scenarios in AUG, DIII-D, JET and JT-60U” 12th ITPA Princeton march 07

  8. Hybrid definition: Summary of SSO discussion • So far data has been provided to the confinement databases that are hand selected. Data from JET, DIII-D, AUG and JT-80U. • H98 should not be used to select the data. • With the ITER target for Hybrid operation or Q>10 a selection on beta can be made. Either a fixed value: bN > 2.5. Or better: At q95 ~ 4.5, bN > 2.7, At q95 ~ 3.2, bN > 2.2. • Plasma inductance is strongly correlated with beta. Both beta and li can not be used. Use of beta is preferred. • The resistive diffusion time (tR) should be a variable in the database. Allows selection of pulses that achieve high beta with relaxed q-profile. (Or an indication on the change of the current profile during the time window selected) 12th ITPA Princeton march 07

  9. 12th ITPA Princeton march 07

  10. Observations of TG SSO for the attention of TG Diagnostics 12th ITPA Princeton march 07

  11. Measurement availability during current rise • 1. The diagnostic availability during the current rise phase. Both diagnostic beam and heating beams may not be available. • 2. The heating beams: The SSO group is concerned on the requirement to have both heating beams for complete diagnostic measurements. 12th ITPA Princeton march 07

  12. ITER Neutral Beams • 2 Heating Beams + 1 optional: (HNB) • (1 MeV D2 modulated) • HNB are : voltage modulation • 1 Diagnostic Neutral Beam (DNB) • (100 kev H2 1-3 s every 10-20s) • DNB is independent but not continuous • Beam cross section 30X30 cm2. 12th ITPA Princeton march 07

  13. ITER requirement on MSE measurements 12th ITPA Princeton march 07

  14. MSE diagnostic HNB5 HNB4 eqport3 center is covered by NHB4 edge by HNB5 So both beams must work to Have a complete coverage of plasma eqport1 12th ITPA Princeton march 07

  15. DNB is used by CXRS systems 12th ITPA Princeton march 07

  16. Spatial resolution of the diagnostic Spatial resolution requirement (a/20 = 10 cm) is not satisfied everywhere it remains under 15 cm everywhere, and better than a/40 around rho= 0.2 and 0.65 12th ITPA Princeton march 07

  17. MSE diagnostic on DNB • A MSE diagnostic using s/p ratiometry method is proposed as a complement to CXRS on DNB (M. von Hellermann). • Two observation ports for central MSE and edge MSE • Spatial resolution requirement satisfied. 12th ITPA Princeton march 07

  18. MSE availability • No heating beam will be available for early part of current rise (ne < 4x1019m-3). • Scenario development and control require routine MSE measurements. • Hence there is a concern on q(r) availability during current rise. 12th ITPA Princeton march 07

  19. MSE measurements in AT scenario • AT scenario would require off-axis shift NNBI • How about MSE measurements and central q determination in this condition? • Would the polarimetry do the job? 12th ITPA Princeton march 07

  20. MSE meas vs NNBI power modulation • It has been decided to carry out the power modulation of NNBI by accelerating voltage change, (modulation of 800kV-1MV, in 100ms). • How about impact on MSE measurements? 12th ITPA Princeton march 07

  21. TG DIA to answer about Availability of measurements during current ramp upTG OSS to assist in plasma scenario evaluation • 1.What about the diagnostics beam availability during the current rise? • 2.Which measurements will not availed without any beam heating or with just 1 heating beam. • 3.Accuracy of the q-profile determination during the current rise 12th ITPA Princeton march 07

  22. Measurements in new scenarios • Physics requirements: • qmin = 2 at 9MA : To give access to AT scenarios with Q~5 • qmin = 1.5 at 12MA: To allow Hybrid scenarios with 1 < qmin< 1.5 for long pulse component testing in ITER. • qmin > 1 at 15MA: To establish discharges with Q > 10 potential, or give more margin for primary design goal. 12th ITPA Princeton march 07

  23. Measurements • These scenarios are different from what is current proposed and have different (more strict?) requirements on availability of plasma equilibrium and q(r) profile information. 12th ITPA Princeton march 07

  24. ITPA TG Transport Proposal 12th ITPA Princeton march 07

  25. Physics justification for detailed design of turbulence measurement set for ITER Goal: Raise priority of turbulence measurements on ITER, such that possible measurement approaches are defined and detailed machine interface design performed. 12th ITPA Princeton march 07

