An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIMATE CHANGE AND INDIA’S ENERGY POLICY Dr. Anshu Bharadwaj Center For Study Of Science, Technology & Policy, Bangalore ASIAN CLIMATE CHANGE AND VARIABILITY : TRENDS AND POLICY JULY 22, 2011

  2. India’s primary energy consumption : a snapshot In 2010 alone, India’s primary energy consumption grew by 9.2% CSTEP July 2011 Source : BP statistical review of world energy, 2011; CSTEP

  3. India's energy aspirations • Annual GDP growth projection : 8 – 9% • Elasticity of electricity : GDP ~ 0.95 • Net electricity generation required in 2020 : 1850 billion units • per capita electricity consumption in 2020 : ~ 1200 kWh • Still, well below world average of 2800 kWh • India has announced intent to reduce CO2 intensity: GDP by 20-25% from 2005 levels by 2020 • Multiple objectives for Indian energy policy • Access for all • Reliability • Low cost • Low carbon • Energy Security CSTEP July 2011

  4. Electric Power • Current Capacity : 173,855 MW (utility) • 5th largest in the world • Low per capita electricity consumption • India 717 kWh • US 14,000 kWh • China 2500 kWh • World 2800 kWh • Peak shortage ~ 15% • 800,000 MW in 2030 – 40 • ~ 25,000 MW per year • Environmental concerns • India 3rd largest emitter of CO2 behind China and US • 38% of emissions from power sector • Energy security concerns • 67% power from coal-based thermal plants - need to depend on imports • Prototype breeder reactors to exploit thorium reserves CSTEP July 2011

  5. Environmental concerns : ghg emissions in India (2007) CSTEP July 2011

  6. Energy resource availability in India Source : BP statistical review report, NHPC,NTPC CSTEP July 2011

  7. Energy security concerns Source : Telegraph, FT CSTEP July 2011

  8. Projected fuel mix in 2020 • Required capacity in 2020 assuming 8% growth = 387,280 MW in BAU scenario CSTEP July 2011 Source : Interim report, Planning commission 2011

  9. How to Grow and be Sustainable? • How do we grow to ~ 2,000 billion kWh by 2020 • How do we get 3,00 billion kWh of low-carbon power? • What fuel options & technologies? • Wind • Nuclear, • Solar • Hydro • Bio-fuels • Carbon Sequestration • Hydrogen & fuel cells • Hybrid cars • Investments, research, policies? CSTEP July 2011

  10. Wind power • India - 5th in wind capacity • Power proportional to V 3 • Cost of generation reasonable: ~ Rs 3 per kWh • Economics sensitive to wind speeds • World total installed 194,000 MW • India: • Potential: 50,000 MW based on hub height of 50 m and 2% land usage • Recent studies offer reassessed potential at 80m 6-7% land usage • Onshore - 676, 000 MW • Offshore - 214,000 MW • Intermittent; grid stability is a concern CSTEP July 2011

  11. solar power • JNNSM launched in 2010 targets 22,000 MW by 2022 • Phase 1 ( until March 2013) • Target of 1300 MW : 800 MW PV and 500 MW CSP • 25 years of guaranteed feed in tariff • Off-grid PV • Target of 2000 MW by 2022 • Rural applications where grid is unviable or unreachable • Challenges • High nominal cost of generation : ~ Rs 15 per kWh • Water scarcity issues for CSP • Requirement of skilled personnel CSTEP July 2011

  12. Nuclear Power • Installed Capacity 4780 MW • Generation ~ 23 Billion kWh (2.5 % of total) • Domestic Uranium reserves ~ 61,000 Tons • Poor quality ore (0.01% - 0.05% Uranium) • Large Thorium deposits • But, Thorium is fertile and has to be converted to fissile U233 in a reactor • Phase Nuclear Program • Phase I Build Pressurized Heavy Water Reactors using domestic Uranium • Phase II Reprocess spent fuel from Phase I to get Plutonium for Breeder Reactors • Phase III Use U233 (obtained from Thorium) and use it with Plutonium • Domestic Uranium reserves can sustain 10,000 MW PHWR for 40 years • Low capacity factors due to Uranium mining constraints CSTEP July 2011

  13. Indian nuclear power program Nuclear capacity presently under construction : 5300 MW CSTEP June 2011

  14. Electricity generation costs : comparison CSTEP July 2011 Source : LBNL, CERC , CSTEP & NPCIL

  15. Demand-side measures : smart grids • Indian Institute of Science & CSTEP • “Smart grid” test bed in IISc campus • Consortium of technology provider companies • Ministry of Power (under R-APDRP)

  16. Biofuel Potential • India’s total land area 328 million hectares (mha) • Cultivated 142 mha • Cultivable wasteland 30 mha • Rice 40 mha • Wheat 26 mha • Hazardous to divert agricultural area for bio-fuels. • If entire wasteland used for growing bio-fuels, • Produce about 30 million tons of bio-oil • 10% of oil demand by 2031. • Advisable to cultivate on such a large area? CSTEP July 2011

  17. Ethanol Opportunities • Increase yield of sugarcane using drip irrigation & fertigation • Present average yield ~ 80 tons per ha • Using drip irrigation & fertigation 150 tons per ha • Sweet sorghum: • Less water intensive than sugarcane • Two crops a year • Cellulosic ethanol from agro-forest residues such as bagasse, rice husk, wood chips, crop residues. • Technology needs to be developed CSTEP July 2011

  18. What can 1 Hectare Do? Bio-Fuels indirectly use solar energy Why not do it directly? Solar CSTEP July 2011

  19. Land required(ha/1000 MW) Source : NPCIL & CSTEP CSTEP July 2011

  20. potential R&D domains • New and affordable materials for photovoltaic • Clean coal technologies; carbon capture and sequestration • Low-speed wind power • Cellulosic ethanol • Efficient and affordable hybrids, electric vehicles • Energy storage – efficient batteries and condensers • Demand side management of power • Trained human resource CSTEP July 2011