1 / 16

Operations

Operations. Problems and failures Work in progress Work completed Problem reporting Safety New facilities. Problems and Failures Telescopes. Actuator cylinder leaks Drive motor bearings Rotator PWM drive amp, motor, servo Mirror cover drives

kiefer
Download Presentation

Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operations • Problems and failures • Work in progress • Work completed • Problem reporting • Safety • New facilities

  2. Problems and Failures Telescopes • Actuator cylinder leaks • Drive motor bearings • Rotator PWM drive amp, motor, servo • Mirror cover drives • M1 mirror thermal control (mixing valve) • Hard Point leaks • Wide field collimation

  3. Work in Progress • Telescopes • Actuator leak repair • New actuator control cards • New PWM amps on rotators • Guider normalization, wiring, PLA’s, IMS drives, • M1 thermal control mixing valves • M1 Mirror cover drives, new bushings

  4. New Version of Actuator Card

  5. Dual Actuator

  6. Actuator cylinder

  7. Hard Point Actuator

  8. Problems and Failures Enclosures • Shutter structure Clay • Enclosure jib cranes • UPS batteries • Louver seals • Wind Screen & Moon Roof drives • Rotating interface seal

  9. Work in Progress • Enclosures • Louver seals • Rotating interface seals • Windscreen & Moon roof drives • Rotating seal (Baade) • Louver position encoders limits • Power line slip ring modems

  10. Work In Progress • Software • M3 Tip-Tilt automation • Code normalization, ini files • Translate Fortran to C++ (enclosure) • Windscreen & Moon roof automation • EDS query tools • PWM Amps, Rotator guiding, servos • M1 thermo control servo

  11. Work completed • Iodine cell actuator (Clay), ADC (MIKE) actuator and guider (#6) installed and tested • New rotating enclosure seal (Clay) • New jib crane limit switches (both enclosures) • New flat field lamp supplies and software • Aluminized M1 and M3 mirrors Baade • Washed M1 and M3 mirrors Clay • Clay shutter drive U-joint replacement • New Az & El drive bearings Clay

  12. Problem reporting • Gnats problem tracking software installed locally. This is now our only problem tracking system • Telescope reports for night time problems and comments • Forums are used to transfer information and changes

  13. Safety • Safety review by ACHS • Fire detection system was inspected and serviced • Fire extinguishers serviced • New policies on equipment operations, licenses required for all equipment, classes, training and licensing in progress • Road maintenance in progress • Poly-clinic inventory & supplies.

  14. New Dormitory and Infrastructure • Conversion of Nagoya control room • Architecture review complete and contract in place • Construction crews on site • Completion ~June • Kitchen renovation programmed for May

  15. New dorm floor plan

  16. New Dormitory

More Related