1050mm

Rocker Simulation Summary. 1000mm. end strokes. 2140mm. 2 strokes per rocker per robot. 1600mm. 1050mm. Motion Time = 42sec @ 675mm/sec. GM Holden Bumper Conv Spd = 3.5M/min. Pitch = 3.5M Cycle = 60sec. Existing Plant System Layout. AP Base Clear. coat 1 backup.

kibo-hicks
Download Presentation

1050mm

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rocker Simulation Summary 1000mm end strokes 2140mm 2 strokes per rocker per robot 1600mm 1050mm Motion Time = 42sec @ 675mm/sec GM Holden Bumper Conv Spd = 3.5M/min. Pitch = 3.5M Cycle = 60sec.

  2. Existing Plant System Layout AP Base Clear coat 1 backup coat 1 coat 1 coat 1 coat 2 backup GM Holden Bumper Conv Spd = 3.5M/min. Pitch = 3.5M Cycle = 60sec.

  3. Existing Plant Cross Section