An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 回焊爐BTU操作規范

  2. 開机步驟---(一) • 1 打開穩壓器開關 • 2 打開回焊爐主電源開關 • 3 打開爐子內部電源UPS • 4 打開電腦 • 5 等待Wincon聯接 • 6 選擇所需程式投入生產

  3. 1 執行Cool down程序 2 等待約45分鍾,使爐內溫度均低於1000C 3 執行Shut off程序 4 退出Wincon及Window 關机步驟---(一)

  4. 關机步驟---(二) • 5 關閉爐子內部電源 • 6 關閉電源開關 • 7 關閉穩壓電源

  5. 注意事項---(一) • 1 爐子加熱生產時,手.身體不要伸入爐中 • 2 爐子蓋子在平時生產時不能隨便打開 • 3 正常生產時,四個E- Stop不能隨便按下,要特別注意 • 4 機器出現異常情況,應立即通知工程帥處理

  6. 注意事項---(二) • 5 生產線需要換線時若為最後一片, 爐前人員需將在此板子上空白處貼上防焊 標簽,並標明為“最後一片”,爐後人員見 到板子上有此標示方可收線

  7. 爐前日常事務 • 保養表的填寫 • 正確認識N2流量,并如實填寫到N2流量表中