An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conversion of Suncor’s South Rosevear Facility to Acid Gas Injection Jim Maddocks, P.Eng./ Mark Conacher, P.Eng./ Leroy Dixon Gas Liquids Engineering Ltd. Suncor Energy Alberta, CANADA

  2. Conversion of Suncor’s South Rosevear Facility to AGI • Background • Process Description • Project Stimulus • Compression Design Aspects • System Design Concepts • Start-up • Acknowledgements GPAC 2007, Calgary

  3. Background • Suncor – a growing integrated energy company strategically focused on developing one of the worlds largest petroleum reserve basins – Canada’s Athabasca oil sands. • In addition Suncor owns and operates a number of conventional sour and sweet gas facilities in Alberta and British Columbia including South Rosevear near Edson. GPAC 2007, Calgary

  4. Background • The plant was originally constructed in 1979 to process 1409 e3m3/day of Beaver Hill Lake (BHL) sour natural gas. • Built to process high pressure gas with no plant compression • Sulfinol-D sweetening for H2S, CO2 and mercaptan control. • Propane refrigerant based DPCU with EG injection for hydrate control. • Originally a single train with C5+ recovery and no recycle gas compression GPAC 2007, Calgary

  5. Background • Constructed as a 3 stage conventional Claus plant to recover sulphur • Later Suncor added a low pressure inlet train for declining BHL pool and inlet compression • Added supplemental gas refrigeration process module, inlet condensate pumps, deethanizer, liquids storage, and recycle compression. GPAC 2007, Calgary

  6. Background • Amine • Gas is sweetened in a 29 tray (1.8 m dia) contactor with Sulfinol-D solution at 600 USGPM (136 m3/hr) • LP Steam used for regeneration heat • HP Steam turbine drive amine charge pumps • Refrigeration • Two process trains with a deethanizer and sour stabilizer, LPG production and C5+ liquids GPAC 2007, Calgary

  7. Background • Claus Unit: • Conventional 3 stage unit with straight-through processing and standard alumina catalyst. • Direct fired reheaters • 171 tonnes/day design, roughly 50 mole% H2S • LP Amine Flash Gas • Sweetened and used as low grade fuel for boilers and incinerator GPAC 2007, Calgary

  8. GPAC 2007, Calgary

  9. Project Stimulus • Decreasing acid gas volumes • Difficult Claus conversion and increasingly difficult to maintain reheat temperatures and recovery levels. • Plant was operating at 20% of Claus unit design throughput. • Desire to minimize emissions • Plant had declined to less than 400 e3m3/day BHL production with new CO2 rich sweet gas. GPAC 2007, Calgary

  10. Project Stimulus • Acid Gas Design parameters • Elected to seek regulatory licence for (2) 800 HP AGI compressors with a licence for 100 tonnes/day of equivalent Sulphur disposal. • Although acid gas was only 50 mole % H2S, the facility was licensed for 60 mole % to account for changing inlet composition and potential for 3rd party gas. • Each compressor was sized to handle 76 e3m3/day of acid gas. GPAC 2007, Calgary

  11. Project Stimulus • Acid Gas Design parameters • Loss of waste heat boiler and sulphur condensers meant requirement for additional steam. • Performed steam system analysis and determined incremental requirement for 25,000 pph of 50 Psig steam. • Re-worked amine charge pump turbines for maximum steam efficiency on the 400# steam. GPAC 2007, Calgary

  12. Project Basis • Injection Well • Selected Suncor’s 8-11 BHL well located 600 meters south – short pipeline minimizes possible release. • Mature gas reservoir – never produced due to water encroachment – abandoned in 1996. • 3280 meters to completion in zone. • Reviewed casing bond log, well bore parameters, and performed injectivity test to prove injection into zone GPAC 2007, Calgary

  13. Project Basis • Injection Well • Relatively low reservoir pressure at 3-4000 kPa • Excellent porosity, permeability and good containment. • Well was re-licensed and re-completed into BHL zone with excellent formation characteristics, quality, and a definable size. • Acid gas injection was estimated to take up less than 10% of the formation volume with no discernible increase in formation injection pressure over the project life. GPAC 2007, Calgary

  14. Project Basis • Injection Well • Initiated injection modelling to simulate long-term injection. • As a result of the modelling and regulatory concerns, several area production pipelines were re-licensed for 30 % and provision for fuel gas blending considered. • Simulation results indicated migration was predicted late in the project life. GPAC 2007, Calgary

  15. Compression Concepts • 4 stage reciprocating compression to achieve the required discharge pressure. • Desire to minimize hydrate concerns and eliminate need for external dehydration. • Electric drive compression for maximum flexibility, minimal capital, and high degree of reliability. • Very low suction pressure of 49-65 kPag – compressor must handle amine plant regen gas regardless of volume and composition GPAC 2007, Calgary

  16. Compression Concepts • Variable speed compression for maximum turndown and response. • Air based aftercooling to 43°C • System must appear “bumpless” to minimize upstream process upsets. • Increases in acid gas volume must be handled by the compressor prior to flaring and regulatory non-compliance. GPAC 2007, Calgary

