280 likes | 360 Views
Presentation on the conceptual view of PANDA Muon System and its components including Target Spectrometer, Forward Spectrometer, Range System, and Analog/Digital Signal Processing. Discussion on muon and hadron detection, calibration, and plans for future development.
E N D
JINR Status Report on PANDA Muon SystemG.D.Alexeev on behalf of Dubna team, ITEP, Moscow, April 18, 2008 • Present conceptual view of PANDA Muon System based on RS • Target Spectrometer: * MC model setup * pi/mu separation * multiple scattering • Second coordinate r/o: * signals * electronics • Forward Spectrometer: * MC model setup * multiple scattering * RS in function of HCal: - RS 'stand alone' response to hadrons - combined calorimetry ECal + RS
HMI/RS µ - Filter Dipole RICH ECAL Target Spectrometer PANDA Muon and Hadron Detection in PANDA by Range System
MC model setup for Target Spectrometer ECal Solenoid Range System μ 0.8 GeV
Muon scattering and straggling at 0.8 GeV ECal Solenoid Range System μ 0.8 GeV Beam dia. 170 mm Muon straggling
Anode and induced strip signals from MDT Trace 1: Anode signal, K≈60 mV/μA Trace 2: Strip signal, inverted, K≈480 mV/μA
MDT signals analog R/O of the PANDA MUON TRACKER AA-QTC card 16 ch Serial data Interface Signal QTC TDC Ampl 8.3 Ampl 8.3 16ch THRout THRin Q I in I out ` TIME • Analog R/O for MDT (strips &/or pads) • Using well known Wilkinson principle for Charge-to-Time Conversion • Using TDC chip as proven solution for pipe-line R/O
MC Model for Forward Spectrometer Hadron & Muon Identifier based on RS (HMI/RS) instead of HCal ECal / Shashlik HMI / RS 7 GeV 380 layers (Sci. 1.5mm + Pb 0.3 mm) 16 layers x 6cm /Fe interleaved with MDTs
Muon scattering in Forward Spectrometer ECal HMI / RS μ 3 GeV
Stand alone (no ECal) HMI / RS response to hadrons Analog signal “Digital” signals (hits) Better than analog mode!
Energy Deposition in ECal + HMI/RS for 7 GeV Pions Events with different energy deposition ratio between ECal and HMI/RS
Combined Calorimetry Calibration for ECal + HMI/RS Pion beam, 7 GeV Scatter plot Averaged calibration ECal signal, MeV HMI/RS signal, hits Energy, MeV
Combined Calorimetry Calibration for ECal + HMI/RS Antiproton beam, 7 GeV Scatter plot Averaged calibration ECal signal, MeV HMI/RS signal, hits Energy, MeV
Combined calorimetry ECal + HMI/RS:Reconstructed vs Deposited Energy Antiprotons, 7 GeV Pions, 7 GeV reco reco depo depo
Conclusions: • TS - generally understood, ready for r/o optimization • FS - HMI/RS looks adequate solution Plans: • GEANT model for RS in TS -> pending final yoke design • MC optimization of HMI/RS • Prototyping - RS and second coordinate r/o -> pending money