An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECE-537Digital Image Processing Prof. K. J. Hintz http://cpe.gmu.edu/~khintz http://cpe.gmu.edu/ K. Hintz, 1996-2002

  2. Course Objectives • Develop an Understanding of Basic Image Processing Techniques Through Lecture, Study, and Exercises • Develop a Fluency With a Digital Image Processing (DIP) Software Package, e.g., Cantata, Through Experience • Implement an Independent DIP Project Which Demonstrates Your Ability to Integrate the Mathematical Theory With the Practical Issues K. Hintz, 1996-2002

  3. Milestone Chart K. Hintz, 1996-2002

  4. Khoros Image Processing Software • Composer • Toolboxes • Cantata (our primary interest) • Workspaces for interactive DIP programming • Glyph-based scripting language • Workspaces are in ASCII text format K. Hintz, 1996-2002

  5. Image Processing Software • Khoros Will Be Installed Soon on iris.gmu.edu • Class List Will Be Given to Computer Administrator to Put in Group for Access to Software • Students can get combination to S&T-II room ___ to have access at non-class times • Khoros can be run effectively on a sufficiently powerful PC running the Linux operating system • Windows version requires Xwin32 X K. Hintz, 1996-2002

  6. Khoros Availability • Students wishing to use Khoros at home can download the student version from the Khoros web site at no charge • Build it yourself, straightforward • http://www.khoral.com/khoros/kp2001_student/ • Binaries available from Amazon for $30 K. Hintz, 1996-2002

  7. Linux Operating System • PC based, x86 • The more RAM the better • Linux can be downloaded free • http://www.ibiblio.org/pub/Linux/distributions/ • Various distributions available on CDROM (~$40) with various levels of support K. Hintz, 1996-2002

  8. Linux Components Needed to Install/Use Khoros • gzip • ANSI-C compiler, e.g., gcc • X-Windows (X11R4, R5, or R6) Software Development Environment, e.g., XFree86 • Athena, Motif, or OLIT widget set • Lex & YaCC (or bison & flex) • Optional • perl • groff (needs C++ compiler) • Fortran Compiler or f2c (matrix & geometry TB) K. Hintz, 1996-2002

  9. Useful Free Linux Software • GIMP • GNU Image Manipulation Program • XV • Display images • Image format conversion • Color manipulation • Some image processing operators • Smooth • Dither • Enlarge • Oil paint K. Hintz, 1996-2002

  10. Digital Image • N-Dimensional Data, Not Necessarily Visual Image • Passive Sensors • Infrared • Ultraviolet • Visual • Multi-spectral, hyper-spectral • State of point • Active Sensors • Imaging radars • Synthetic aperture radar (SAR) • X-ray K. Hintz, 1996-2002

  11. Passive Sensor Data • Infrared • Single-band/Dual-band • 3-5 micron and/or 8-12 micron wavelength • Greyscale image • Ultraviolet • Visual • Greyscale • HSI K. Hintz, 1996-2002

  12. Passive Sensor Data • Multi-spectral, hyper-spectral • Each pixel is n-dimensional vector • Subdivides sensor bandwidth with narrow-band filters • State of point K. Hintz, 1996-2002

  13. IR Images of Clouds Near-IR, 3-5  Far-IR, 8-12  K. Hintz, 1996-2002

  14. UV Image of Foraminifera K. Hintz, 1996-2002

  15. Visual Image, BW vs. Color Same spatial resolution 20 kByte 29 kByte K. Hintz, 1996-2002

  16. Digital Image • Computed Data • Function representation • Visualization of complex functions, e.g., Mandelbrot set • Virtual reality • Fabric draping K. Hintz, 1996-2002

  17. Active Sensor Data • Imaging Radars • 95 GHz ==>  = 1/8 inch • Frequency chosen based on atmospheric absorption bands • (Inverse) Synthetic Aperture Radar ((I)SAR) • Multiple measurements from long baseline of moving sensor • ISAR uses movement of target • X-ray K. Hintz, 1996-2002

  18. SAR Image of Airport Synthetic Aperture Radar K. Hintz, 1996-2002

  19. X-Ray MRI Khoros K. Hintz, 1996-2002

  20. Digital Image • Quantized • Amplitude • Intensity • Absorption • Numerical value (magnitude) • Color or pseudo-color • Signal strength • Spatially (Khoros notation) • Height in rows • Width in columns K. Hintz, 1996-2002

  21. Synchronous Amplitude Quantization K. Hintz, 1996-2002

  22. Spatial Quantization K. Hintz, 1996-2002

  23. Processing vs. Analysis • Digital Image Processing (DIP) • “manipulation of images by computer” • Texture and edges • Segmentation • Enhancement • Mensuration • Movement • Feature extraction K. Hintz, 1996-2002

  24. Analog Image Processing • Analog Image Processing • Optical SAR, Fourier transform • Film processing • Image summation • Color, e.g., TV RGB K. Hintz, 1996-2002