  17. Compression Concepts • Automatic capacity control system with a combination of speed, and auto-bypassing. • Minimize suction pressure drop. • Compressor maximum speed limited to 900 RPM for long-term life and low maintenance. • Compressor min speed limited to 300 RPM by mfr. for oil handling and torque considerations. • Discharge of 6000-8000 kPag. GPAC 2007, Calgary

  18. System Design Concepts • Acid gas contained 4% hydrocarbons affecting hydrates, water removal, and ultimately system performance. • Minimal effect on system capacity – hydrate “shift” doesn’t take place. • Gas exiting the amine regenerator is water saturated as a function of temperature: • @ 49°C = 68 g/M3 • @ 35°C = 33 g/M3 GPAC 2007, Calgary

  19. System Design Concepts • Compression without dehydration would have displayed a high hydrate temperature of roughly 26°C at discharge pressures. • Lowering final stage temperature to ground temperatures of 4°C required removal of water from interstage with supplemental cooling. • Elected to use existing plant propane refrigerant to cool acid gas mixture to 15°C after 2nd stage discharge. GPAC 2007, Calgary

  20. GPAC 2007, Calgary

  21. System Design Concepts • Lowering aftercooling temperature to 15°C removed considerable condensed water and hydrocarbons and allowed for a 20°C shift in acid gas hydrate temperatures. • Cooling require small amount of methanol injection to prevent formation of hydrates though chiller. • Single propane chiller with two(2) compressors – propane operated at 10°C to prevent tube wall over-chilling – cascaded control loops for maximum control. GPAC 2007, Calgary

  22. System Design Concepts • Condensed water, hydrocarbons and a small amount of methanol are blowcased back to the plant for re-processing in the stabilizer and water handling system. • 4th stage liquids (if any) are cascaded back into the 3rd stage suction scrubber. • 3rd stage liquids cascade back into the 2nd stage scrubber. • 2nd stage liquids flow to the blowcase for pushing to the plant GPAC 2007, Calgary

  23. System Design Concepts • Any stage 1 liquids are pumped intermittently to the blowcase. • Blowcase push gas is 3rd stage warm discharge to minimize the possibility of fuel gas contamination within the compressor system. • The existing plant water flash tank was low pressure and 2 phase requiring replacement with a higher pressure 3 phase vessel so that the hydrocarbon could be sent to the Stabilizer. GPAC 2007, Calgary

  24. System Design Concepts • Dual recycle system utilizing: • Stage 1 suction pressure makeup using cool stage 2 discharge gas – no danger of hydrates or liquids JT effect • Stage 4 hot discharge gas bypass to inlet of stage 2 intercooler for intermediate pressure makeup. • Aux blower for consistent motor cooling • Fully electronic control system with PLC and operator annex for sour vapour isolation. GPAC 2007, Calgary

  25. System Design Concepts • Magnetic level gauge for “glass-less” system. • Allowed for electronic tracking of blowcase events • Redundant thermal LSH for maximum protection. • Electronically controlled oil cooling system. • Vacuum pump system for cylinder distance piece evacuation • Electronic vibration monitoring • Engineered metallurgy for maximum system integrity. GPAC 2007, Calgary

  26. System Design Concepts • Complex system of auto-isolation and bypass valves for the chiller to allow for start-up and blowdown conditions as well as being able to start a single compressor when the other compressor is on-line. • System had to appear “bump-less” to prevent pressure bumps during automation cycle. • Automated blowcase valving system for moving water back to the plant for processing. GPAC 2007, Calgary

  27. System Design Concepts • Combination inter/aftercoolers with a single variable speed fan. • Complex system of electronic louver control as well as ambient air recirculation for winter service. • Cooler control system looked at which cooling service required maximum cooling and that became the determining variable for the fan speed control loop. GPAC 2007, Calgary

  28. System Design Concepts • Provision for methanol injection into the cooler in the event of hydrates. • Ambient recirculation heater for extreme winter operation. • Provision for methanol injection into pipeline as a final safe-guard. GPAC 2007, Calgary

  29. System Design Concepts • Chiller methanol injection rate is algorithm controlled for optimization of methanol rate. • Dependant on total gas rate (function of compressor speed), intercooling temperatures, and 1st stage suction temperature. • Methanol pumps are lead/lag for auto-backup, and equipped with variable speed drive. GPAC 2007, Calgary

  30. System Design Concepts • Auto pressure-controlled flaring of acid gas from the amine regenerator during over-capacity situations or compressor/injection failure due to any conditions, i.e., line hydrate, compressor shutdown, power failure, etc. • Recording of acid gas to flare for regulatory compliance. • Algorithm controlled fuel gas addition to allow for adequate heating value and proper regulatory dispersion of SO2. GPAC 2007, Calgary

  31. System Design Concepts • Each compressor is equipped with suction and discharge ESD valves that will open automatically on start-up – also equipped with position switches. • Each compressor has auto-blowdown to ensure ESD compliance as well as auto-blowing down to a predetermined pressure level prior to start-up to reduce initial loads and torques. • Auto-pre and post purge to reduce concentration of acid gas remaining in compressor during long-term shutdowns as well as initiating a pre-maintenance purge sequence. GPAC 2007, Calgary

