1 / 19

SPO Overview and Power Template

SPO Overview and Power Template. Agenda Power Industry Background and Drivers Business environment SPF as an industry distinctive SPO Overview 2007/2008 Modularized approach From SPO to power template SPO power template 2008 content, product versions and schedule

kerry
Download Presentation

SPO Overview and Power Template

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPO Overview and Power Template Agenda • Power Industry Background and Drivers • Business environment • SPF as an industry distinctive • SPO Overview 2007/2008 • Modularized approach • From SPO to power template • SPO power template • 2008 content, product versions and schedule • Plan for 2009 and Siemens suggestions • Cable/cable drum handling process example

  2. SP Enterprise for Owner Operators – SPO Overview 2007/2008 – ERP / EAM 3 discrete solutions covering the complete life-cycle Content Management Safety Management Reliability Management Contractor Project Systems DCS

  3. Dynamic Design Basis SPO 2007– Maintenance &Engineering Browser – Common Web Portal ERP (SAP, Maximo, Ventyx, Oracle EAM) DCS/ Automation Reliability Integrated Project Execution Safety Content Management

  4. SPO Roadmap This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

  5. SPO CORE • Plant Information Loading & QC • Plant Breakdown Structure (PBS) and Tag Management • Document Management • On Plant Engineering & Design • Conceptual Engineering • Vendor data capture • Inspections & Audits Assistant • SPO Operating Plant • Plant Information Browser • Operation changes management • Isometric maintenance • Brownfield data capture • Brownfield/Greenfield data validation, transformation and loading • Engineering assistant for Reliability • Engineering assistant for Maintenance • Engineering assistant for Safety • DCS Change Management • Intelligent Manuals • Plant Optimization Assistant SPO 2007 SPO 2008 SPO 2007 SPO 2008 SPO 2008 Dynamic Exchange/Handover • SPO Project Execution • Change Management (MoC) in Projects • Interface Control • Technical/Site queries and issues • Non-conformities/Waivers • Fabrication Records Management • Uncertainty/Risk management • Commissioning/Completion (Start up) OO Challenge and SPO Solutions OO Green/brown field Projects OO Operations and M&M Operations Preparation for Operations Modifications Project Execution EPC Contractors Mechanical Completion Commissioning Feasibility Feed/ Pre engineering Construction Concept OO Early Phase Design/ Engineering Procurement

  6. SPO Overview and Power Template Agenda • Power Industry Background and Drivers • Business environment • SPF as an industry distinctive • SPO Overview 2007/2008 • Modularized approach • From SPO to power template • SPO power template • 2008 content, product versions and schedule • Plan for 2009 and Siemens suggestions • Cable/cable drum handling process

  7. Going Forward Solution Banner Solution Business Package Core PBS WBS Core SPO Operating Plant Tool Integrat. 2D/3D Nav. Tag Project Execution Docs Data Sheet Model / Asset Core Change Xmtl Office Integrat. SPX Power Eng. & Dgn Concept. Eng. Browsing Core SPLS Data Capture VTL Reliability Verification Cable Est. Power Content Offline Edit Foundation KickStarts NCR VTL TQ

  8. Each Business Package is… Solution Banner Solution Business Package Documentation PBS WBS Core Core Workflows AVIs Documents SPO Operating Plant Tool Integrat. 2D/3D Nav. Tag Project Execution Docs Data Sheet Model / Asset Content Core Change Xmtl Office Integrat. SPX Schema Load Files Seed DBs Power Eng. & Dgn Concept. Eng. Browsing Core SPLS Data Capture VTL Reliability Verification Code Cable Est. Power Content Offline Edit Extensions Customizations KickStart VTL

  9. SPO Overview and Power Template Agenda • Power Industry Background and Drivers • Business environment • SPF as an industry distinctive • SPO Overview 2007/2008 • Modularized approach • From SPO to power template • SPO power template • 2008 content, product versions and schedule • Plan for 2009 and Siemens suggestions • Cable/cable drum handling process example