  25. Processing vs. Analysis • Image Analysis • Pattern recognition • Automatic control • Content • Operates on features or symbolic representation • Optical character recognition (OCR) • Handwriting • Intelligence K. Hintz, 1996-2002

  26. Fractal Dimension of IR Clouds K. Hintz, 1996-2002

  27. Character Recognition Extract Rotate Segment Classify Parse…no K. Hintz, 1996-2002

  28. Image Spatial Manipulation Matlab Example K. Hintz, 1996-2002

  29. Foreground/Background Marr, Computer Vision K. Hintz, 1996-2002

  30. Foreground/Background K. Hintz, 1996-2002

  31. Digital Image Processing • Digital Image • “...a sampled, quantized function of two dimensions that has been generated by optical means, sampled in an equally spaced rectangular grid pattern, and quantized in equal intervals of amplitude.” • Processing • “...starts with one image and produces a modified version of that image [without interpreting it]” K. Hintz, 1996-2002

  32. Discrete vs. Continuous Approaches • Image Consists of Discrete Points • Each pixel is a unique, independent entity • Process points rather than entities in image • e.g., calibration of column of individual detectors used to generate image • Assumes no underlying continuous process K. Hintz, 1996-2002

  33. Discrete vs. Continuous Approaches • Continuous Approach • Underlying process is continuous, e.g., optical image of real object • Processing mathematics are continuous with a discrete approximation, e.g, Fourier Transform and DFT K. Hintz, 1996-2002

  34. Digital Processing of Images • Completely Accurate Only when Original Data is Quantized and Output is Quantized • Usually Done for Convenience • Digital Image is Approximation of Real, Continuous Image • Digital Operations are Approximations of Continuous Mathematical Processes K. Hintz, 1996-2002

  35. Processing Artifacts • Approximate Operations on Approximate Images can Yield Sampling Effects • Moiré pattern (continuous also) • Ragged edges • Gibbs phenomenon K. Hintz, 1996-2002

  36. Gibbs* Phenomenon • Insufficient Bandwidth to Completely Represent Edge • Simulated by • Discrete Fourier transform • Discard high frequency spectral lines • Inverse DFT • Results in “Ringing” Near Edges *Ziemer, Tranter, Fannin, Signals and Systems: Continuous and Discrete, Macmillan, 1989. K. Hintz, 1996-2002

  37. Square-in-Square Cantata Workspace K. Hintz, 1996-2002

  38. Gibbs Phenomenon Workspace K. Hintz, 1996-2002

  39. Expansion of S-in-S Glyph K. Hintz, 1996-2002

  40. Inset Glyph Menu Pane K. Hintz, 1996-2002

  41. PSD of S-in-S K. Hintz, 1996-2002

  42. Interactive Thresholding K. Hintz, 1996-2002

  43. Gibbs Phenomenon K. Hintz, 1996-2002

  44. Unified DIP Approach • Characterize Effect of DIP from Knowledge of Continuous Form’s Behavior • A/D --> Process --> D/A Without Loss or Significant Degradation of Content of Interest • Sampling and DIP Artifacts • Predict their occurrence • Recognize them when they occur • Eliminate or minimize their deleterious effects K. Hintz, 1996-2002

  45. DIP is Multidisciplinary • Preparation of Object to be Imaged • Stain used for tissue (biology) • Illumination (photography) • X-ray energy and energy spectra (physics) • Selection of amplitude and spatial resolution (communications) K. Hintz, 1996-2002

  46. DIP is Multidisciplinary • Digitizing the Image • Equipment selection (CCD, near-IR, far-IR, x-ray, etc.) • Signal-to-noise ratio (communication theory) • Full dynamic range of resulting image and bias errors (A/D converters, amplifiers, electronics) • Purpose for images (end user) K. Hintz, 1996-2002

  47. Image-to-Image Consistency • Amplitude calibration • Grey-scale charts • Visual scenes • Stepped wedges • X-ray absorption images • Black-body • Spectrum proportional to T4 • Hot body, cold body calibrate endpoints • Multi-spectral K. Hintz, 1996-2002

  48. Image-to-Image Consistency • Spatial calibration • Fiducial marks • INF Treaty X-Ray example • Easily identifiable features • Crosses on roadways for satellite landmapping • Known geometry of acquisition system and scene • Structured light example K. Hintz, 1996-2002

  49. Image-to-Image Consistency • Image-to-Image Consistency • Temporal imaging • Intelligence analysis, airplanes in/out of airport • Velocity estimation • Database change • Image registration • Anomaly detection • Known clutter removal K. Hintz, 1996-2002

  50. Image-to-Image Consistency • Clutter Removal (image next slide) • Real signals, not noise • Characteristics of clutter • Statistical properties • Shape • Random • Geometric • Distinctive features K. Hintz, 1996-2002