  32. System Design Concepts • Materials: • Compressor piping – full stainless design for maximum protection with free acid gas water. • Cooler sections – stainless steel for condensing service. • Scrubbers – stainless • Blowcase – stainless • Chiller – stainless tube and tubesheet with carbon steel refrigerant shell. GPAC 2007, Calgary

  33. System Design Concepts • Materials, cont’d: • Pipeline: select chemistry carbon steel with hardness controlled weld procedures. 3” A333 Gr 6 Sch 80 SMLS pipe • Designed and licensed to 12.1 MPa • Not piggable under normal conditions but smart pig enabled GPAC 2007, Calgary

  34. System Design Concepts • Materials, cont’d: • Valves: stainless steel in wetted service • Control valves: stainless steel • Wellhead piping: A333 Gr 6 carbon steel • Suction piping: carbon steel – hardness controlled welding. GPAC 2007, Calgary

  35. System Design Concepts • System is also equipped with an instrument fuel gas line permitted and constructed to the same specifications as the acid gas line – allowing manual switchover during line maintenance or in the event of injection line problems. • All instruments are removable and cables can be rolled up for easy wellhead access. • Injection well is wireline serviceable through the building roof. GPAC 2007, Calgary

  36. System Design Concepts • Wellhead is equipped with • pressure control valve • Redundant pressure switches for high and low pressure conditions. • Plant controlled fail-close wellhead ESD valve • Subsurface fail-close ESD valve located 50 meters below grade. • Removable building for well access GPAC 2007, Calgary

  37. Start-Up • Phased start-up due to equipment delivery issues. • Phase 1: Sour water pumps, and sour water flash tank. Commission 4160 volt electrical • Phase 2: Air testing of compression equipment and full compressor run test with fuel gas. • Phase 3: N2/He testing of acid gas compression equipment and wellhead piping. • Phase 4: LP Boiler start-up • Phase 5: Claus unit shutdown and AGI initiation GPAC 2007, Calgary

  38. Start-Up • Phase 2 • Fuel gas run test allowed for full compressor performance and controls checking without lethal environment • Able to simulate capacity variations to match process and allow for ramp testing, bypass tuning, start-up sequencing and cooler controls tuning. • Allowed for chiller commissioning on fuel gas and tuning of control loops. GPAC 2007, Calgary

  39. Start-Up • Phase 3 • Full N2/He testing of compressor piping, scrubbers, and all connections to verify integrity of connections. • Costly but necessary • Repaired numerous leaks. • Provided a superior level of integrity and operator confidence. GPAC 2007, Calgary

  40. Start-Up • Phase 4 • Brought LP steam boiler on line and allowed for several weeks of steam system performance. • Controls testing and evaluation of new LP boiler control system. • Established operator confidence in LP boiler response and performance. GPAC 2007, Calgary

  41. Start-Up • Phase 5 • Shut down Claus unit early on Monday morning at 6:30 am and sent acid gas to flare. • Initiated and tuned new fuel gas controls to flare for dispersion requirements. • Swung blinds and block-in SRU • Brought acid gas into compressors and started 1st compressor on acid gas. • Purged compressor and initiated injection into wellbore. GPAC 2007, Calgary

  42. Start-Up • Phase 5 • Injection proceeded same day as shutdown. • Injection continues at this point with minor interruptions due to controls and other upstream process upsets. • Injection pressure as per predictions. GPAC 2007, Calgary

  43. Start-Up Issues • Start-up Issues • Hydrate in compressor discharge line during fuel gas pre-test operation – presumably hydrotest water left in piping. Freed up with methanol injection. • Minor leaks from flanges • Vacuum pump failures • Tuning on aftercooler louvers proved very difficult. GPAC 2007, Calgary

  44. Start-Up Issues • Start-up Issues • Hand held radio’s transmit on same frequency as vibration sensors and caused shutdown. • Blowcase valving installed incorrectly. • Extensive tuning of compressor ramping required due to interaction of dual bypasses and shutdown conditions. • Chiller valve sequencing, by necessity, became somewhat complex. GPAC 2007, Calgary

  45. Start-Up Issues • Start-up Issues • Chiller propane vapour can condense in the return vapour line during cold ambient conditions. During winter start-up, the chiller vapour return line experiences slugging – chiller vapour re-routed to inlet of existing gas chiller. • Chiller P bounces during a switchover causing shutdown – modified to alarm condition. GPAC 2007, Calgary

  46. Start-Up Issues • Start-up Issues • Continued periodic failure of vacuum pumps – particularly during flaring situations. • Minor instrumentation and controls issues. • Remarkably uneventful GPAC 2007, Calgary

  47. Summary • Summary • Very successful injection project. • Acid gas well is performing exactly as anticipated. • Compressors are proving to be very responsive and flexible to required conditions. • Once again – the old adage – you can’t ignore the details. GPAC 2007, Calgary