  10. SPO 2008 SPO 2008 SPO 2008 Dynamic Exchange/Handover OO Challenge and SPO Solutions • SPO CORE • Plant Information Loading & QC • Plant Breakdown Structure (PBS) and Tag Management • Document Management • On Plant Engineering & Design • Conceptual Engineering • Vendor data capture • Inspections & Audits Assistant • SPO Operating Plant • Plant Information Browser • Operation changes management • Isometric maintenance • Brownfield data capture • Brownfield/Greenfield data validation, transformation and loading • Engineering assistant for Reliability • Engineering assistant for Maintenance • Engineering assistant for Safety • DCS Change Management • Intelligent Manuals • Plant Optimization Assistant OO Green/brown field Projects OO Operations and M&M • SPO EPC templates • Power template • Others to follow Operations Preparation for Operations Modifications Project Execution EPC Contractors Mechanical Completion Commissioning • SPO Project Execution • Change Management (MoC) in Projects • Interface Control • Technical/Site queries and issues • Non-conformities/Waivers • Fabrication Records Management • Uncertainty/Risk management • Commissioning/Completion (Start up) Feasibility Feed/ Pre engineering Construction Concept OO Early Phase Design/ Engineering Procurement

  11. SPO Overview and Power Template Agenda • Power Industry Background and Drivers • Business environment • SPF as an industry distinctive • Overview 2007/2008 • Modularized approach • From SPO to power template • SPO power template • 2008 content, product versions and schedule • Plan for 2009 and Siemens suggestions • Cable/cable drum handling process example

  12. SPO Power TemplateVersion 1 and Road Map • Version 1 delivery is planned for end of 2008 • Based on SPF 4.2 and SP 2007 applications • SPF 4.2 is seen as precondition for nuclear control and approval authorities • Road Map 2009, 2009+ • User access control (based on new SPF 4.2 functionality and implemented practices • OOTB Integration with SPI and SPEL • Central KKS TAG management in SPF? • Design variations in SPPID • … This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

  13. SPO Power TemplateThe Business Packages • New Business Packages for Core (these Business Packages will be part of SPO power template) • SPRD with DIN specifications • 18 PAS piping specifications • 32 power related piping specifications • SPRD with Pipe Service Index (PSI) • Interface between SPRD and SPPID • Transfer piping specifications, allowed media per specification and selected components per specification • SPRD feeds SAP MM with component data • Other Business Processes from SPO might be included This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

  14. SPO – SPx for powerExample Workflow for PSI

  15. SPO Power Template The Business Packages 1 of 2 • Power related features for • SPF • KKS based integration (SPPID and SP3D) • KKS related schema extensions • PBS based on KKS • SP3D • Content for OOTB Drawing Generation in SP3D • HVAC catalogue for SP3D • Cable catalogue for SP3D This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

  16. SPO Power Template The Business Packages 2 of 2 • SPPID with KKS • KKS content with user friendly GUI • KKS mapping schema • OOTB KKS based integration with SP3D and SPF • Additional SPPID symbols with KKS relation • SPPID PSI • Load SPRD Pipe Service Index • Manage PSI data for projects • Activate/deactivate revisions This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

  17. SPO Overview and Power Template Agenda • Power Industry Background and Drivers • Business environment • SPF as an industry distinctive • Overview 2007/2008 • Modularized approach • From SPO to power template • SPO power template • 2008 content, product versions and schedule • Plan for 2009 and Siemens suggestions • Cable/cable drum handling process example

  18. SPx Power Template Future drum calculation process • For clarification of the business process • Are your current processes for cable and drum handling comparable? • How should this process overview be changed? SPEL Cable Report Publish Cable Tags w/ Lengths SP3D Autorouter Process Managed by SPF Integration

  19. Areas Being Evaluated for Power Template Concept • VGB KKS conform naming conventions in P&ID • Integrate SPPID with SPF and SP3D based on VGB KKS • Standardized 2D drawing generation form 3D model • Reference piping data for ANSI, DIN, JIS ready for SP3D • PSI (Pipe service Index) Integration SPRDSPPID • Integration SPRDSAP

More Related