BGRR Event • On 11-29-11, a subcontractor fell approximately 16 feet from a scissor lift with a hinged guardrail system. The worker was participating in the process of torch cutting. The worker was leaning against the extended rear guardrail of the scissor lift platform when it folded outward into the down (retracted) position, allowing the worker to fall. The worker was hospitalized with multiple fractures
Fall from Height Issues • Investigation of recent injury at BGRR shows: • Complacency using a scissor-lift; other hazards at the job site drew safety awareness away from the hazards of scissor-lifts • No pre-use inspection and no pre-use inspection checklist; work planning did not ensure a pre-use inspection • Teamwork and communication were less than adequate; each thought the other did the inspection; no questioning attitude • What we can do: • Show concern for others – co-workers should question each other (e.g., did you do the inspection, do you have the PPE…) • Ensure yourself that all hazard controls are implemented for the job before beginning the work • Reduce stressors in the workplace (i.e., report suggested cost cutting may have been a stressor)
FDA Cites Manufacturer for Not Following up on Complaints • Nebraska facility recalls of 1,645 lots of Excedrin, Bufferin, NoDoz and Gas-X • Consumers are advised to stop using the products • Accidentally packaged with painkillers made at the same facility including Percocet, Endocet, Opana and Zydone • A manufacturing problem allows pills to become stuck in the machinery and carry over to the packaging of other products • FDA cited this manufacturer for failing to investigate 389 complaints of mixed-up pills found in bottles since 2009
First Place Award, Least Amount of Lumber in a Makeshift Scaffold