An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E-Reps Forum 2013 Industry Update 9 October 2013

  2. E-Reps Forum 2013 Industry Update Maitland Progress • Improved communications / working between HSE & DECC • Joint inspections / investigations • Joint pipeline meetings • Sharing of enforcement information • BEST Course • More DECC Inspectors • More inspections • Discussions with e-reps

  3. E-Reps Forum 2013 Industry Update Environmental Alerts • Venting of Bulk Chemicals • Release at Fiscal Metering skids during cargo offloads • Procedures not followed for critical tasks. • PON1 reporting, which must be within 6 hours. • Management of Change https://www.gov.uk/oil-and-gas-environmental-alerts-and-incident-reporting

  4. E-Reps Forum 2013 Industry Update 2012/13 Inspection Findings • 72 Inspections (Sep ‘12 – Aug ‘13) • 51 Production / 21 Drilling • 8 regulatory breaches / inspection average • 2 – 15 regulatory breaches on every production inspection (except 1) • Majority could be prevented by proper awareness of allconcerned

  5. E-Reps Forum 2013 Industry Update EC Directive • The European Directive on safety of offshore oil and gas operations has now been adopted • The UK (DECC, HSE, etc.) will have to implement the Directive by 19 July 2015 • Non-production installations, including Mobile Drilling Units, well operations and planned production installations will have up to 12 months to meet requirements • Transitional arrangements for existing production installation will commence in 2015 and must be completed by 19th July 2018

  6. E-Reps Forum 2013 Industry Update EC Directive • DECC and HSE have identified the Articles on which DECC, HSE and MCA will lead • Gap analysis and assessment of impacts on the UK regime is ongoing – options will follow • Considering how to meet the competent authority requirements

  7. E-Reps Forum 2013 Industry Update EC Directive • Changes to DECC Regulations to meet Directive Requirements • Major Accident Reports • Oil Spill response & planning • Environmental Management Systems • ECE

  8. THANK YOU