  26. Desired measurement set • (1) Survey capability: Ability to continuously monitor turbulence in 0<ks<1 wavelength range across plasma diameter. Need not have significant radial localization. • (2) Detailed local measurements: Local measurements of fluctuation amplitudes, correlation lengths, S(k), and poloidal turbulence flow velocities at multiple and/or variable locations across plasma radius, from core to edge. A broader wavelength coverage, such as 0<ks<6 is also desirable, so as to measure wavelengths relevant for electron transport. Measurement of several fluctuation fields is also desirable. 12th ITPA Princeton march 07

  27. Physics justification • Establishing a full theory-based understanding and predictive capability for transport in burning plasmas. Only turbulence measurements can provide fundamental verification and validation of theory/modeling. • New turbulence/transport interactions are possible in a burning plasma with dominant alpha heating. For example, any prompt core alpha loss will generate a radial electric field and hence generate ExB field shear, leading to turbulence suppression, and enhanced alpha production. • Localized fluctuation diagnostics are essential for studies of energetic particle and Alfven mode physics in ITER. The study of such modes and their potentially critical effect on alpha confinement is an essential component of the ITER physics program. 12th ITPA Princeton march 07

  28. conclusions • Interesting contacts with ITPA TGs at Meetings after IAEA Chengdu. • Two messages : • TG SSO concerned about the measurements of MSE during current rise • TG Transport : priority to be increased on fluctuation diagnostics 12th ITPA Princeton march 07

  29. Slides for discussion 12th ITPA Princeton march 07

  30. Issue card1: Decision on Additional Heating Upgrade( A Costley) • Action Implied for the Design Activity: Decide now on the option for the additional heating upgrade (73 MW -> 110 MW), that is third NB or additional RF. • Re the HB issue (diag issue #1). • The point is that if we carry the option of beams or RF for the planned auxillary heating upgrade into the operation, and then subsequently chose the RF, we will have a far from optimum use of the ports. We could effecetively lose two ports (one at the mid-plane and one at the upper level). If, on the other hand, we choose to upgrade the beams, we will lose a lot of operation (maybe one year). • Making the decision now, enables us to optimise the use of the ports and the operation. The decision has to be made at some stage and so why not now. 12th ITPA Princeton march 07

  31. 12th ITPA Princeton march 07

  32. Issue #1 • Currently mid-plane ports 4, 5 and 6 are set tangential to take NBs. • Port 7 is occluded by the tangential port 6 and has very limited use. • Upper ports, 4, 5, 6 and 7 are also topologically in the NB Cell and so will have restricted use, possibly severely restricted. • The option of using port 6 for a neutral beam severely disables equatorial port 7 and upper port 7, whether a neutral beam is ever installed there or not. • If it is decided during the operation programme to add the third NB there will be minimal impact on other systems, although probably a significant down time to install it (one year?). Because of this delay, it is not clear if such a retrofit is feasible. 12th ITPA Princeton march 07

  33. Issue #1 • On the other hand, if it is decided to upgrade the RF systems during the operation, then the plan is that the diagnostics currently in port 11 will be relocated into the tangential port 6. • This has several disadvantages: • (i) the diagnostics will probably have a reduced capability in this port, • (ii) they will be located in the NB cell with the potential attendant problems of contamination and activation, and • (iii) they will require special provisions (extra cost) for handling and maintenance. • This will be a far from optimum use of the ports. The machine and the programme will suffer the disadvantages and the cost of three tangential ports but only get the benefit of two. 12th ITPA Princeton march 07

  34. Issue card 4:Specifications of the diagnostic neutral beam( R Boivin) • The primary motivation for the DNB is • the light ion and He ash measurement via CXRS. • the beam will also be used for ion temperature and rotation measurements. • Presently the requirements on the DNB have not been optimized: • Of particular concern is the proposed duty cycle and pulse length which do not allow continuous measurements during the ITER pulse. • This would also prevent scenarios where rotation control using the CXRS/DNB measurements is needed for long periods and/or with sufficient time response. • the parameters of the DNB (specifically non continuous operation) may not allow the use of CXRS as a control measurement. • Question:could the DNB spec be changed to make it possible? 12th ITPA Princeton march 07

  35. Issue card 5:Specifications of the (heating) beams( R Boivin) • Action Implied for the Design Activity: • Is there a limitation on current drive control due to the current configuration of the MSE diagnostic that uses both heating beams? • The heating beams serve for heating, current drive and rotation control. • the 2 beams will be used for the MSE diagnostic . • Since only 2 beams are presently envisioned : • the actuators and sensors are based on the same element, namely the heating beams, if the MSE measurement is used in feedback control. the lack of a beam for physics and/or control reason would represent the lack of a measurement and create potentially difficult situations. 12th ITPA Princeton march 07

More Related