Cad Database Server Purchase. Hardware Proposal. Component Interaction. Teamcenter Engineering System Component Interaction The following slide shows how processes are connected and provides an overview to illustrate the following points:.

Related searches for Cad Database Server Purchase

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Cad Database Server Purchase' - kemal


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Cad database server purchase

Cad Database Server Purchase

Hardware Proposal


Component interaction
Component Interaction

Teamcenter Engineering System Component Interaction

The following slide shows how processes are connected and provides an overview to illustrate the following points:

  • Portal clients connect to imanserver similar to the way Web clients connect to a Web server.

  • Motif clients connect directly with the Oracle database and Teamcenter Engineering data vaults using SQLNet and NFS (or iMANFS) respectively. Custom clients using the apiserver process are similar to Motif clients.



Dedicated oracle servers
Dedicated Oracle Servers

  • Oracle to run stand alone is the goal, is the preferred way to run oracle, ‘best practices’.

  • One development env, a matching production env.

  • Have had instances with d0ora2 where a stand alone environment would have prevented downtime.

  • Stand alone server is the cdf and minos model.

  • Prevents competition for resources with the database, decreasing potential downtime.


Planning Teamcenter Engineering Servers

The critical decision for the Teamcenter Engineering implementation team is the

sizing and placement of Oracle, vault and application servers. (for example, Portal,

Web). Again, this is highly dependent on network infrastructure and Teamcenter

Engineering usage profiles. Network traffic between the Teamcenter Engineering

shared servers and the Oracle server is proportionally greater than that between a

server and its clients. Therefore, the network connection between Teamcenter

Engineering servers and the Oracle server should be high bandwidth and low latency. Teamcenter Engineering server communication with the clients is more tolerant of low-speed, high-latency networks.


Vault servers
Vault Servers

  • The vault servers house the ‘real’ data, and will be supported by the cad divisions, not dsg.


Non dbserver support
Non DbServer Support

Propose to run the non db server apps on a separate NT machine(s). One NT for production, the other for development and other instances.

  • Apache web server

  • Portals

  • Licenses


Teamcenter Engineering Portal Servers

Portal implementations have a variety of configuration options, as previously described. Like the Teamcenter Engineering Web server, the Teamcenter Engineering Portal server is also computationally intensive and is best served by a machine with a high SPECint rate (throughput) rating. Portal servers also require significant amount of memory (multiple gigabytes) to support large numbers of users.


Development environment
Development Environment

  • The TeamCenter development environment will mirror the production environment to enable routine testing and application of patches, etc.

  • 1 database server machine, 1 NT for other apps.

  • Potentially servering dev, int, and train databases.


One license vs duals
One license vs. duals

  • Pros:

    • 1 license to support

  • Cons:

    • 1 license to mess up both production and development. This is not in line with dsg’s standards and procedures.

    • Working with vendor to supply a dev license for free, limiting # of users, but non temporary.

    • Dual licenses will allow us to separate out developers and trainers from production.


Ideas licenses product users desc

A001 24 Core Master Modeler

A002 21 Core Drafting

A003 20 Surfacing Set

A004 20 Assembly Set

A009 8 Simulation Modeling Set

A010 5 Simulation Solution Set

A052 1 Sheet Metal

A054 1 Model Solution - Nonlinear

A055 1 Laminate Composites

A061 1 TMG Thermal

A083 1 Drafting Symbols Catalog

A084 1 Standard Parts Catalog

A086 1 Material Data Catalog - MDLA

A088 1 Material Data Catalog - MIL5

A103 1 STEP Data Translator

A107 5 ABAQUS Data Translator

A108 5 ANSYS Data Translator

A121 1 Autocad Data Translator

A145 5 Response Analysis

A156 1 Mechanism Simulation

A172 19 Mechanism Design

A180 25 Master Notation

A200 25 Take home Licensing

A314 95 Artisan Drafting

A646 1 VRML Annotation

A801 25 Update Training

Ideas Licensesproduct users desc


Teamcenter licenses product users desc
TeamCenter Licenses product users desc

IM11500 1 TcEng - Product Engineering Server

IM11505 1 TcEng - Web Access

IM11510 10 TcEng - Consumer

IM11520 10 TcEng - Author

IM11680 1 TcEng - Integration Toolkit

IM11720 16 Oracle Tier 1 Runtime

IM11735 70 Oracle Tier 3 Runtime

IM11910 1 TcEng - AutoCAD Integration - 10

IM11915 60 TcEng - NX Manager I-deas

IM11918 10 TcEng - NX Integration I-deas

IM12805 60 TcEng - Portal Visualization Standard

IM12810 10 TcEng - Portal Visualization Professional


Ugs cast licenses product users desc
UGS CAST licenses product users desc

CA10000 1 Unigraphics NX CAST Online

UG10000-WISD 1 NX Software and Doc Media UGID100 1

UG/DESIGNER BUNDLE for Ideas

UGID105 5 UG/Drafting for Ideas Bundle

UGID130 3 UGManufacturing Set for Ideas

UGID135 1 Variable Axis Milling

UGID210 2 UG CAM Bundle Upgrade for Ideas


Ugs corp maintenance proposal costs fy05
UGS Corp. Maintenance Proposal costs fy05

UGS Corp. Maintenance Proposal cost for fy05

Ideas products: $150,773.00

Teamcenter Engineering product: $48,375.00

UGS CAST products: $14,142.84

Total ----------- $213,290.84